Table of Contents
OBJECTIVE AND SCOPE
Objective of this Procedure
This document's objective is to provide a guide to ZPRC, ZMAT (raw and manufactured), ZVER, ZERS, ZBOM, ZUNB and PIR Material master data management for GBU Composite Materials (Legacy Cytec organization).
Material Master Data management process includes creation and modification of the material, its inactivation and flagging for deletion, and reactivation if needed, as well as mass modification.
Creation of Basic Data, Classification, Sales, Foreign Trade, Purchasing, General Plant Storage, Warehouse Management and Label Data Views will be presented in this procedure. Management of MRP, Work Scheduling, Quality Management, Accounting and Costing Views is being performed by Process Teams. Accounting and Costing views are created by Riga Data Operations when extending materials to Trading Plants. For Sample codes Riga Data Operations is creating all necessary views.
Requests of Composite Materials Material Master creation or maintenance should be submitted via Sharepoint platform which will send out an automatic FreshDesk ticket to Data Team within which the material maintenance should be done.
The referral lists mentioned in this procedure, such as Material Groups, Purchasing Groups and Profit Center List are embedded in Sharepoint platform already.
Scope
Under Riga Data Operations scope is the management of ZPRC, ZMAT (raw and manufactured), ZVER, ZERS, ZBOM, ZUNB and PIR Material master data management for GBU Composite Materials (Legacy Cytec organization). Riga Data Operations can create and extend ZDIE materials if requested so by Finance.
Material Type | Description | Division |
|---|---|---|
ZPRC | Commercial Products | N/A |
ZMAT | Finished Goods | Multiple |
ZVER | Packaging | WD |
ZUNB | Stocked and non-valuated materials | WD (for packaging) |
ZDIE | Services | Multiple |
PIR | Purchase Info Record | |
| ZERS | Industrial supplies | |
| ZBOM | Phantom assemblies |
Abbreviations
Abbr. | Description | Abbr. | Description |
|---|---|---|---|
RCS | Rhodia Core System | SBS | Solvay Business Services |
ZDIE | Service | UoM | Unit of Measure |
ZMAT | Finished product, semi-finished product, raw material | HSE | Health, Safety and Environment |
ZPRC | Commercial Product | MSDS | Material Safety Data Sheet |
ZUNB | Stocked and not valuated material | MRP | Material Resource Planning |
ZVER | Packaging | DG | Dangerous goods |
| DGL | Data Governance Lead |
Roles and responsibilities
ZMAT setup can be performed only once both ZPRC code and MSDS are available.
Prior to submitting a new ZMAT request, it is the requester´s responsibility to ensure the material does not exist in SAP already, so no duplicates are created in the system. If the material was not found, the TS SAP Material request form or Composite Materials Sharepoint must be filled and submitted to Data Operations for material master setup in SAP. A second search in the system is performed by the Data Management team to ensure no duplicates are created.
STANDARD OPERATING PROCEDURE DESCRIPTION
Creation of material in RCS
Pre-requisites
Manufactured ZMAT setup can be performed only once both ZPRC code and MSDS are available. Prior to material creation in the system search is performed by the Data Operations team to ensure no duplicates are created.
- Use the transaction MM03 to access display material view
- Press multiple choice button to receive pop-up window with search options for material master.
- Click on to open the menu
- Select the option 'Material Number/Material Description' and/or 'Materials by Commercial Product (PRCOM)'
- Run a search in Material Description
- Use Wildcards to best describe
- Open the material request form, copy the short text from the requested material and run a search in Material description with wildcards.
- Hit Enter
- Verify entries found – compare results with the material's "short description" mentioned in the request form. If you have doubts about the material already created, contact the Requester to clarify.
- If result points to or if the Requester mentions a new article need to be created then proceed with the creation.
- Note: for GBU Composites, even though the new material is a duplicate, the requester may still want to have the new duplicate material created. Such duplicates are then distinguished from each other by the field 'Old material number'. As stated above, contact the Requester to clarify.
Creation of ZMAT - Manufactured Material
Use MM01 transaction to create material
| Main activities | Key points |
|---|---|
| Industry Sector | Always choose "Chemical Industry" |
| Material Type | Select the material type indicated in the request form |
| Copy from… Material | Option to copy data from an existing material can be useful in some cases. |
| Hit Enter |
Before creating the Manufactured Product for For Composite Materials (Aero) check if there is a ZUNB already created!
Tip!
Hit Enter
- Fill in Organizational Levels
- Plant: as indicated in request form. If the plant is 8368 or 8370, always extend it to plant 8818 using the information in the overflow process.
- Storage location: check the GBU Composite Materials file and open the material for the active (not scratched) storage locations correspondent to each plant that does not have an "X" in the spare column or ''DO NOT USE'' included in the locations description.
- Sales Organization/Distribution channel:
- Always extend to Distribution channel 0A listed with an "X" at the Distribution channel of the corresponding plant being requested, on the GBU Composite Materials file.
- open to the external Sales Organization based on the request, but can be only extended if listed with an "X" at the Distribution channel on the GBU Composite Materials file.
- See example below for plant 8350: the material is allowed to be created/extended to Sales Organization GB40, US37 and US32/ See Picture Example
- Extension to CN sales organization, require approval by the Product Line Manager, Export Compliance Team, Sales Manager from China and add Plinio Morgonni in CC.
- Distribution channel 0A:
- Distribution channel 0B:
Sales areas US33/0B/0A only to be used for materials with ''CDM'' included in the description
- Intermediate materials should NOT be opened to Sales organization under distr. Channel ‘’0B’’
- Intermediates CAN be extended to Sales organizations under distr. Channel ‘’0A’’, if requested.
- Warehouse: Always extend to Warehouse number based on the GBU Composite Materials file per plant in sheet IM-WM
- Example: For plant 8350 (Wrexham) extend to Warehouse number 087
- Hit Enter
- Basic data 1
- Basic data text
- Descriptions
- Units of measure
- Proportion/prod.unit
- Basic Data 2
- Classification -Batch
- Classification -Material class
- Sales: sales org. 1
- Sales: sales org. 2
- Sales: general/plant
- Foreign trade export
- Purchasing
- Plant data / stor. 1
- Plant data / stor. 2
- Warehouse mgmt 1
- Warehouse mgmt 2
- Quality Management
- Label Data
- Labeling Specification
- Completing the material
Basic data 1
| Main activities | Key points |
|---|---|
| Material Description | Check the request form for "SHORT DESCRIPTION" The description should be always in Upper case |
| Base Unit of Measure | Copy from template |
| Material Group | Finished goods, SF goods – 0450 |
| Old Material Number | Can be used for Heanor materials to reflect the document reference code - check the template. (Note: for Heanor materials, sometimes the field is populated with 'N/A' in the form. In this case, the field is to be populated in SAP with the field value 'N/A'). |
| Division | Check the request form |
| General Item Category Group | ZMAT – NORM |
| Gross Weight | Check the request form If the Base UOM is not KG, the Gross and Net Weight should not be 1 |
| Net Weight | Check the request form If the Base UOM is not KG, the Gross and Net Weight should not be 1 |
| UoM for Weight | Always KG |
| Packing Group | Check the request form 0005 - for packed materials and Samples |
| Ref. mat. for pckg | Default number 1911973 |
| Go to Basic Data Text tab by pressing Basic Data Text button | Basic data text tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence. |
Basic data text
| Main activities | Key points |
|---|---|
| Basic data text | Material long description (copy from the form). If not provided copy the short description Use button to add languages. Copy English text to all other languages: 12 mandatory languages are: |
| Go to Descriptions tab | From Basic Data View Descriptions tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence. |
Descriptions
| Main activities | Key points |
|---|---|
Material descriptions in local languages | 12 mandatory languages are: |
| Go to Units of measure tab | From Basic Data View Units of Measure tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence. |
Units of measure
| Composite Materials | |||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Alternate Units of Measure conversions If there is any change/update request in the Alternative units of measure, before updating check if the material is shared. File for Weight and Width conversions. | |||||||||||||||||||||||||||
Add all the Alternative Conversions provided in the form (Tab: Alternative UoM Calculator), additional conversions in the same dimension. Do not enter a PAL UOM for Totes (IBC). | For example: If the requester provides units of measure in KG and M, then add the conversion for LB, FT and YD.
| ||||||||||||||||||||||||||
If packaging conversion is not provided by the labeling view (in the form) we should add the table for BX,DR, PAL (applicable for all ZMAT - FG and RM) | For example: If the requester does not provide Alternative units of measure for Packaging and Pallet, add the default conversion based on the Base Unit of measure and Packaging. If you have Base Unit of measure in M and the Packaging type BX, then add 1 BX = 500 M and add 1 PAL = 5000 M.
for BULK only add the default LB conversion If the Matl Grp Pack.Matls is 0007 (Basic Data 1) : the Component material should have the conversion between base unit of measure and primary packing unit that will be managed in the BOL (Bill of lading). Example: If requester provides the exact conversion in the form then create the material with the information provide, if not, then add default conversion between Base unit of measure and primary packaging unit. Note! If there is any change/update request in the Alternative units of measure, before updating check if the material is shared.
| ||||||||||||||||||||||||||
Proportion/prod.unit
| Main activities | Key points |
|---|---|
This field is only available after the material creation, so remember to come back and populate this field after completing the creation! | |
| Units meas. use | Default value - B Not to be used only for Heanor! |
| Return to Main Data | |
Basic data 2
| Main activities | Key points |
|---|---|
| Go to Basic data 2 view | |
| Basic material (related ZPRC Code) | Check the Sharepoint request
|
| Dangerous Goods indicator profile | ZIP (DG Classification in progress) for all materials at the moment of material creation. If there area other materials on the system already using the same ZPRC code, and the existing part is already classified as being Z00 or GPP, this info can be applied to the new material as well. |
| Tick Environmentally relevant | Mandatory for all Finished and semi-finished goods |
| Go to Classification view |
Classification - Batch
| Main activities | Key points |
|---|---|
| Select "Batch" type of Classification | |
| Enter Class | 016 – Composite Materials |
Classification - Material class
| Main activities | Key points |
|---|---|
| Class | Default value - Z_CM_MAT |
| Copy all the values provided in the form in "Classification" tab | All the green fields in the template are mandatory! |
| Press Next screen button to move to next selected view |
If requester adds new value in the template for classification, we should send to Plinio Morgonni (plinio.morgonni@syensqo.com) for approval
If new Recommended Storage Statement is required then ask for Approval from Plinio Morgonni. Only after the approval is received. go to transaction ZWIMT019. Add the new entries and save it.
Sales: sales org. 1
| Main activities | Key points |
|---|---|
| X-distr.chain status | Status 63 is to be set at the moment of material creation to allow use of material in operations |
| Valid from date for X-distr.chain status | Date of creation or extension Format: DD.MM.YYYY |
| Delivering Plant | Check the request form Used for Heanor plant. Check the template. |
| Maintain Tax classifications | System will automatically determine which Countries' tax lines should be added Always 1 for all countries unless otherwise indicated by Finance or Tax department |
| Min. order qty. | Used for Heanor plant. Check the template. |
| Delivery unit | Used for Heanor plant. Check the template. |
| Unit of measure of delivery unit | Used for Heanor plant. Check the template. |
| Rounding Profile | Used for Heanor plant. When delivery unit is populated - Default value Z000 |
| Go to Sales: sales org. 2 view |
Sales: sales org. 2
| Main activities | Key points |
|---|---|
| Material statistics group | Always 1 |
| Account assignment group | Check the request form |
| Item category group | Check the request form ZMAT – ZMAN in SAP |
| Material group 2 | If informed in the template and the Matl Grp Pack.Matls is 0005 → Enter KIT If informed in the template but the Matl Grp Pack.Matls is 0007, leave the field blank |
| Go to Sales: general/plant view |
Sales: general/plant
| Main activities | Key points |
|---|---|
| Material freight group | Check the request form Responsible: in Logistics Team will be responsible to update this value later. |
| Availability check | Default ZD Heanor T4 |
| Batch Management | Always checked |
| Transportation Group | Check the request form, if the transportation group is not provided use value ZZZZ. This information is Global data, if there is a request to update this field Plinio Morgonni should be notified |
| Loading Group | Check the request form |
| Profit Center | Check the request form |
| Go to Foreign trade export view |
Foreign trade export
| Main activities | Key points |
|---|---|
| Comm./imp. code no. | Is NOT to be entered at the time of material creation – it will be loaded by responsible team Responsible for commodit code GTS team. |
| Country of origin | Check the request form Mandatory information! If not provided in the form, ask the requester |
| Go to Purchasing view |
(there should be a screenshot of the Import/Export view here)
Purchasing
| Main activities | Key points |
|---|---|
Purchasing Group | Check the request form |
| Plant-specific material status | Status Z1 is to be used at the time of material creation/extension Once Finance creates Accounting and Costing Views and performs material costing run, the status will be removed by Finance to allow use of material in operations. |
| Material freight group | Check the request form Same field is also available in: Sales: General Plant Data |
| Automatic Purchase Order indicator | Always checked |
| Batch Management requirement indicator | Always checked for ZMAT Same field is also available in Sales: General Plant Data, Plant data / storage 1 and Warehouse Management 1 views |
| Purchasing value key | Packed ZMAT – 0001 |
| GR processing time | Default value at the time of material creation – 2 1 day for Heanor plant 8400 |
| Go to Plant data / storage 1 view |
Plant data / stor. 1
| Main activities | Key points |
|---|---|
Temp. conditions | Enter Temp. conditions according to the template. This field is mandatory, if not provided reject the request |
| Unit of issue | This field is not populated upon creation If there is a request to update unit of issue, it needs to come via Sharepoints and the buyer's approval attached to the workflow. Purchasing, Inventory Management, and production needs to be involved as the Issue unit should be what is on BOMs.
|
| CC phys. inv. ind. | Default value at the time of material creation – B Plant data administrators will change the field value if necessary If the link does not exist with the plant, contact Plinio Morgonni (Composite Materials plants) and request the link creation |
| Batch Management | Always checked for ZMAT Same field is also available in Sales: General Plant Data, Purchasing and Warehouse Management 1 views |
| Minimum Remaining Shelf Life | Default value at the time of material creation – 1 Plant data administrators will change the field value if necessary |
| Total shelf life | Check the request form
Shelf life days should be consistent on Commercial Product level. |
| Go to Plant data / storage 2 view |
Plant data / stor. 2
| Main activities | Key points |
|---|---|
Profit Center | Same field is also available in Sales: General Plant Data view |
| Go to next view | Go to Warehouse Management 1 view |
Warehouse mgmt
| Main activities | Key points |
|---|---|
Batch Management requirement indicator | Always checked for ZMAT |
| Go to Warehouse Management 2 view |
Warehouse mgmt 2
| Main activities | Key points |
|---|---|
| No data has to be maintained in Warehouse Management 2 view at the time of material creation, however the view has to be created | |
Go to Quality view | |
Quality Management
| Main activities | Key points |
|---|---|
Inspection interval | Copy from the material form
|
Label Data
| Main activities | Key points | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Primary Packaging Unit (PPU) | Primary Packaging Unit (PPU): Copy from the form For BULK use KG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Select the primary packaging unit of measurement | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Press the indicated button to Import labeling specifications for selected packaging | Use possibility to import label specifications from model codes created Choose the reference material# based on the Base Unit of Measure and Packaging type
|
Labeling Specification
| Main activities | Key points |
|---|---|
Label Category, Label Size and number of Copies for each required label type | |
| Define Validity Areas for each label type | All label types – DELIVERY, GENERIC and MTS by default |
| Check if all labels have Validity Areas defined |
Completing the material
| Main activities | Key points |
|---|---|
When all data has been entered, save the material by pressing button and exit material creation | Copy number of the created material into communication to Requestor, system confirmation message on the bottom of the screen can be used: |
- If the request is to create a material in plant 8368 and 8370, always extend it to 8818 plant as well and generate a source list between them. Check the overflow process for more details.
- Perform material extension to other Plants / Sales Organizations if requested in the form.
- Extend the material to all of the Plants active storage locations
- Add Proportion/prod.unit ''B'' (Except for Heanor)
- Request PIR Creation only for intracompany extensions i.e. plant extensions requested for plants which are belonging to a different company code (note: for intercompany extensions, only source list is needed). Price is not mandatory, if not provided, set as 0,01. The purchasing org. 3200 can be used for intracompany transfers within WP2 system.
- Add the newly created material number in Sharepoint
- Release (approve) the Sharepoint
Export Control Compliance : ZNXLDAE_CTRL_GROUP. After 1 hour the newly created material will be available in this Tcode. Enter the material code in the transaction and press change. Then update the IP security field as 9&NA with the control group ID and then press save.
- GTS Classification compliance: For finished / semi-finished materials, the GTS classification should be reviewed. However, for requests handled via CM SharePoint, this step can be skipped, as a parallel process exists. Nevertheless, for more information on GTS topic, you can check: https://docs.google.com/presentation/d/1bPHEF2atMMloqiI8ttyeWR9tmXpyMqieN6LvJgNc34o/edit?usp=sharing
- Determine material DG indicator value (GPP or Z00) according to other materials related to the same basic material (ZPRC)
- Send a reminder once a week to the DG experts to update the DG file.
- How To:
- Access TCode SE16 on table MARA
- Enter the basic material in corresponding filter field
- Check other materials already classified with GPP or Z00
- If there are no references to other materials, access Composites - SYENS DG Indicator follow-up complete the necessary information and wait for Global Product Stewardship team to indicate the correct DG indicator value
- PS: Once a week access the file to check updates and eliminate the lines after completed on SAP (material master data responsibility)
DO NOT forget to check the DG indicator follow-up file once a week!
Creation of ZMAT - Raw Material
Use MM01 transaction to create material
| Main activities | Key points |
|---|---|
| Industry Sector | Always choose "Chemical Industry" |
| Material Type | Select ZMAT |
| Hit Enter |
- Plant: as indicated in request form
- Storage location: Check the GBU Composite Materials file and open the material for the active (not scratched) storage locations correspondent to each plant that does not have an "X" in the spare column or ''DO NOT USE'' included in the locations description.
- Warehouse: Open to correspondent warehouse listed on the GBU Composite Materials file
- Sales Organization / Distribution channel: Open only to the Intercompany Sales Organization listed with an "X" at the Distribution channel 0A on the GBU Composite Materials file.
- See example below for plant 8350: the material should be created/extended to Sales Organization GB40 and US37 / Distribution channel 0A
- Extension to CN sales organization, require approval by the Product Line Manager, Export Compliance Team, Sales Manager from China and add Plinio Morgonni in CC.
If we receive a request to extend the raw material to distribution channel 0B, a workflow in Sharepoint needs to be created using the Change flow and the EHS approval (Barbara Platt, Courtney Michael) needs to be attached to the flow.
- Basic data 1
- Basic data text
- Descriptions
- Units of measure
- Basic Data 2
- Classification -Batch
- Classification -Material class
- Sales: sales org. 1
- Sales: sales org. 2
- Sales: general/plant
- Foreign trade export
- Purchasing
- Plant data / stor. 1
- Plant data / stor. 2
- Warehouse mgmt 1
- Warehouse mgmt 2
- Quality Management
- Label Data
- Completing the material
Basic data 1
| Main activities | Key points |
|---|---|
| Material Description | Copy from the template In order to identify the correct category: check the Material Subcategory on Classification tab. |
| Base Unit of Measure | Copy from the template |
| Old Material number | Can be used for Heanor materials to reflect the document reference code - check the template. (Note: for Heanor materials, sometimes the field is populated with 'N/A' in the form. In this case, the field is to be populated in SAP with the field value 'N/A'). |
| Material Group | Always 0451 |
| Division | Always KV |
| Enter General Item Category Group | Always NORM |
| Enter Gross Weight | Copy from the template If the Base UOM is not KG, the Gross and Net Weight should not be 1. |
| Enter Net Weight | Copy from the template If the Base UOM is not KG, the Gross and Net Weight should not be 1. |
| Enter UoM for Weight | Always KG |
| Enter Packing Group | 0005 for Packed material 0001 for Bulk |
| Enter Ref. mat. for pckg | Enter default number 1911973 |
| Go to Basic Data Text tab |
Basic data text
| Main activities | Key points |
|---|---|
| Basic data text | Use button to add languages. Copy English text to all other languages: 12 mandatory languages are: |
| Go to Descriptions tab | From Basic Data View Descriptions tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence. |
Descriptions
| Main activities | Key points |
|---|---|
Material descriptions in local languages | 12 mandatory languages are: & – Brazilian Portuguese N – Dutch |
| Go to Units of measure tab | From Basic Data View Units of Measure tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence. |
Units of measure
| Composite Materials | |||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Alternate Units of Measure conversions on the Form | |||||||||||||||||||||||||||
Add all the Alternative Conversions provided in the form (Tab: Alternative UoM Calculator), additional conversions in the same dimension. Do not enter a PAL UOM for Totes (IBC) | For example: If the requester provides units of measure in KG and M, then add the conversion for LB, FT and YD.
| ||||||||||||||||||||||||||
If packaging conversion is not provided by the labeling view (in the form) we should add the table for BX,DR, PAL (applicable for all ZMAT - FG and RM) | For example: If the requester does not provide Alternative units of measure for Packaging and Pallet, add the default conversion based on the Base Unit of measure and Packaging. If you have Base Unit of measure in M and the Packaging type BX, then add 1 BX = 500 M and add 1 PAL = 5000 M.
Exception: for BULK only add the default LB conversion If the Matl Grp Pack.Matls is 0007 (Basic Data 1) : the Component material should have the conversion between base unit of measure and primary packing unit that will be managed in the BOL (Bill of lading) Example: If requester provides the exact conversion in the form then create the material with the information provide, if not, then add default conversion between Base unit of measure and primary packaging unit. If there is any change/update request in the Alternative units of measure, check if the material is shared before updating:
| ||||||||||||||||||||||||||
Return to Main Data | |||||||||||||||||||||||||||
Basic data 2
| Main activities | Key points |
|---|---|
| Go to Basic data 2 view | |
| Basic material number (related ZPRC Code) | If not provided in the form, check in the Sharepoint on EHS Info tab. |
| Dangerous Goods indicator profile | ZIP (DG Classification in progress) for all materials at the moment of material creation. If the material has one of the ZPRCs mentioned below, the DG indicator, should be Z00 ZPRC 90077853 Release Paper |
| Tick Environmentally relevant | Always flagged If the material has one of the ZPRCs mentioned below, the Environmentally relevant should not be flagged ZPRC 90077853 Release Paper |
| Go to Classification view |
Classification - Batch
| Main activities | Key points |
|---|---|
| Select "Batch" type of Classification | |
| Enter Class | 016 – Composite Materials |
Classification - Material class
| Main activities | Key points |
|---|---|
| Class | Default value - Z_CM_MAT |
Copy all the values provided in the form in "Classification" tab | All the green fields in the template are mandatory! |
| Press Next screen button to move to next selected view |
If requester adds new value in the template for classification, we should send to Plinio Morgonni (plinio.morgonni@syensqo.com) for approval
Sales: sales org. 1
Extended the composite materials for sales organization (distribution chanel 0A) as per image below:
| Main activities | Key points |
|---|---|
| X-distr.chain status | Status 63 is to be set at the moment of material creation to allow use of material in operations |
| Valid from date for X-distr.chain status | Date of material creation |
| Delivering plant | Check the request form Used for Heanor. Check the template |
| Maintain Tax classifications | Always 1 for all countries unless otherwise indicated by Finance or Tax department System will automatically determine which Countries' tax lines should be added |
| Min. order qty | Used for Heanor plant. Check the template. |
| Delivery unit | Used for Heanor plant. Check the template. |
| Unit of measure of delivery unit | Used for Heanor plant. Check the template. |
| Rounding Profile | Used for Heanor plant. When delivery unit is populated - Default value Z000 |
| Go to Sales: sales org. 2 view |
Sales: sales org. 2
| Main activities | Key points |
|---|---|
| Enter Material statistics group | Always 1 |
| Account assignment group | Check the request form, if not provided populate with F |
| Item category group | Always ZMAN |
| Go to Sales: general/plant view |
Sales: general/plant
| Main activities | Key points |
|---|---|
| Material freight group | Copy from the template If material freight group is not provided use value ZZZZZ |
| Availability check | Default ZD Heanor T4 |
| Batch Management | Always checked for ZMAT |
| Transportation Group | Copy from the template If the transportation group is not provided use value ZZZZ 'Hazardeous' groups to be used for materials having GPP DG Indicator |
| Loading Group | Copy from the template |
| Profit Center | Copy from the template |
| Go to Foreign trade export view |
Foreign trade export
| Main activities | Key points |
|---|---|
| Commodity/import code | Commodity/import code is NOT to be entered at the time of material creation – it will be loaded by responsible team |
Country of origin | Check the request form Mandatory information! If not provided in the form, ask the requester. |
Go to Purchasing view |
Purchasing
| Main activities | Key points |
|---|---|
Purchasing Group | Check the request form |
| Plant-specific material status | Status Z1 is to be used at the time of material creation/extension Once Finance creates Accounting and Costing Views and performs material costing run, the status will be removed by Finance to allow use of material in operations. |
| Material freight group | Check the request form Same field is also available in: Sales: General Plant Data |
| Automatic Purchase Order indicator | Always checked |
| Batch Management requirement indicator | Always checked for ZMAT Same field is also available in Sales: General Plant Data, Plant data / storage 1 and Warehouse Management 1 views |
| Purchasing value key | Packed ZMAT – 0001 |
| GR processing time | Default value at the time of material creation – 1 3 days for Heanor plant 8400 |
| Go to next view - Foreign trade Import | Values will be copied from Foreign trade export view |
| Go to next view - Plant data / storage 1 view |
Plant data / stor. 1
| Main activities | Key points |
|---|---|
Temp. conditions | Enter Temp. conditions according to the template This field is mandatory, if not provided go back to the requester N/A for Heanor plant 8400 |
| Unit of issue | This field is not populated upon creation If there is a request to update unit of issue, it needs to come via Sharepoints and the buyer's approval attached to the workflow. Purchasing, Inventory Management, and production needs to be involved as the Issue unit should be what is on BOMs. |
| CC phys. inv. ind. | Default value at the time of material creation – B Plant data administrators will change the field value if necessary If the link does not exist with the plant, contact Plinio Morgonni (Composite Materials plants) and request the link creation |
| Batch Management | Always checked for ZMAT Same field is also available in Sales: General Plant Data, Purchasing and Warehouse Management 1 views |
| Minimum Remaining Shelf Life | Default value at the time of material creation – 1 Plant data administrators will change the field value if necessary |
Total shelf life This field is mandatory, if not provided, reject the request | Check the request form Shelf life days should be consistent on Commercial Product level. If provided as "Indefinite": Add 5475 days This is global information, if is requested (from other GBUs) to add or change, contact other plants for approval or confirmation of correct value |
| Go to Plant data / storage 2 view |
Plant data / stor. 2
| Main activities | Key points |
|---|---|
Profit Center | Same field is also available in Sales: General Plant Data view |
Go to Warehouse Management 1 view |
Warehouse mgmt
| Main activities | Key points |
|---|---|
Batch Management requirement indicator | Always checked for ZMAT |
| Go to Warehouse Management 2 view |
Warehouse mgmt 2
| Main activities | Key points |
|---|---|
| No data has to be maintained in Warehouse Management 2 view at the time of material creation, however the view has to be created | |
Go to Quality view | |
Quality Management
| Main activities | Key points |
|---|---|
Inspection interval | Copy from the material form
|
| QM proc. active | Always flagged |
| QM Control Key | European plants - default REACH Other plants - default 0000 |
| Go to Label view |
Label Data
| Main activities | Key points | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Primary Packaging Unit (PPU) | Primary Packaging Unit (PPU): Copy from the form For BULK use KG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Select the primary packaging unit of measurement | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Press the indicated button to Import labeling specifications for selected packaging | Use possibility to import label specifications from model codes created Choose the reference material# based on the Base Unit of Measure and Packaging type
|
Completing the material
| Main activities | Key points |
|---|---|
When all data has been entered, save the material by pressing button and exit material creation | Copy number of the created material into communication to Requestor, system confirmation message on the bottom of the screen can be used: |
- Perform material extension to other Plants / Sales Organizations if requested in the form.
- Extend the material to all of the Plants active storage locations
- Request PIR Creation only for intracompany extensions i.e. plant extensions requested for plants which are belonging to a different company code (note: for intercompany extensions, only source list is needed). Price is not mandatory, if not provided, set as 0,01. The purchasing org. 3200 can be used for intracompany transfers within WP2 system.
- Add the newly created material number in Sharepoint
- Release the Sharepoint request (Approve it)
- Determine material DG indicator value (GPP or Z00) according to other materials related to the same basic material
- How To:
- Access TCode SE16 on table MARA
- Enter the basic material in corresponding filter field
- Check other materials already classified with GPP or Z00
- If there are no references to other materials, access Composites - SYENS DG Indicator follow-up complete the necessary information and wait for hazcom team to indicate the correct DG indicator value
- PS: Once a week access the file to check updates and eliminate the lines after completed on SAP (material master data responsibility)
- How To:
DO NOT forget to access DG indicator follow-up file once a week!
Creation of ZVER - Packaging
Use MM01 transaction to create material
Main activities | Key points |
|---|---|
| Industry Sector | Always choose "Chemical Industry" |
| Material Type | Select the material type indicated in the request form |
| Copy from… Material | Option to copy data from an existing material can be useful in some cases. |
| Hit Enter |
- Fill in Organizational Levels
- Plant: as indicated in request form
- Storage Location: check the GBU Composite Materials file and open the material for the active (not scratched) storage locations correspondent to each plant that does not have an "X" in the spare column or ''DO NOT USE'' included in the locations description.
- Sales Organization/Distribution channel: open only to the Intercompany Sales Organization listed with an "X" at the Distribution channel 0A on the GBU Composite Materials file.
- See image below for plant 8350: the material should be created/extended to Sales Organization GB40 and US37 / Distribution channel 0A
- Warehouse: Open to correspondent warehouse listed on the GBU Composite Materials file
Basic data 1
| Main activities | Key points |
|---|---|
| Material Description | Check the request form for "SHORT DESCRIPTION" The description should be always in Upper case |
| Base Unit of Measure | Copy from template If in the form the requester asks for EA → use PC (Pieces) If the packaging type is pallet, use KG (Kilogram) |
| Material Group | Copy from template |
| Division | Always WD |
| General Item Category Group | Always VERP |
| Gross Weight | Check the request form:
|
| Net Weight | Check the request form
|
| Weight Unit | Always KG |
| Matl Grp Pack.Matls | Default 0005 |
| Ref. mat. for pckg | Default number 1911973 |
| Go to Basic Data Text tab |
Basic data text
| Main activities | Key points |
|---|---|
| Basic data text | Material long description (copy from the form). Use button to add languages. Copy English text to all other languages: 12 mandatory languages are: If the long description is not provided copy the short description |
| Go to Descriptions tab | From Basic Data View Descriptions tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence. |
Descriptions
| Main activities | Key points |
|---|---|
Material descriptions in local languages | 12 mandatory languages are: |
| Go to Units of measure tab | From Basic Data View Units of Measure tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence. |
Units of measure
| Composite Materials | |
|---|---|
Alternate Units of Measure conversions |
|
Basic data 2
| Main activities | Key points |
|---|---|
| Go to Basic data 2 view | |
| Basic material (related ZPRC Code) | Always 90029754 Generic ZPRC number for all ZVER materials. |
| Go to Sales: sales org. 1 |
Sales: sales org. 1
| Main activities | Key points |
|---|---|
| X-distr.chain status | Status 63 is to be set at the moment of material creation to allow use of material in operations |
| Valid from date for X-distr.chain status | Enter current date Format: DD.MM.YYYY |
| Delivering Plant | Check the request form |
| Maintain Tax classifications | Always 1 for all countries unless otherwise indicated by Finance or Tax department System will automatically determine which Countries' tax lines should be added |
| Go to Sales: sales org. 2 view |
Sales: sales org. 2
| Main activities | Key points |
|---|---|
| Material statistics group | Always 1 |
| Account assignment group | Check the request form, if not provided populate with F |
| Item category group | Always ZVRP |
| Go to Sales: general/plant view |
Sales: general/plant
| Main activities | Key points |
|---|---|
| Availability check | Default KP |
| Transportation Group | Default 0001 |
| Loading Group | Default 0001 |
| Material freight group | Default EMBA
|
| Packaging mat. type | Default 0001 Entered only for pallets |
| Profit Center | Check the request form |
| Go to Purchasing view |
Purchasing
| Main activities | Key points |
|---|---|
Purchasing Group | Check the request form |
| Plant-specific material status | Status Z1 is to be used at the time of material creation/extension. Once Finance creates Accounting and Costing Views and performs material costing run, the status will be removed by Finance to allow use of material in operations. |
| Automatic Purchase Order indicator | Always checked |
| Purchasing value key | Default 0001 |
| GR processing time | Default value at the time of material creation – 2 |
| Go to Plant data / storage 1 view |
Plant data / stor. 1
| Main activities | Key points |
|---|---|
| CC phys. inv. ind. | Check the request form Plant data administrators will change the field value if necessary |
| Go to Plant data / storage 2 view |
Plant data / stor. 2
| Main activities | Key points |
|---|---|
Profit Center | Nothing should be entered as Profit center data are being copied from Sales: general/plant view |
| Go to next view | Go to Warehouse Management 1 view if applicable; else go to Label Data view. |
Warehouse mgmt 1
| Main activities |
|---|
No data has to be maintained in Warehouse Management 1 view at the time of material creation, however the view has to be created |
| Go to Warehouse Management 2 view |
Warehouse mgmt 2
| Main activities |
|---|
No data has to be maintained in Warehouse Management 2 view at the time of material creation, however the view has to be created |
| Save the material |
Completing the material
| Main activities | Key points |
|---|---|
Extend the material to all active storage locations |
For every packaging creation and extension, the PIR and Source List should be requested within the same request.
Creation of ZBOM- Phantom
Requester should provide us with correct Description and Plant where material should be created.
2 types of ZBOM:
- Packaging Kits (BUOM EA - Division WD) → assemble from 2 parts of packaging (combination, not consumed, it is a steps in the process, does not have inventory)
- Pre-mixes (BUOM EA - Division provided) → materials that are being used for BOMs
Create the material through MM01 transaction.
Enter Industry Sector and Material type:
| Main activities | Key points |
|---|---|
Enter Industry Sector | Always choose “Chemical Industry” |
| Enter Material Type | Always ZBOM for Phantom assemblies |
| Copy from… Material | Option to copy data from an existing material can be useful in some cases |
Select views to be created:
- Basic Data 1
- Basic Data 2
- MRP 1
- MRP 2
- MRP 3
- MRP 4
Fill in Organizational Levels.
- Plant: copy from the template
Sales Organization and Distribution Channel should not be filled
Basic data 1
| Main activities | Key points |
|---|---|
| Material Description | Check the request form for "SHORT DESCRIPTION" The description should be always in Upper case |
| Base Unit of Measure | Copy from template |
| Material Group | Default 0450 |
| Division | Copy from the form |
| Gross Weight | Default 1 |
| Net Weight | Default 1 |
| Weight Unit | Default KG |
| Go to Basic Data Text tab |
Basic data text
| Main activities | Key points |
|---|---|
| Basic data text | Material long description (copy from the form). Use button to add languages. Copy English text to all other languages: 12 mandatory languages are: If the long description is not provided copy the short description |
| Go to Descriptions tab | From Basic Data View Descriptions tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence. |
Descriptions
| Main activities | Key points |
|---|---|
Material descriptions in local languages | 12 mandatory languages are: |
| Go to MRP 1 view | Tabs in Additional Data can be filled in any sequence. |
MRP 1
| Main activities | Key points |
|---|---|
| MRP Type | Default PD |
| MRP Controller | Default P05 |
| Lot size | Default EX |
| Got to MRP 2 view |
MRP 2
| Main activities | Key points |
|---|---|
| Special procurement | Default 50 |
| Backflush | Default 2 |
| Sched. margin key | Default 000 |
| Go to MRP 3 view |
MRP 3
| Main activities | Key points |
|---|---|
| Period Indicator | Default M |
| Availability check | Default KP |
| Go to MRP 4 view |
MRP 4
| Main activities | Key points |
|---|---|
| Individual/coll. | Default 2 |
| When all data has been entered, save the material by pressing button and exit material creation |
Creation of ZERS - Industrial Supplies
Create the material by creation transaction:
| Main activities | Key points |
|---|---|
| Enter transaction MM01 | Full path: Logistics -> Materials Management -> Material Master -> Material -> Create |
| Enter Industry Sector | Always choose “Chemical Industry” |
| Enter Material Type | Always ZERS for Industrial Supplies |
| Copy from… Material | If applicable, make sure to edit the data that differentiates current material from the previous one |
| Press Enter |
Select Views to be created:
- Basic Data 1 (General data)
- Basic Data 2 (General data)
- Plant data views
- Purchasing
- Purchase Order Text
- MRP 1
- MRP 2
- MRP 3
- MRP 4
- General Plant Data Storage 1
- General Plant Data Storage 2
- Accounting 1
- Accounting 2
Select views to be created:
Basic data 1
| Main activities | Key points |
|---|---|
| Material Description | Check the request form for "SHORT DESCRIPTION" The description should be always in Upper case |
| Base Unit of Measure | Copy from template The base UOM should be the smallest unit possible. For example, if the material is requested by case, the base UOM should be each and the alternate UOM should be case. |
| Material Group | Copy from template |
| Division | Always WA |
| Go to Basic Data Text tab |
Basic data text
| Main activities | Key points |
|---|---|
| Basic data text | Material long description (copy from the form) - Must be in capital letters! Use button to add languages. Copy English text to all other languages: 12 mandatory languages are: If the long description is not provided copy the short description |
| Go to Descriptions tab | From Basic Data View Descriptions tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence. |
Descriptions
| Main activities | Key points |
|---|---|
Material descriptions in local languages | 12 mandatory languages are: |
| Go to Units of measure tab | From Basic Data View Units of Measure tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence. |
Units of measure
| Main activities | Key points |
|---|---|
| Enter Alternate Units of Measure conversions | Check the request form |
| Go to Purchasing tab |
If the base UOM is different from the Ordering UOM, there should be an Alternate Unit of Measure mentioned in the ZERS form. Additional conversions can be entered if requested.
Purchasing
| Main activities | Key points |
|---|---|
Purchasing Group | Check the request form |
| Automatic Purchase Order indicator | Always checked |
| Purchasing value key | Default 0004 |
| GR processing time | Default value at the time of material creation – 1 Plant data administrators will change the field value if necessary |
| Critical part | Check if material is marked as critical in the form |
| Go to Purchase Order Text tab |
Purchase Order Text
| Main activities | Key points |
|---|---|
| Purchase Order Text | (if nothing specific has been provided then copy from Basic Data Text) - Must be in capital letters! Use button to add languages. Copy English text to all other languages: 12 mandatory languages are: |
MRP 1
| Main activities | Key points |
|---|---|
MRP Type | Check the request form |
Reorder Point | |
MRP Controller | |
Lot Size | |
Maximum stock level | |
Rounding value | |
Go to MRP 2 tab |
MRP 2
| Main activities | Key points |
|---|---|
Production storage location | Check the request form |
Storage location for External Procurement | Check the request form |
Planned Delivery Time | Check the request form |
Scheduling Margin key | Default 000 |
Safety Stock | Check the request form |
Go to MRP 3 tab |
MRP 3
| Main activities | Key points |
|---|---|
Availability check | Check the request form If Stocked – 02 |
| Go to MRP 4 tab |
MRP 4
| Main activities |
|---|
No info is entered in MRP 4 tab. Nonetheless, the view has to be opened to ensure correct operation of the system. |
Go to Plant data / storage 1 tab |
Plant data / stor. 1
| Main activities | Key points |
|---|---|
| Unit of issue | This field is not populated upon creation If there is a request to update unit of issue, it needs to come via Sharepoints and the buyer's approval attached to the workflow. Purchasing, Inventory Management, and production needs to be involved as the Issue unit should be what is on BOMs. |
Storage Bin | Check the request form 10 Characters max. |
| Physical inventory indicator for cycle counting | Check the request form |
| Go to Plant data / storage 2 tab |
Plant data / stor. 2
| Main activities | Key points |
|---|---|
Profit Center | Check the request form |
| Go to Accounting 1 tab |
Accounting 1
| Main activities | Key points |
|---|---|
Valuation Class | Default Z120 |
| Price Control | Default V |
| Price Unit | Default 1000 |
| Moving price | Check the request form → Standard price x 1000 This a sensitive field, if the information populated is incorrect only few Controllers has access to change it. Make sure on the decimal notation symbol that was sent (comma or dot) |
| Go to Accounting 2 tab |
Accounting 2
| Main activities |
|---|
No info is entered in Accounting 2 tab, nonetheless, the view has to be activated to ensure correct operation of the system. |
| When all data has been entered, save the material by pressing button and exit material creation |
Accounting 2
Completing the material
| Main activities |
|---|
| The next step is to request the Purchase Info Record and Source List creation. |
| Add the newly created material number/s and PIR/Source List information in Helix. |
Creation of ZPRC - Commercial Products
It is in Data Management scope to create ZPRC records for Raw Materials when requested comes from HazCom Team. When ZPRC record is completed in SAP WP2, systems are being synchronized overnight and PRCO code appears on HazCom side.
To complete this request material chemical name should be verified and provided by HazCom Team.
Use MM01 transaction and populate:
Main activities | Key points |
|---|---|
| Industry Sector | Always choose "Chemical Industry" |
| Material Type | ZPRC |
| Copy from… Material | Option to copy data from an existing material can be useful in some cases, e.g. if you need to create multiple similar materials |
| Hit Enter |
Select Views to be created:
- Basic Data 1 (General data)
- Basic Data 2 (General data)
- Classification (General data)
- Label data (General data view)
Basic data 1
| Main activities | Key points |
|---|---|
| Material Description | Material name in standard languages provided by Hazcom The description should be always in Upper case |
| Base Unit of Measure | Default KG |
| Material Group | Default 0451 |
| Old Material number | MSDS reference provided by requester |
| Lab/Office | Default Z20 |
| Go to Basic Data Text tab | Maintained in standard languages when description does not fit in short text field |
Basic data text
| Main activities | Key points |
|---|---|
| Basic data text | Use button to add languages. Copy English text to all other languages: 12 mandatory languages are: Maintained in standard languages when description does not fit in short text field. |
| Go to Classification view |
Classification
| Main activities | Key points |
|---|---|
| Class Type | 001 Material Class |
| Class | Default LIP0034040 |
| Go to label view | No data maintained |
| Save the material | |
After the ZPRC creation also create the ZUNB |
All changes to ZPRC's for Manufactured Materials should come from Plinio Morgonni. Changes to ZPRC should NOT come through SharePoint.
Creation of ZUNB - Stocked and non-valuated materials
Use MM01 transaction to create material
Main activities | Key points |
|---|---|
| Industry Sector | Always choose "Chemical Industry" |
| Material Type | Select the material type indicated in the request form |
| Copy from… Material | Option to copy data from an existing material (2037990). |
| Hit Enter |
Select Views to be created:
- Basic Data 1 (General data)
- Basic Data 2 (General data)
- Puchasing (Plant data)
- Quality Management - *Only for Material Group 0451
- Label data (Genera data)
- Fill in Organizational Levels
Extend to the following plants:
7265 ZZZZ ex 3969 / Négoce DE
7266 ZZZZ ex 3969 / Négoce GB
8269 ZZZZ ex ZUS4 / Trading USA
8577 ZZZZ ex 7776 / Trading CN
Basic data 1
| Main activities | Key points |
|---|---|
| Material Description | Copy from the ZPRC The description should be always in Upper case |
| Base Unit of Measure | Copy from the ZPRC |
| Material Group | Copy from the ZPRC |
| Old Material number | Copy from the ZPRC |
| Go to Additional Data tab |
Basic data text
| Main activities | Key points |
|---|---|
| Material descriptions in local languages | 12 mandatory languages are: |
| Go to Units of measure view | From Basic Data View Units of Measure tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence. |
Units of measure
| Main activities | Key points |
|---|---|
| Enter Alternate Units of Measure conversions | Fixed conversions: 1 BJ <-> 1 KG 1 DR <-> 1 KG 1 PL <-> 1 KG |
| Go to Basic data 2 view |
Basic data 2
| Main activities | Key points |
|---|---|
| Basic material | Check the Freshdesk Ticket |
| Go to Purchasing view |
Purchasing
| Main activities |
|---|
| No data has to be maintained in Purchasing view, however the view has to be created |
| Go to Quality view |
Quality Management
NOTE! Create this view when Material Group is 0451
| Main activities | Key points |
|---|---|
Inspection interval | Copy from the material form
|
| QM proc. active | Always flagged |
| QM Control Key | European plants - default REACH
|
| Go to Label view |
Label
| Main activities | Key Points |
|---|---|
| Primary Packaging Unit (PPU) | Default DR - Drum |
| Select the primary packaging unit of measurement | |
| Press the indicated button to "Import" labeling specifications for selected packaging. | Templates for Label data: All available on Material 2028246 |
Label
| Main activities | Key Points |
|---|---|
| Enter the Material #2028246 | |
Press | |
| Leave all the material types selected | |
Press | |
When all data has been entered, save the material by pressing button and exit material creation | |
Note! Remember to perform the extension for all the four plants: 7265 ZZZZ ex 3969 / Négoce DE |
Overflow process
It is an additional extension with 0A (intercompany) distribution channel to Overflow warehouses for material storage purposes in case the original warehouse for the plant is full.
Applicable to the following plants, but might be requested as additional extension by some other plants and also specified in the Distr Center field in the request form (example: Heanor can request additional extension to 8818).
Those to be setup only when additional Overflow Extension request received after the completion of the main request by all the teams. However, for plants 8368-7180 Havre de Grace and 8370-7180 Winona, the overflow extension to 8818-7180 First Choice Vineland is a must.
And done as a copy of the Manufacturing plant extension, process below.
- 8364 - 7180 Anaheim
- 8367 - 7180 Piedmont
- 8368 - 7180 Havre de Grace (overflow extension to 8818 - 7180 First Choice Vineland is a must)
- 8370 - 7180 Winona (overflow extension to 8818 - 7180 First Choice Vineland is a must)
- 8350 - 7771 Wrexham
- 8400 - 7771 Heanor (note: it is not possible to share 8802 K&N extension between 8400 Heanor and 8350 Wrexham, since setup is different)
Reference the Overflow document to check the fields to be changed based on the plant.
Source lists should always be requested to create from the plants to Overflow (example from 8368 to 8818), and additional PIR's will be specified in the request.
Extend the material by creation transaction:
| Main activities | Key points |
|---|---|
| Material | Material number to be extended for overflow warehouse |
| Industry Sector | Always choose "Chemical Industry" |
| Material Type | |
| Copy from… Material | Material number to be extended for overflow warehouse |
Select views to be created:
Fill in organizational levels:
| Main activities | Tips / Best practises | Key points |
|---|---|---|
Plant | As per plant | |
Storage location | As per plant | |
| Sales organization | As per plant | |
| Distribution channel | As per plant | |
| Warehouse no. | As per plant |
No changes on the views, just pass through and open the material for Sales: Sales org. 1, Sales: Sales org. 2.
Press enter and Go to Sales: general/plant view
Sales: general/plant
Purchasing
| Main activities | Key points |
|---|---|
| Purchasing Group | As per file |
| Source List | Always checked |
| Pass through and go to MRP1 | No changes on the view |
| Go to MRP2 view |
MRP2
| Main activities | Key points |
|---|---|
| Procurement type | As per file |
| Special Procurement | As per file |
| Prod. Storage location | Blank |
| Storage location for EP | According to the plant you are extending to, As per file |
| In-house production | Cleared |
| Planned deliv. time | Default to 1 |
Just pass through and open the material for MRP 2 and MRP 3 | No changes on the view |
| Go to plant stor. 1 |
Plant Storage Data 1
| Main activities | Key points |
|---|---|
| CC phys inv. ind | Blank |
Just pass through and open the material for Plant data/stor.2 , Warehouse 1 and 2, Quality man., Accounting and Costing.
For the second overflow plant we can copy from the just created extension.
There is no need for SalesOrg and Warehouse views.
Now go through all the views without making any changes,except for MRP2, where Storage loc. For EP should be changed to correspondent plant:
Once you are all through other views without changes, save the material.
After the material is saved, create a request to the PSL Team to make necessary Source lists for:
- Shipments from the Main plant to the Overflow plant
- Shipments from the Overflow plant back to the Main plant
Material extension
Composite Material extension requests to new plant or sales org should come through Sharepoint.
Extension requests to China sales org/dc’s can be accepted from Catherine Lu - via Service One:
- CN41 Composite Materials (7776)
- CN36 Composite Materials (7734)
- US37 Composite Matls (CN) (7180)** not included in governance
- Any other sales org requests - reach out to Plinio Morgonni for clarification - all other sales orgs should be requested by other people through SharePoint MDM
To process Catherine Lu's requests:
- Product Manager approval is necessary for all materials not manufactured in China plants:
- To determine if a material is manufactured in a China plant, look at the plants Procurement type found in view MRP2
- If the material is manufactured in China, the procurement type will be set as ''E''
- If the Procurement type is not set as E, then the material is not manufactured in China and the Product Line Managers approval is needed to proceed
- All requests for material extensions to a China plant should be routed through Plinio Morgonni and a SharePoint request will be created.
| Main activities | Tips/Best practices | |
|---|---|---|
| Enter transaction MM01 | Full path: Logistics -> Materials Management -> Material master -> Material -> Create (General) T-code can be entered directly in Command field. T-code can be saved in Favorites | |
Select Material, Industry Sector, Material Type | Material is the material number that needs to be extended Industry Sector always C Chemical Industry Material Type the same as the material that is being extended Copy from… option can be used, preferably to copy from an existing view of the same material | |
| Select the necessary views for the extension | For sales org extension select sales organization views for all applicable material types Sales Organization views:
For plant extension select plant views according to the specific material type To determine which plant view needs to be opened, please see material creation section for each matrial type Plant views:
| |
| Select Organizational levels | To determine which organizational levels need to be selected, please see material form and material creation section for each matrial type | |
| Save the changes performed | If the plant has other available sales orgs in file, please extend to those as well Note! Don't forget to extend the material to the new plant's storage locations and warehouse according to material type |
For Plant extensions, in case Freight group is missing:
- Extend the material to the requested plant and as the Freight group, temporarily put the dummy material freight group: ZZZZZ
- Complete the task in Sharepoint
Material modification
Manual material modification
Composite Material change requests can come through Sharepoint or Freshdesk.
Please see file to check which should be used for the particular change request - Sharepoint or Freshdesk.
In this file you can also find whether you have to get an approval for the change, as well as the correlated fields.
| Main activities | Tips/Best practices |
|---|---|
| Enter transaction MM02 | Full path: Logistics -> Materials Management -> Material master -> Material -> Change T-code can be entered directly in Command field. T-code can be saved in Favorites |
| Select the view containing the field that needs modification | |
| Select the Organizational Level for which the modification is requested | |
| Make the requsted update | Repeat the modification for all Sales Areas or Plants if applicable |
| Save the changes performed |
Material mass modification
Material master mass modification is performed when a change of a value in the same field(s) for a list of materials needs to be carried out.
Requester should submit a Freskdesk ticket with an attached file indicating the necessary changes.
Note! Mass update requests for all material master information require approval from the CM EDA (Plinio Morgonni) before updates are made. Data Governance Lead should be informed.
Note! Mass update requests for MRP 1-4 view information require Plinio Morgonni's approval and an additional approval from Laura Dowling before updates are made.
| Main activities | Tips/Best practices | |
|---|---|---|
| Enter transaction MM17 | Full path: Logistics -> Materials Management -> Material master -> Material T-code can be entered directly in Command field. T-code can be saved in Favorites | |
| Select the Table(s) containing the field(s) that need to be modified | ||
| Go to Fields tab | ||
| Select the Field(s) that need to be modified | Use search option to easily find the field to be changed. Use technical name of the field in search. You can find out technical name of the field pressing F1 when field is selected and pressing Technical Information button | |
Press Execute button | ||
| Limit selection as much as possible to perform the change only for the materials that need it | Use additional options on the bottom of selection screen to amend selection options or add/remove selection fields if necessary Press Execute button | |
Press Execute button | ||
| Enter new value | New value(s) has to be entered in the designated space above list of materials It is possible to deselect records that do not require change Press 'Perform mass change' button to copy the value to selected materials Press 'Test changes' button to make system check the changes without saving them | |
| Check log of changes performed in Test mode | Green light indicates successful change Yellow light indicates a warning Red light indicates data change is not possible/allowed | |
| Save the changes performed | Check log of changes performed | |
| Mass change of data can be performed also by importing data from file or clipboard |
Mass changes performed using MM17 is not triggering data transfer to WPX. To solve this issue we have two options.
- Use other tools like LSMW, Process Runner or other programs to perform mass changes
- Use MM17 as usual, but once the changes are made, manually push the material codes to WPX using the BD10 transaction.
Message type to be used is ZWXMATMAS
Logical system is WPXCLNT400
Appendix – List of approved requestors
Composite Materials Master Data Governance Who's Who - link where you can find the appropriate person for specific roles per site.
Appendix – Solstice Aero Material Master Views and Fields
Link to Solstice Aero Material Master Views and Fields
Appendix – DG indicator updates
Requests can be received from:
- Barbara Platt - Barbara.platt@syensqo.com
- Courtney Michael - courtney.michael@syensqo.com
Check for other materials with the same ZPRC and put the same DG indicator to the newly created material. Then add it in the file for them to verify it is ok or if the ZPRC is new and no other material is available for reference.
Once the DG has been updated, check if the transportation group matches with the DG indicator. If it does not match, update the transportation group according to the DG indicator and add Plinio Morgonni in copy of your reply.
Please see example below where the transp. group must be changed due to the DG indicator update:
- DG Indicator is GPP (hazard)
- Transportation group 0001 - Packed
Note! Transportation label should not be maintained, since this information is stored by the plant
Appendix – SharePoint Workflow Management Tool
Link to the presentation. Please check presentation for detailed information on the tool.
Appendix – List of approvers ZERS - Link
| ZERS (Materials with Division WA) creation/modification/deletion | |||||
|---|---|---|---|---|---|
| Plant | Buyer | ||||
| 8367 | 7180 Piedmont | US | Stephen Johnson | ||
| 8456 | 7180 Kalamazoo | US | |||
8785 | 7180 Rock Hill | US | |||
8350 | 7771 Wrexham | GB | Philippa Capstick | ||
8400 | 7771 Heanor | GB | |||
| 8361 | 7180 Orange | US | Michael Enes | ||
| 8363 | 7180 Anaheim D'Aircraft | US | |||
| 8364 | 7180 Anaheim | US | |||
| 8365 | 7180 Greenville, TX | US | Keith Price | ||
| 8368 | 7180 Havre De Grace | US | |||
| 8370 | 7180 Winona | US | Daniel Corcoran | ||
| 8347 | 7772 Oestringen | DE | Dominic Grad | ||
Appendix – Material Inactivation
Requests via Service One ticket from Quality Manager or Data Governance Lead, request approval from Product Line Manager by material division and put Plinio Morgonni in CC.
Before inactivation material should be checked for open items under "Stock overview"
If there are no open activities, Stock will show only "0". If any other values displayed, appropriate Product Manager should be contacted for Stock removal.
| Level | Inactivation |
|---|---|
| Global | After Stock is cleared material can be inactivated.
|
| Local | Note! For local inactivation the plant might request the value to be populated in SAP, proceed with the inactivation with the values provided in the ticket If material has to be inactivated for specific sales areas
If material has to be inactivated for specific plants
|
Note! ZPRC (Material group 0450) inactivation needs to be performed by Plinio Morgonni (Composite Materials) after all the ZMATs are inactivated.