Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Excerpt
hiddentrue

Page_title

Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1
Process: Product Costing
Panel
bgColor#f2f2f2
borderWidth1

Responsibility area: Monitor the consistency of the monthly cost calculation

The analysis must be performed by the FRA every month between D-5 and D-2 12pm

Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1
Scope

Image Modified Image Modified
Frequency

Image Modified  
References

Expand
titleSAP Transactions

Content by Label
showLabelsfalse
max30
spacesSAPCost
showSpacefalse
sorttitle
operatorAND
cqllabel = "op_023" and space = "SAPCostCostProc"
labelsmaintain_assessment_cycles

Expand
titleCosting rules

Content by Label
showLabelsfalse
max30
spacesSAPCost
showSpacefalse
sorttitle
operatorAND
cqllabel = "op_023" and space = "CostFAQCostProc"
labelsmaintain_assessment_cycles

Attachments

N/A

Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1

OP.021  <<

Page_title
>> OP.025



Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1

  Guideline  

Expand
titleI am informed that the CK40N was run

I am informed that the CK40N was run and I can perform the analysis

Expand
titleI download the analysis report
 
Include Page
CK40N - Costing run analysis
CK40N - Costing run analysis
Expand
titleI request corrective actions

 I request corrective actions when necessary

Expand
titleI validate the result of the calculation
 I validate the result of the calculation by D-2 12pm
Expand
titleI fill the check list

The check list must be performed in the frame of the control IAC 01.02 

Include Page
IAC 01.02 - CK40N Check list
IAC 01.02 - CK40N Check list

Viewtracker
hidetrue