General Description |
|---|
The Key Closing Steps reported represent key intermediate Steps in the monthly closing. They are split by range of time (= status) : Early or On Time, Late and Not Available
BFC Upload: This is when the uploaded from SAP First loading of data and before any manual intervention. This KPI tracks and reports on the number of differences, between the ERP (PF1 or WP1)into BFCBOIC Upload: This is when BOIC is uploaded from SAP (PF1 or WP1) BOIC Freeze: BOIC is frozen for the company* Close Product Costing + ML: This is the closing of product costing and material ledger in PF1. Cost Estimate in WP1. Depreciation Run: This is running the monthly depreciation posting in SAP Prelim P&L: This is when preliminary P&L check done and available for Front Office and Controlling to start their review of the results Final Cycle Run: This is when the final assessment/allocation cycles are completed successfully for the month. It is only the final run; if the cycles have been ran and reversed only the last rerun is the actual completion to compare to target completion time MM/AP Closing (MMRV): This is closing of A/P in SAP. No further Goods Receipts against POs are done after closing AP Cycles Test Run: This is the monthly test run of cycles to identify any issues ahead of the closing BFC Package Balance, Pretax: This when the BFC package has been completed, all blocking controls solved and it is in balance, but before the tax entry is posted in SAP and BFC Closing steps based on FtO Time: Tax Posting: This is when the tax posting is completed by the Front Office BFC Publication: This is the D4 Compliance for submitting the monthly BFC package |
On Time or Early
Status if the closing step was performed within 15 minutes of the target time in the global calendar
Late
Status if the closing step was performed more than 15 minutes after the target time in the global calendar
Not Avalaible
In most cases, not available means that the closing step is not following the standard process and performed inside Schedule Manager. In some instances, this status means we are waiting some development before it will be available. In these cases, there will be comments provided
and BFC , and number of L.E. which have no differences vs. all L.E. reported. Number of differences are reported in total and by Balance Sheet and P&L. At this time, this KPI is only available for companies which are managed inside one of the back offices.
|
Sources |
|
|---|---|
QV source | Manual File(from Primary Schedule Manager - SAP with the exception of BOIC Freeze which is from a BOIC report and BFC Package Balanced from a Salesforce Report)- Prepare by BO as part of closing function. Underlying data coming from ERP (PF1 & WP1) and BFC |
Refresh frequency | Monthly (16th of each month) |
Specific Dimensions |
|---|
|
Scope |
|---|
|