| Excerpt | ||
|---|---|---|
| ||
|
| Panel | ||||||
|---|---|---|---|---|---|---|
| ||||||
Guideline |
...
| Excerpt | ||
|---|---|---|
| ||
|
| Panel | ||||||||
|---|---|---|---|---|---|---|---|---|
| ||||||||
RiskNet realization value inventory reserve does not comply with group rules ObjectiveGCCO updates every year slow turn inventory reserve calculation procedure for his/her perimeter
Process descriptionInventories shall be measured at the lower of cost and net realizable value.
Control descriptionSBS Syensqo GBS is preparing and sending the report with the Inventory reserves to the FRA and/or GCCO for analysis and validation |
| Panel | ||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||
Scope:WP1WP2 &PF1PF2FrequencyQuarterly basis (Last working day of March, June, September, December) Control ownerReferences
Control evidences
|
| Panel | ||||||
|---|---|---|---|---|---|---|
| ||||||
Guideline |
...