Tasks to be completed when documenting an operation (from creation to publication)

 1. Enter the Title of the operation / page

2. Add the following Labels

    • Scope of applicability: ww, country_accounting 

    • Country or group of countries (if applicable): belux, china, france, italy, lam, nam, uk_ie, bulgaria, dach, netherlands, iberia, poland, latvia, australia, india, japan, south_korea, thailand, singapore, new_zealand, emea_transversal, apac_transversal

Unit and Domain according to the List of labels to be used in the Finance Service Line space

E.g. 1: WW Operation in Financial Accounting under domain "Central Finance Processes & Compliance":
Labels to be used: ww, financial_accounting, central_fin_proc_compliance
  • E.g. 2: France Operation in Financial Accounting:
    • Labels to be used: country_accounting, france, financial_accounting
      (for country operations, the Domain is always country_accounting)
  • 3. Fill in all fields as described above

    4. Name the title of each section using OPD methodology naming convention - Infinitive verb without the “to”, mainly action verb...something) - " I do something..."

    5. Once the description of the operation is completed, ensure it is approved and published by launching the SBS-Finance approval workflow 

    Panel
    bgColor#F7F7F7
    titleColor#ffffff
    borderWidth1
    borderStylenone
    Domain: Finance Data & Reporting SU Management Accounting
    Panel
    bgColor#F7F7F7
    borderWidth1
    borderStylenone

    Responsibility area: Maintain Costing Master Data

    Table of contents 

    Table of Contents
    maxLevel2


    Panel
    borderStylenone
    Scope

    Image RemovedImage Added
    ERP

    Image ModifiedImage ModifiedImage Removed

    Image RemovedImage Removed

    (to be confirmed!)(error)

    Frequency

     Image RemovedImage Removed Image Removed Image Removed

     Image Removed Image Removed Image Removed


     (to be filled)(error)Image Added

    References

    KA06
    - Create a secondary cost element

    Cost element - Master Data(to be confirmed!)(error)

    Forms

    Attachments

    Cost element - Master Data


    I receive a request to create a secondary cost element <<  >> 
    Page_title
    >> I update a secondary maintain cost element hierarchies

    1. Objective and Scope

    1.1. Objective of this Operation

    1.2. Scope

    2. Definitions

    See Finance Glossary:

    • ...

    3. Tasks description

    WHAT and HOW - Main content of the operation

    The content should be mainly organized in 2 levels of Headings to ensure a proper link with the Table of Contents.

    A secondary cost element represents postings that occur between controlling objects within CO and from CO to COPA. A secondary cost element is essentially an account that exists only in the CO module, not in FI. When costs are moved (e.g., from one cost center to another using an assessment, or from a cost center to a production order), no postings are made in FI. 

    The secondary cost element category is 21, 42 or 43

    The codification of a secondary cost element depends on the system: 

    • In PF2 = 98xxxxxxxx
    • In WP2 = 99xxxxxx

    The creation of new secondary cost elements should be done in very limited cases. Usually it is done in the frame of a project when a new process is set-up and requires the creation of a new cost element. 


    Note
    titleException

    Certain secondary cost elements are designated for Lump Sum invoicing, each with a specific coding structure.

    The codification depends on the system and it is related to a specific range:

    • In PF2: 9200000000 until 9200009999
    • In WP2:  if cost element category is 42 (which is most of the times) the range should be 99422700 until 99422999; if cost element category is 43 the range should be 99432700 until 99432999


    The best way to check the last secondary cost element created is to go to Tcode KA03 >> search in tab "N: Cost element" by 99422* or 99432* in WP2 (or 92* in PF2).

    Image Added

    Check the last number between the specific range.


    Requests related to this should be initiated by the Intercompany Team.


    For more information about this process, please refer to the following link:
    Optimic Project and OPTIMIC Master data requirement


    1.2. Scope

    In PF2 (Controlling Area: CHEF) & WP2 (Controlling Areas: Z006, Z013, Z025, Z026 and Z028)

    2. Definitions

    See Finance - Glossary

    3. Tasks description

     Select the level of heading in the "Paragraph" option.

    3.1. I

    record

    create the secondary cost element

    3.1.1. Step 1 of Task 1

    3.1.2. Step 2 of Task 1

    ...

    Include Page
    KA06 - Create a secondary cost element
    KA06 - Create a secondary cost element


    Note

    As a best practice, in WP2 each secondary cost element should be replicated in the 5 controlling areas (Z006, Z013, Z025, Z026 and Z028).


    Warning

    Once the new cost element is created it must be included in all core cost elements groups (XCS-ALL & ZSOLV). 

    In WP2, the new secondary cost elements only need to be included in ONE controlling area (the other controlling areas will be automatically updated).

    I maintain cost element hierarchies

    3.2. I check the set of accounts where the cost element should be included

    Most of the secondary cost elements are created as reference from another already existing in the system.

    Therefore, we should check the sets of accounts where the secondary cost element used as reference, is included.


    Go to tcode GS03 and then select "Utilities" >>> "Find values in sets"

    Image Added


    Select variant "DATA TEAM" and insert the secondary cost element.

    After execute.

    You should compare the output report of the reference secondary cot element with the one that we have created.


    In WP2 :                                                                                                            

    Image Added                    Image Added


    In PF2 :

    Image Added                 Image Added



     3.3. I

    3.2. I

    communicate that a new secondary cost element has been created

    3.2.1. Step 1 of Task 2

    3.2.2. Step 2 of Task 2

    End of document

    I notify the requester.