Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Changed text PF1 to PF2.

Table of Contents

Table of Contents
maxLevel2
minLevel1

Scope


ERP


 

References


Attachments


1. INTRODUCTION

1.1. Objectives and scope of this procedure


Excerpt

This OP explains how to create a purchased material for Chemicals and Plastics sectors in ERP PF1PF2/050 and PF1PF2/020 , for the following material type:

  • Z707 – Chemicals Intermed.


2. STANDARD OPERATING PROCEDURE DESCRIPTION

2.1. Definition

A physical product, present in the manufacturing process or a non-physical product, commonly used in Bom nomenclature and in the production planning.

Should not be bought or sold and common to all divisions (WITHOUT industrial origin)

2.2. Codification

Automatic Numbering

Z707

Chemicals Intermed.

10000

59999

Transaction MM01 – Select views

Basic

Classification

Sales

Purchasing *

*Purchasing views are settled on the 20 directly by users


X




Intermediates, Chemicals and Plastics

X

X



Intermediates, chemicals and plastics GBUs using the APO Module



Important Data

Short Text- SKTEXT-MAKTX

Product Name + « @INT ».

Material Group - MARA-MATKL

ZVENTES

Authorization Group - MARA-BEGRU

INTE – Chemicals and plastics

Weight - MARA

Gross and Net Weight - 1

  • If product is dangerous, in BASIC DATA 2, you should complete the level (DG indicator profile)

Management of Alter. Units of Measure

As per a finish product add the 3 alternative units of measure as above

View "Classification" for materials using APO SBUs

« 001 »

Class Category

« ZR_PROD_APO »

  • If APO is not used by GBU »» Classification view is not setup

Transport Material to PF1PF2


ALE MODEL

Z_TRA_FOCUS


Note: When a material is extended to a new plant, its GTS classification should be reviewed. Check link below for more information.

Widget Connector
urlhttps://docs.google.com/presentation/d/1bPHEF2atMMloqiI8ttyeWR9tmXpyMqieN6LvJgNc34o/edit?usp=sharing