Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

id1338774627

...

width70%
id1338774629

...

id215034999

Table of contents

Table of Contents
maxLevel2

...

...

id1338774631

Objective of this procedure

The purpose of this document is to describe the Credit / Debit and Returns releases in WP1 and PF1 by the SBS OtC service center in Curitiba

Scope

The OtC Service Center is in charge of controlling and releasing in WP1: 

  • document types :
    • related to Rebates : B1, B3, B4 
    • related to Credit : G2, ZG2, KR
    • related to Debits : L2, ZL2
    • related to Returns : RE, KR, KA
  • Billing blocks 08, 09 and 14
  • For Novecare NAM (Sales org US05 and CA02) / Technology Solution (Ex Novecare NAM US21 and CA11)/ Special Chem (Sales or US01 and CA10) Legal Entity 7424 and 7651.

The OtC Service Center is in charge of controlling and releasing in PF1:

  • document types :
    • related to Credit : CRV, CRVA, CRVT, CR, ZCRB, RK, ZCDP
    • related to Debits : DRV, DRVA, DRVT, ZDRB, DR
    • related to Returns : REA, ZREB, ZREN, ZROB
  • Billing blocks 08, AA
  • For Special Chem NAM (Sales org 3384) / Legal Entity 3384. 

...

Scope

...


Image Added

...

ERP

...


Image Added Image Added

...

References

...


Attachments

...

id1338774632

Scope

Image RemovedImage Removed

Frequency

...

References

 

Expand
titleSAP Transactions

Content by Label
showLabelsfalse
max30
spacesSAPCost
showSpacefalse
sorttitle
operatorAND
cqllabel = "op_xxx" and space = currentSpace()
labelsmaintain_assessment_cycles

Expand
titlePolicies

Content by Label
showLabelsfalse
max30
spacesSAPCost
showSpacefalse
sorttitle
operatorAND
cqllabel = "sbs-op-dotc-01-001" and space = "CostFAQ"
labelsmaintain_assessment_cycles

Attachments

 

...

id1339167079

...

width100%
id1339167080

...

id1339167081

Daily internal controls

Disputes in “Open” and “In Progress” with no modifications for more than 10 days

In order to know how to extract the data required for this control, open file “Follow-up Sales CCS  “stored in drive L

Image Removed

Open transaction UDM_DISPUTE (PI1) and search for variant “/DISPUTE FOLLOW UP

Image Removed

...

Note

For each dispute check the notes tab to see if any actions were taken and change the status to “Call by Collector” in order for the correspondent Collector to handle it immediately.

Image Removed

 

 

Disputes with External Reference not filled-in with region

 

To perform this control open also the file “Follow-up Sales-CCS“stored in drive L. 

Open transaction UDM_DISPUTE (PI1) and extract a report using the following filters: 

Case Type – Z00A

Status – 10, 21 and 23

Reason – Exclude A999 (Other reasons – as this is usually created by CM)

Escalation reason – Select Z4 (Region EMEA BO)

External refer. – Exclude:

*BENELUX*

*EXPORT*

*FRANCE*

*IBERIA*

*ITALY*

*DACH-F*

*DACH-P*

*UK*

Created By – PT*

Created On – Date of the control 

For each dispute check if the “External refer.” Field is filled-in with the correct region and update it if necessary.

 

Salesforce cases with no modifications for more than 48H

To perform this control the following Salesforce report must be executed: “Cases with no modifications > 48 hours” 

The results must be included in the communication sent afterwards in order to be assigned to the users by the Team Leader and to be handled with priority.

 

Weekly internal controls

Disputes with incorrect status

Each Monday it is necessary to check if there is any dispute modified in the previous week with an incorrect status.  To perform this control open also the file “Follow-up Sales-CCS“stored in drive L.

Open transaction UDM_DISPUTE (PI1) and search for variant “/DISPUTE FOLLOW UP CONTROLS”

Image Removed

...

 

For each dispute check if the current status is appropriated and change it accordingly: 

  • To “To be Collected”: if issue is solved
  • To “Call by Collector”: if any action is required from the Collector
  • To “To be Cleared”: if any action is required from Accounts Receivable Team

Image Removed


Definition

2 different processes to correct an invoice:

 1. Some customers only want to be debited or credited for the “difference” on the original invoice.  

  • In this case Customer Service calculates what the customer is owed or what balance needs to be billed. Creates only a debit or Credit for that amount.

 2. Some customers require a “clean invoice” (most common case)

  • Completely Credit the original invoice and correctly Debit entire invoice.

The validation email should detail which case it is. 


For WP1, ZI partner is the CSR managing the document. He/she can be retrieved in the Header partners ( can be via transaction VA03 or V23): 

Image Added

 

Image Added


In PF1, the CSR can be retrieved the same way, but under partner VW : 

Image Added


A credit / debit memo Request, and a Return, when released from billing block, will generate a Credit / debit Note or a Credit for Return that will actually trigger the payment to the customer.

This information can be found in the Document flow. Once the Credit / debit memo Request or the return has been released from Billing block, the Credit memo, Debit Memo or Credit for Returns document will show in the document flow. 

Image Added

 

Image Added


Example of a return : 

Image Added

 

 

Procedure

 

When Post invoicing documents are created by Customer Service, a Billing block is automatically populated. Customer service Rep doesn’t have the authorizations to remove this billing block.

Image Added

Customer service Rep is responsible to:

  • Obtain the required validation(s) in the GBU according to their dedicated Matrix of Validation related to post-invoicing
  • Ensure that the customer, the material, the quantity, and the value are correct
  • Ensure that the Taxes are correctly applied (Header text: The CSR will enter a text in the “Internal note” text taxes have been impacted)
  • Check that there is no duplicate in the document flow

SBS Service Center in Curitiba is responsible to check:

  • That the doc was created in reference to an invoice (if only 1 invoice was at stake. If against multiple invoices (ie created without reference), need to list all invoices # in internal header texts)
  • No duplicate in the document flow
  • That the validation has been attached in the Credit /debit memo (mandatory)
  • That the validator is the right person according to the BU Matrix of validation (valid one year)
  • That the customer, the material, the quantity, and the value are correct according to the validation email attached / text entered by the CSR.

Example

For example, if the validation email says that we are issuing a Credit for Sartomer (1), for material 46083 (2) for 34 200lb (3) for 147060 USD (4), this check is OK.

  • that the Taxes are correctly applied (Header text: Internal note should mention if taxes have been impacted)
  • for returns : That the plant has received the product back using 651 and 4xx transaction so we don't have FI-CO differences, and that it is the same quantity as the credit memo (see details below).

Image Added

 

1. Monitor Blocked Documents  

1.1. Frequency

Once a day or more often (3 times at least: morning, lunch time and 5pm Eastern time) during closing period (last days / first days). SBS OtC Service center will receive an email from Jean O’Brien that also could be a trigger to identify blocked documents and release then.

 

1.2. Through transactions V23 / ZV23 in WP1

Run V23 or ZV23 in WP1

With selection criteria:

  • Sales org US05 / CA02 / US21 / CA11 / US01 / CA10
  • Header Billing block: 08, 09, 14
  • Entered on: from: Jan 1st 2016(or current year) until today's date
  • ALL SD Document
  • SD document category: H, K, L

Or use variants in V23: 

Image Added

Image Added

A list of documents to be released is displayed. 

Image Added

Enter the Credit / debit / return request document by clicking on the document number in SD Doc column

To do sort by “Delivery status” and -> to define priorities:

First: fully delivered, not relev for deliver, and

***not delivered in case of returns (in “stand by” until confirmation is delivered)

 

 

1.3. Through transactions V23 / ZV23 in PF1

 

Run V23 or ZV23 in PF1

With selection criteria:

  • Sales org 3384
  • Entered on: from: Jan 1st 2016(or current year) until today's date
  • ALL SD Document
  • SD document category: H, K, L 

Image Added

A list of documents to be released is displayed. 

Image Added

Enter the Credit / debit / return request document by clicking on the document number in SD Doc column

To do sort by “Delivery status” and -> to define priorities:

First: fully delivered, not relev for deliver, and

***not delivered in case of returns (in “stand by” until confirmation is delivered)

 

2. Control the documents  

Proceed to the controls to check the accuracy of Document and Validations


Status
colourBlue
titlestep 1

Start with Credit and Debit Memos (sales document type)  

 

 

 


Status
colourBlue
titlestep 2

Note the net value of the document

Image Added

 

 


Status
colourBlue
titlestep 3

Check the header texts 

Image Added

 

 


Status
colourBlue
titlestep 4

And check the attachment list 

Image Added

 

Image Added

 

 


Status
colourBlue
titlestep 5

Check that the validation has been attached or copied in the header texts

(form header or mention on invoice header texts) in the Credit /debit memo 

Image Added

 

 


Status
colourBlue
titlestep 6

Check in the approval matrix if the approver is an authorized person

Validation Matrix is valid 1 year maximum. 

 

Novecare

See below an example of the validation matrix for Novecare NAM as of Q1 2016.

For Documents with Net value > 11M$, the GBU President, E. Bustraen must validate the document.

For documents with Net value below 110K$ but above 33K$, the Regional Market Director of that Market must validate. For Distribution Channel 16 (HPC – Personal care), the validation email must come from S. Renac.

Image Added

The Market can be determined in the WP1 document by checking the Distribution Channel in the Sales Tab.

Image Added

Or if the validator is a Sales Rep, you can check it in the Sales Tab of the Header : Sales Group : if the Sales Rep found in the Sales group is the one validating the post invoicing document, the check is successful.

Image Added

 

 

Special Chem

See below an example of the validation matrix for Special Chem NAM as of Q3 2016. 

For Documents with Net value >1M EUR = 1.1 M USD, the GBU President/GBU Finance Director and GBU Commercial Director must validate the document. 

For documents with Net Value between 100-500 k EUR = 110 - 550 k USD the BU Commercial Manager must validate and above <100 k EUR = 110 k USD Commercial Manager must validate

Image Added

 

 


Status
colourBlue
titlestep 7

Check that the SAP Net value and currency matches the request received

Net value in the WP1 header document must be the same as the value in the validation email


Image Added

 

 


Status
colourBlue
titlestep 8

Check that the doc was created in reference to an invoice 

This is mandatory if only 1 invoice was at stake. It can be verified in the document flow. 

Image Added

Select the sales order and Display Document 

Image Added

 

Image Added

Then select Document flow again from the Sales order

 

 

For Example, BO could question if one Sales order was already subject to a Return, and then, an additional Credit memo was issued.

 

For example, in this document flow, we see both a return and a Credit memo

 

 

Image Added

If the doc was created against multiple invoices (ie created without reference), need to list all invoices # in internal header text or Mention on invoice header texts

Image Added

 

 

Note

Customer service is responsible

  • for the accuracy of the customer, material, quantity and value but BO can question if the value doesn't make sense (few dollars, negative value...)
  • to check that the Taxes are correctly applied (extremely rare) but BO can question if it doesn’t match the information in the Header Text Internal Note (Header text: Internal note should mention if taxes have been impacted) 

Status
colourBlue
titlestep 9

Check the returns  

Returns should not stay in the report for longer than a month. If creation date is more than a month ago, contact CSR (ZI / VW partner) with a screen shot of the report sorted by date with the one older than a month , copy the supervisors, asking if the return has been returned already or when it will be check attachment or text for validation. 

If status in report is Not Delivered, ignore. The document is not ready to be released.

If return Net value = 0, document can be released without any further check.

Image Added

Status for Returns : 

Image Added

Warning

Attention, the fully delivered status for returns is not accurate. Not all fully delivered documents should be released.  Further checks should be performed for Returns in the fully delivered status:

  • Check Jean O’Brien’s email she will send daily showing which documents can be released.
  • Or Another way to check is to use MB51:

Check MB51 with material / plan / customer: check that the plant has received the product back using 651 (and not cancelled by 652) and 4** transaction (4** must show 2 lines in the result

  • one with value and one without) so we don't have FI-CO differences, and that it is the same quantity as the credit memo (note: Unit of measure can be different). 

In this example, Stock movement 651 is for 3 DR. There is no cancellation of 651 by a 652 movement. Then we do have 2 lines for 459 documents. One with value, one without => OK, conform with what is expected.

Now check the quantity. The 651 and 459 must match. In this example, there is a unit difference.

The 651 movement is in DR (Drums). We see in the material description (circled in Red) that 1 DR = 440.92 LB. We calculate that 3 DR = 1322.76 LB. 1322.76 is the quantity in the 459 movement => we can validate that the quantity in 651 = to the quantity in 459 => Return validated.

If there is a quantity difference, send an email to the CSR (ZI/VW partner) to check. 

Image Added


Status
colourBlue
titlestep 10

Check the value that shows on the validation email and compare to the net value in the document to validate it is matching.

Same controls as other documents apply (validation email from the right person depending on the validation matrix, …)

Image Added

 

3. Request Correction / additional information about the Post invoicing document

For each doc failing controls, send an email to the CSR (ZI / VW partner in the header Partner tab) stating the failed controls and requesting the missing information / correction of the inaccuracies. Once the Service Center has received a satisfying answer, ask the CSR to add this justifying email trail in the attachments. 

 

4. Release billing block

When all controls are successfully completed:

Go in Item Overview tab

Remove billing block 08, 09 or 14 (replace Block with Blank) 

Image Added

Save  

Note

Note: Twice a day, the actual debit / credit memos and Credit for returns (invoices) will generate by job

Image Added

 

 

5. Validation matrix update  

 

Yearly, OtC Service Center sends an email to the Regional Finance Manager NA (ie as of 03/2016: Carl Machado) to retrieve the updated matrix for Novecare and for Special Chem:Vincent Toussaint and Lesa Nerey. 

If the validation matrix is updated outside of the standard timing (beg of the year), Finance is in charge of informing the OtC Service Center Manager (ie as of 03/2016: Walquiria Costa

 

 

Publishing controls

 

After the controls are performed, the results are communicated to TQM team, copy to the OTC BO Manager, Team Leader and team Specialists. 

The errors detected on controls are registered in the following file for further analysis and follow-up: 

...