1.0 Overview
Business Context and Application Overview
...
Domain: Programme Management / Finance
Main stakeholders: Service Delivery Managers (SDM), Pool Leads, Product Managers, Program Managers, PMO, Leadership Team (LT)
Business objective/value: Use data sourced from internal databases to create KPIs, determine project financial or execution status and provide decision useful information to stakeholders eliminating the need for manual intervention .
Main function: The dashboard is a visualization tool which provides authorized users with information on project financial and operational status. Various KPIs are also created using data sourced from Accolade and enriched with derived indicators to provide a complete overview to users.
The SBS Project Portfolio dashboard is used by the PMO team to monitor project deliverables, provide project financial summary and present any risks and issues. It provides a single source of information to the team and stakeholders on project KPIs, execution status, risk and issues over a specific period. e.g.
- Project Status monitoring - Operational Burn Rate
- Project Status monitoring - Status Update Frequency
- Project Status monitoring - Carry Over not planned
- Financial Status - Project Burn Rate
- Financial Status - Project Close to Over Budget
- Financial Status - Split Capex OTC
- Financial Status - Project on Budget
Provide an overview of the app (e.g Domain, key processes, purpose of the app, etc)
Application User Profile
Describe the key User profiles that exist for the application.
General role/Viewer role:
Approver role:
Target Users:
As examples: Controllers / Accountants
VERSION | DATE | MODIFIED BY | DESCRIPTION |
0.01 | dd.mm.yyyy | <Insert name> | Initial draft |
Application Type
| Data Product Type |
|
| Technologies |
|
Data Sources Note: list of all applications and various environment |
|
Application Overview
Domain: Programme Management / Finance Main stakeholders: Service Delivery Managers (SDM |
Application Contact Details
- Claire Bazin
- Dominique de Gouberville
), Pool Leads, Product Managers, Program Managers, PMO, Leadership Team (LT) |
Sign-Off / Approval
...
Business objective/value: Use data sourced from internal databases to create KPIs, determine project financial or execution status and provide decision useful information to stakeholders eliminating the need for manual intervention . Main function: The dashboard is a visualization tool which provides authorized users with information on project financial and operational status. Various KPIs are also created using data sourced from Accolade and enriched with derived indicators to provide a complete overview to users. The SBS Project Portfolio dashboard is used by the PMO team to monitor project deliverables, provide project financial summary and present any risks and issues. It provides a single source of information to the team and stakeholders on project KPIs, execution status, risk and issues over a specific period. |
Application Contact Details
| Role (if applicable) | Name | Department | |
|---|---|---|---|
| Product Owner |
| ||
| Technical Product Owner | |||
| Users | Service Delivery Managers (SDM), Pool Leads, Product Managers, Program Managers, PMO, Leadership Team (LT) |
Sign-Off / Approval
| Role (if applicable) | Name | Department | Sign-Off | |
|---|---|---|---|---|
| Product Owner | Claire Bazin | |||
| Product Owner | Dominique de Gouberville | |||
| Project Manager | Mauricio Nagahama | Project Manager • Delivery | DATA, ANALYTICS & AI PLATFORM_ECO | mauricio.nagahama@solvay.com | |
| Technical Sign off | Fernando Girante | Data Architect • Data & Analytics & AI Platform | DATA, ANALYTICS & AI PLATFORM_ECO | fernando.girante@solvay.com | |
| Technical Sign off | Anon Kasemvilas | Data Engineer • Data architecture & engineering_ECO | DATA, ANALYTICS & AI PLATFORM_ECO | anon.kasemvilas@solvay.com | |
| Technical Sign off | Maxime Marboeuf | Data science & AI_ECO | DATA, ANALYTICS & AI PLATFORM_ECO | maxime.marboeuf-ext@solvay.com |
Application Access Rights
Access to the PMO dashboard depends on the user's profile which ensures that the user is allowed to perform the requested action (e.g. Run reports and download results). The user profiles (“normal user” and “advanced user”) at the same time correspond to the privileges granted according to the Business Unit the user belongs to using Single Sign On functionality
Department | GBU Code | Role | Right | Comments |
Business Context
Scope:
In-Scope
This document covers the requirements for the PMO Dashboard to be migrated onto Tableau
- Main dashboard visualisation and filters
- Access to data post corporate action (split)
- Access to the dashboard
Out Of Scope
- Data Sourcing requirements are out of scope of this document.
2.0 Business Process
...
Capture the business process that the application supports . This can be describe through a process diagram or a business capability model.
The PMO team regularly monitors the overall financial and operational status of several programmes and projects within the organisation and provide update to stakeholders on project or programme status. The team needs the capability to extract and transform data seamlessly for the required parameters that have been pre-defined as part of the reporting process.
Specifically, the PMO team objectives are:
- Portfolio Monitoring: The team requires the capability to monitor projects and programmes that are Open or Closed within a defined time period in order to determine status, be aware of risks to project delivery and provide decision useful information to stakeholders.
- Data sourcing: The PMO team sources project operational and financial data from Accolade (Solvay internal DB) and vshare.
- Reporting: The PMO team requires the capability to create reports from the data extracted from Accolade/vshare, highlighting several defined KPIs to provide updates on project financial and operational status.
- Automation: The extraction, refresh and KPI update process are to be performed without manual intervention.
2.1 Challenge/Opportunities
Clearly articulate the specific problem or opportunity that the application is addressing within the business by leveraging from data. This should be a concise and well-defined statement that captures the essence of the challenge or opportunity that the application is trying to solve by providing insight from the data.
The new PMO dashboard in Tableau will provide authorised users with the capability to leverage multiple data sources within Solvay to review Financial and Operational performance of programmes and projects within a 3.5 year rolling window and have instant access to KPIs, with automated data refresh, eliminating the need for any manual interference.
- E ffective presentation of data: The PMO team require the capability to present KPIs and project status information in an automated fashion, showing the most impactful metrics.
- Consolidated reporting: A single source pf reporting Financial and Operational status of projects and programmes including KPIs
- Eliminate manual spreadsheets: The reporting process should not involve manual intervention
3.0 Application Feature Overview
...
Information about the existent features in the application.
Feature | Description | Latest uppdate in production (DD/MM/YYYY) |
|---|---|---|
4.0 Business Objects
...
This section should contain a table with the business objects used in the reports with links to the business object definition in LeanIX. The purpose is to ensure that all DA&AI Products adhere to a centrally maintained list of business objects and definitions to allow us to achieve our digital ambitions. For any questions about business objects and LeanIX, contact Data Governance or the Enterprise Information Architect.
Data Domain | Business Object (in LeanIX) | Business Object Definition (only use when the object is not yet in LeanIX) |
|---|---|---|
| ex: Marketing & Sales | ex: Customer | |
Functional Description
| Expand | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DashboardData Attributes and Mapping: https://docs.google.com/spreadsheets/d/1zaJ5Q87nML7v4CHXhNf3qcng_4EzJ0pKWVPr0OyzUCo/edit#gid=1844818474
Data InputAs-Is Data Sources (including the nature of the data and what is it needed for):Currently the PMO Dashboard is implemented in Qlikview. Data is sourced from Accolade_SBS_Portal using two main queries (SGM_CUSTOM_VIEW, SGM_CORE_Project Details) and a Stored Procedure ( RSP_QV_GetMergedMetricsForGroupID) which uses GROUPID_SYS as a parameter .
As-Is Data Model:
Target State Data Model:The target state data sourcing model will re-use existing data model (queries and Stored Procedures) as well as include additional calls to the Database using GroupID_SYS as shown below.
Target State Data Sourcing:
Transformation Rules (for each of the data source in the previous point):In the target state, additional filters to the data extract are required to be implemented in the result of the SGM_CORE_Project Details / CRV_ZGetProjectDetails query
Visualization
PMO Dashboard AS-IS Visualisation: Dashboard filters: - Roadmap |
...
Claire Bazin
...
Dominique de Gouberville
...
Application Access Rights
Access to the PMO dashboard depends on the user's profile which ensures that the user is allowed to perform the requested action (e.g. Run reports and download results). The user profiles (“normal user” and “advanced user”) at the same time correspond to the privileges granted according to the Business Unit the user belongs to using Single Sign On functionality
...
Department
...
GBU Code
...
Role
...
Right
...
Comments
Business Context
Scope:
In-Scope
This document covers the requirements for the PMO Dashboard to be migrated onto Tableau
- Main dashboard visualisation and filters
- KPI dashboard visualisation and filters
- Access to the dashboard
Out Of Scope
- Data Sourcing requirements are out of scope of this document.
Business process:
The PMO team regularly monitors the overall financial and operational status of several programmes and projects within the organisation and provide update to stakeholders on project or programme status. The team needs the capability to extract and transform data seamlessly for the required parameters that have been pre-defined as part of the reporting process.
Specifically, the PMO team objectives are:
- Portfolio Monitoring: The team requires the capability to monitor projects and programmes that are Open or Closed within a defined time period in order to determine status, be aware of risks to project delivery and provide decision useful information to stakeholders.
- Data sourcing: The PMO team sources project operational and financial data from Accolade (Solvay internal DB) and vshare.
- Reporting: The PMO team requires the capability to create reports from the data extracted from Accolade/vshare, highlighting several defined KPIs to provide updates on project financial and operational status.
- Automation: The extraction, refresh and KPI update process are to be performed without manual intervention.
Challenge/Opportunity:
The new PMO dashboard in Tableau will provide authorised users with the capability to leverage multiple data sources within Solvay to review Financial and Operational performance of programmes and projects within a 3.5 year rolling window and have instant access to KPIs, with automated data refresh, eliminating the need for any manual interference.
- Effective presentation of data: The PMO team require the capability to present KPIs and project status information in an automated fashion, showing the most impactful metrics.
- Consolidated reporting: A single source pf reporting Financial and Operational status of projects and programmes including KPIs
- Eliminate manual spreadsheets: The reporting process should not involve manual intervention
Business Glossary
Terminology used in this application consider to be added in -> Enterprise Data Governance
...
Description
Application Feature List
...
Functional Description
| Expand | |||
|---|---|---|---|
| |||
DashboardData Attributes and Mapping: https://docs.google.com/spreadsheets/d/1zaJ5Q87nML7v4CHXhNf3qcng_4EzJ0pKWVPr0OyzUCo/edit#gid=1844818474 | |||
| Data Product Type |
| ||
| Technologies |
| ||
Data Sources Note: list of all applications and various environment |
|
| AS-IS Tables |
| SGM_CUSTOM_VIEW |
| SGM_CORE_Project Details |
| SGM_PROJECTMETRICS_15 |
| SGM_PROJECTMETRICS_62 |
| SGM_PROJECTMETRICS_94 |
| SGM_PROJECTMETRICS_108 |
As-Is Data Model:
Target State Data Model:
The target state data sourcing model will re-use existing data model (queries and Stored Procedures) as well as include additional calls to the Database using GroupID_SYS as shown below.
GroupID_SYS:
15, 62,94,108
GroupID_SYS:
18, 46, 109, 63, 64, 65, 66, 103, 104, 69, 111, 105, 106, 110, 124
Execute the stored procedure iteratively, with the different parameters to obtain the different results sets needed for the scope of the project
Target State Data Sourcing:
Business Concept
Database Object
Link to output specification
Comments
SGM_CUSTOM_VIEW
CRV_Initiative_V3
<comment or description of the concepts in the table>
SGM_CORE_Project Details
CRV_ZGetProjectDetails
SGM_PROJECTMETRICS_15
Exec RSP_QV_GetProjectMetricsForGroupID 15
SGM_PROJECTMETRICS_62
Exec RSP_QV_GetProjectMetricsForGroupID 62
SGM_PROJECTMETRICS_94
Exec RSP_QV_GetProjectMetricsForGroupID 94
SGM_PROJECTMETRICS_108
Exec RSP_QV_GetProjectMetricsForGroupID 108
SGM_PROJECTMETRICS_18
Exec RSP_QV_GetProjectMetricsForGroupID 18
SGM_PROJECTMETRICS_46
Exec RSP_QV_GetProjectMetricsForGroupID 46
SGM_PROJECTMETRICS_109
Exec RSP_QV_GetProjectMetricsForGroupID 109
SGM_PROJECTMETRICS_63
Exec RSP_QV_GetProjectMetricsForGroupID 63
SGM_PROJECTMETRICS_64
Exec RSP_QV_GetProjectMetricsForGroupID 64
SGM_PROJECTMETRICS_65
Exec RSP_QV_GetProjectMetricsForGroupID 65
Exec RSP_QV_GetProjectMetricsForGroupID 66
Exec RSP_QV_GetProjectMetricsForGroupID 103
Exec RSP_QV_GetProjectMetricsForGroupID 104
Exec RSP_QV_GetProjectMetricsForGroupID 69
Exec RSP_QV_GetProjectMetricsForGroupID 111
Exec RSP_QV_GetProjectMetricsForGroupID 105
Exec RSP_QV_GetProjectMetricsForGroupID 106
Exec RSP_QV_GetProjectMetricsForGroupID 110
Exec RSP_QV_GetProjectMetricsForGroupID 124
Transformation Rules (for each of the data source in the previous point):
In the target state, additional filters to the data extract are required to be implemented in the result of the SGM_CORE_Project Details / CRV_ZGetProjectDetails query
- Extraction rules and filters:
- Project Closed Date >= 3.5yrs
- Project Closed = 0
- Exception handling rules (how do we handle when data does not come in the format we need) : Normal exception handling rules apply
- Enrichments (normally joins)
- Aggregation rules
- Extraction rules and filters:
KPI's Definitions
Budget and Cost File: Budget & Cost File: 2F250000.xlsm
Budget & Costs File:
(Act.+Planned CAPEX) + (Act.+Planned OTC) = Act.+Planned Total
Actual Planned Total for the current year -(Current year Actual Cost/Actual Planned Total for the current year)
Budget & Cost File:
Number of working days between Requested Start Date (PMO Gate) and End date
Budget & Cost File:
if the number of working days between Requested Start date (PMO Gate) and today divided by Operational Time Total KPI (NUMBER 4). If a value is returned, display that value otherwise if it shows an error just display 1
Budget & Cost File:
Actual Cost for the current year divided by the Actual Planned Total for the current year
Budget & Cost File:
Burn Rate divided by Operational Time total
KPI 4 / KPI 5
Budget & Cost File:
If KPI 5 is greater than 50 % display 1 - Ahead of Schedule >50%"
If KPI 5 is greater than 30 % display 1 - Ahead of Schedule 30%"
If KPI 5 is greater than -30 % display "3 - Linear"
If KPI 5 is greater than -50 % display "4 - Below Schedule 30-50%"
else display "5 - Below Schedule more than 50%"
Budget and Cost File:
Display a list of projects where the Total Approved amount is BLANK and "Status" is "On-going" or "Went Live"
closed projects with actuals after the closure date
Budget and Cost File:
Display the list of projects (+ number) with an increase of the budget
if(project to be considered="no";"";if(days since Last update ="";"6.never updated";if(days since Last update <31;"1.Less than 30 days";if(days since Last update <61;"2.between 30 & 60 days";if(days since Last update <91;"3.between 2 & 3 month";if(days since Last update <181;"4.beetween 3 & 6 month";"5.more than 6 month"))))))
Budget and Cost File:
Display a histogram of projects showing how frequently their status has been updated.
if the project to be considered field = NO, and the days since last update is blank = 1; the status =6 Never Updated
if the project to be considered field = NO, and the days since last update is < 31 ; the status = 1. Less Than 30 days
if the project to be considered field = NO, and the days since last update is < 61 ; the status = 2. Between 30 and 60 days
if the project to be considered field = NO, and the days since last update is < 91 ; the status = 3. Between 2 and 3 months
if the project to be considered field = NO, and the days since last update is < 181 ; the status = 4 Between 3 and 6 months
else display 5. more than 6 months
updated=countifs('project to be considered;"yes";'financial uptodate;"1")
not updated=countifs('project to be considered;"yes";'financial uptodate;"3")
no KFD=countifs('project to be considered;"yes";'financial uptodate;"")
Budget and Cost File:
Display the number of projects where the financial status of the project has been updated
if the project to be considered field = yes and the financial up to date field = 1; the status = Updated
if the project to be considered field = yes and the financial up to date fiekd = 3; the status = Not Updated
if the project to be considered field = yes and the financial up to date filed = blank; the status = No KFD
below, above, on track
Budget and Cost File:
Display a histogram of Project forecasts vs approved budget
Status: below, above, on track
If forecast budget is below ref approved: Below
If forecast budget if above approved ref: Above
If forecast budget if equal to approved ref: On Track
slightly delayed=countifs('project to be considered;"yes";'on time;"2")
delayed: countifs('project to be considered;"yes";'on time;"3")
Budget and Cost File:
Display a histogram of the number of projects that are "On Time", "Slightly Delayed" or "Delayed"
The value of On Time = 1
The value of Slightly Delayed = 2
The value of Delayed = 3
Budget and Cost File:
Display a histogram of the List of projects where end date<month date
Budget and Cost File:
Display a histogram of the list of projects comparing Approved vs forecast
Visualization
Description
- Split Capex / OTC
- Finance Update Frequency
- Burn Rate Budget
- Forecast Accuracy Rate
- Operational Time Total (in days)
- Operational time to date vs total (%)
- Operational Burn Rate
- Project (Planned, ongoing, went live) with no approved budget but with some actuals
- Projects not yet started with a start date in the past
- Carryover Not Planned
- Status Update Frequency
- On Budget
- On Time
- Project Close to Over Budget
PMO Dashboard AS-IS Visualisation:
PMO Dashboard TO-BE Visualisation:
Main Dashboard
Main Dashboard filters:
- roadmap
- accountable (Business)
- Product Manager/ Service Delivery Manager
- Platform/product
- Objective
- Project Manager
- Status
- Program
- Financial Treatment
- Project prioritization
- Start Quarter
- Monthly status date
- Financial up-to-date
KPI Page
6.0 System view (Architecture)
...
The purpose of this part is to describe the physical components that supports the functionalities of the product. From that point of view, this part should capture and visualizes the physical components of the data products such as backend, front end, data providers, libraries for ML models, etc.
Functional Requirements
| Requirement # | RoleRequirement Group | Requirement Title | Description/User Story | Acceptance Criteria |
|---|---|---|---|---|
| Data_Sourcing_1 | Data EngineerSourcing | Source validated, complete and correct data from Accolade for the PMO dashboard visualisation. | As an authorised SBS Dashboard user I want to have access to correct and complete data on the financial and operational status of SBS projects and programmes in the PMO Dashboard |
|
| Visualisation_Dashboard_Main_2 | Visualisation and User Experience | Create a Dashboard with Summary Table and Project Details (Main Dashboard) | As an authorised SBS Project Portfolio dashboard user , I need to see the overview of financial and operational details of projects using multiple filters and by dimensions
|
|
| Visualisation_Filters_3Visualisation_Dashboard_KPI_1 | Visualisation and User ExperienceExperience - Dashboard Filter | Implement filters to display relevant decision useful information for users Create a KPI table/histogram for Project Forecast Accuracy Rate | As an authorised SBS KPI dashboardDashboard user ,I need to see a table/histogram of projects with the forecast accuracy rate. |
|
| Visualisation_Dashboard_KPI_2 | Visualisation and User Experience | Create a KPI table/histogram for Project Operational Time Total (Days) | As an authorised SBS KPI dashboard user, I need to see a table/histogram of projects with the Operational Time in Days. |
|
| Visualisation_Dashboard_KPI_3 | Visualisation and User Experience | Create a KPI table/histogram for Project Operational Time to Date vs Total (in %) | As an authorised SBS KPI dashboard user, I need to see a table/histogram of projects with the Operational Time total to date vs Total (in %) |
|
| Visualisation_Dashboard_KPI_4 | Visualisation and User Experience | Create a KPI table/histogram for Burn Rate Budget | As an authorised SBS KPI dashboard user, I need to see a table/histogram of projects with the budget burn rate |
|
| Visualisation_Dashboard_KPI_5 | Visualisation and User Experience | Create a KPI table/histogram for Burn Rate vs Burn Rate Time (in %) | As an authorised SBS KPI dashboard user, I need to see a table/histogram of projects with the budget burn rate vs Burn Rate Time (in %) |
|
| Visualisation_Dashboard_KPI_6 | Visualisation and User Experience | Create a KPI Histogram for Operational Time Burn Rate KPI | As an authorised SBS KPI dashboard user, I need to see a histogram of projects with operational burn rate |
|
| Visualisation_Dashboard_KPI_7 | Visualisation and User Experience | Create a KPI Histogram for Project (planned, ongoing or went life) with no approved budget but with some actuals | As an authorised SBS KPI dashboard user, I need to see a histogram of project (with Status) with no approved budget but with some actuals |
|
| Visualisation_Dashboard_KPI_8 | Visualisation and User Experience | Create a KPI Histogram for Project (planned, ongoing or went life) with no approved budget but with some actuals | As an authorised SBS KPI dashboard user, I need to see a histogram of project (with Status) with no approved budget but with some actuals | The SBS KPI dashboard shall display a histogram with
|
| Visualisation_Dashboard_KPI_9 | Visualisation and User Experience | Create a KPI Histogram for Projects not yet started with a start date in the past | As an authorised SBS KPI dashboard user, I need to see a table of projects with a start date in the past that hasn’t began yet. |
|
| Visualisation_Dashboard_KPI_10 | Visualisation and User Experience | Create a KPI Histogram for Project Status Update Frequency | As an authorised SBS KPI dashboard user, I need to see a histogram of projects showing how frequently their status has been updated. |
|
| Visualisation_Dashboard_KPI_11 | Visualisation and User Experience | Create a KPI Histogram for Projects whose Finance Status is Up to Date | As an authorised SBS KPI dashboard user, I need to see a histogram of projects with finance status that is up to date. |
|
| Visualisation_Dashboard_KPI_12 | Visualisation and User Experience | Create a KPI Histogram for Project On Budget | As an authorised SBS KPI dashboard user, I need to see a histogram of projects with a project status is On Budget. |
|
| Visualisation_Dashboard_KPI_13 | Visualisation and User Experience | Create a KPI Histogram for Project is On Time | As an authorised SBS KPI dashboard user, I need to see a histogram of projects with a the project status is On Time. |
The histogram shall have month-year on the X axis and % on the Y axis
|
| Visualisation_Dashboard_KPI_14 | Visualisation and User Experience | Create a KPI Histogram for Project Close To Over Budget | As an authorised SBS KPI dashboard user, I need to see a histogram of projects with a project status is Close To Over Budget. |
|
| Visualisation_Dashboard_KPI_15 | Visualisation and User Experience | Create a KPI Histogram for Project Split CAPEX OTC | As an authorised SBS KPI dashboard user, I need to see a histogram of projects split between CAPEX and OTC. |
|
| Visualisation_Dashboard_Authorisation | Access and Authorisation | Restrict user access to dashboard | As an authorised SBS KPI dashboard Owner, I need access to the PMO dashboard and KPI dashboard restricted based on roles and business units. | Access to the dashboard shall be restricted using Single Sign On or any role specific authorisation protocol Users are only able to see data relevant to their assigned profile |
Non-functional Descriptions
This part specifies criteria that describe the operation of the data product, rather than specific behaviours.
Usability
Regulatory Compliance
...
- The Dashboard will comply with Solvay’s regulations and compliance e.g., access only granted to authorized Users.
- Maintenance data will be split between either SCO or ECO, and Users will only have authority to one Entity data
want to have the capability to display data and navigate the the SBS Project Portfolio dashboard using the following filters: - Roadmap |
| |||
| Visualisation_Table_4 | Visualisation and User Experience - Dashboard Summary Table | Display summary table of financial and operational status of projects and programmes | As an authorised SBS Dashboard user I want to have a summary table which contains the financial and operational status of projects/programmes, in the dashboard. |
|
| Visualisation_Filters_5 | Visualisation and User Experience - Additional Table Dimensions | Create dimensions to filter project data | As an authorised SBS Dashboard user I want to have the capability to display data and navigate the the KPI Report Table on the SBS Project Portfolio dashboard using the following filters:
|
|
| Visualisation_Filters_6 | Visualisation and User Experience - Additional Table Indicators | Implement additional indicators filter for KPI Report Table | As an authorised SBS Dashboard user I want to have the capability to display data and navigate the the KPI Report Table on the SBS Project Portfolio dashboard using the following indicators:
|
|
| Visualisation_Table_7 | Visualisation and User Experience - KPI Report Table | Implement colour coded visualisation display on KPI report table | As an authorised SBS Dashboard user I want to have the capability to display colour coded traffic light KPIs (Red, Amber Green) on the KPI Report Table:
|
|
| Visualisation_Table_8 | Visualisation and User Experience - Dashboard Search Functionality | Create search field to support dashboard filter | As an authorised SBS Dashboard user I want to have a search capability on the dashboard, to support the main filters
|
|
| Attribute_Change_9 | Data Maintenance - Attribute Correction | Rename data fields on Dashboard |
|
|
7.0 Non-functional Descriptions
...
Please populate the relevant section and delete those that are not applicable.
7.1 Usability
Usability is about the ease with which a User can learn to start using the solution and the ease with which they can use the system. In addition to ease of learning and ease of use, usability also includes areas such as ease of recall, error avoidance and handling, accessibility among others e.g., 99% of metadata entry Users who have use the Maintenance Dashboard should be able to change filters, extract etc., when required. Maintenance data will be centrally stored in the Google Cloud platform, which will be available to other applications e.g., and Dashboards if needed.
7.2 Regulatory Compliance
Software systems must comply with legal and regulatory e.g., GDPR requirements, this can change depending on country, organisation industry and / or region. The software systems must be secure from unauthorized access. The Maintenance Dashboard will comply with Solvay’s regulations and compliance e.g., access only granted to authorized Users.
|
7.3 Security
Security refers to essential aspects that assure a solution and its components will be protected against unauthorized access or malware attacks. Important considerations related to security aspects of a system are User authentication, User authorization or User access privileges, data theft, malware attacks, data encryption, and maintaining audit trails, e.g., only Users with administrator access shall be able to create new accounts and assign data access privileges to the new accounts e.g.,
- All data will be encrypted in the dashboard
- Only authorised Users / Administrative Users will be able to access data.
- Maintenance data will be split between either SCO or ECO, and Users will only have authority to one Entity data.
7.4 Performance
Performance defines how fast a software system or a particular section of it responds to certain User actions under a certain workload. In most cases, this metric explains how long a User must wait before the target operation happens e.g., the page renders, a transaction is processed, etc., given the overall number of Users now. Performance requirements may describe background processes invisible to Users, e.g., backup and speed of data transfers.
7.5 Reliability
Reliability is the ability of a solution or its component to perform its required functions without failure under predefined conditions for a specified time / period. Reliability can possibly be specified in terms of average time system runs before failure occurs, percentage of operations completed successfully within a time / period, maximum acceptable failure probability, or number of failures within a period. Reliability aspects are in reference to (but not limited to) evaluation of the system to be considered as reliable, classification of reliability defining failures vs. regular failures, and the impact of failure on business operations. The Maintenance Dashboard will display data from the previous refresh of data.
7.6 Scalability
Scalability refers to the degree to which a solution can evolve to handle increased amounts of work. The increased amount of work could be in terms of the user base, transactions, data, network traffic, or other factors e.g., the system should be able to handle an additional load of a maximum of 5,000 Users every month for the next 6 months without any noticeable performance impacts.
7.7 Compatibility
Interoperability is the degree to which the solution is compatible with other components. It is a measure of how effectively the system interoperates with other software systems and how easily it integrates with external hardware devices.
Interoperability aspects to be discussed during elicitation are in reference to (but not limited to) software systems to be interfaced with along with data / messages to be exchanged and any standard data formats, hardware components to be integrated with, and any standard communication protocols to be followed e.g., Order Management system will push the order file into a secured file transfer protocol server from where it will be loaded into the system through a daily job. To guarantee between Google Cloud platform and SAP BW Queries e.g., BW_QRY_MVPMOR01_0002, Solvay has introduced a new tool called Xtract (Xtract).
7.8 Availability
Availability is the degree to which the solution is operable and accessible when required. It is a measure of time during which the system is fully operational e.g., available for use and sometimes included as a Service Level Agreement (SLA) considering its criticality to the business, e.g., the system shall be at least 99% available on weekdays between 09:00 to 18:30 Central European Time (CET).
7.9 Refresh of the Data
Frequency, data, and time of the data refresh in the data product.
Data shall be sourced from the Accolade database 4 times per day (CET) => 6am, 12am, 6pm and 12pm Tableau refresh in PREPROD and PROD => 4 times per day (CET) => 6:15am, 0:15am, 6:15pm and 12:15pm |
Performance
Reliability
Scalability
Compatibility
Availability
Refresh of the Data
Data shall be sourced from the Accolade database 5 times per day |
Storage of the Data
|
...