Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Image RemovedImage Added

Info
titleProcess Owner
Renato Engrossa
D&A KPI's Operator
João Silva
PtP Data Process Expert
Info
titleD&PS Expert
Marie-Line Ardito
General Description
This indicator display the number of
 materials for maintenance created (question)

 

 materials created during the period
Image ModifiedMaterials details results can be analyzed by:
     
    •  Domain
    • Domain
    • Month
    • Month
    Image Added Date Reference:
            Material creation date
    Image ModifiedRefresh Frequency:
           3 times per month (1st, 5th and 26th) 
           *Loading M-1 Results

     

    Image Removed

    Image Added

    KPI Name
    Calculation
    Total
    sum of the number of material
    for maintenance
    codes created on the selected period
    Source Information: BW (WP1 & PF1)
    Core Query:
    ?
    BW_QRY_MV_MATAN1_0001 
    QV Query:
    QVSBS_BW_QRY_MV_MATAN1_001
    BW Filters
    Image Removed
    Image Removed