Purpose

The purpose of this document is to define the conversion approach to create Supplier Vendor Hierarchy in S/4 HANA.


Conversion Scope

The scope of this document covers the approach for converting active Vendor Hierarchy from Legacy Source Systems into S/4HANA following the Vendor Hierarchy Master Data Design Standard.


The data from legacy system includes:

  1. Vendors’ relevant general data according to relevancy criteria. Vendor classes used by active vendors with activities for the past 24 months according to Relevancy Criteria for Vendor in CNV-3007 Business Partners - General (Role 000000).

The data from legacy system excludes:

  1. Vendors blocked or marked for deletion.
  2. Purchasing Vendors with extended only to purchasing organization not in scope
  3. Inter-company Vendors
  4. Inactive vendors with no transactions for the past 2 yearsDuplicate vendors


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

WP2, PF2

Active Vendors Only active Vendors that are in-scope

Extract from LFA1LFA1 

40,000S/4 Hana<40,000
DCTData will be provided by business via excel upload to DCT40,000S/4 Hana<40,000










Additional Information

Multi-language Requirement

Document Management

Legal Requirement

Special Requirements




Target Design

The technical design of the target for this conversion approach based on MDS

Google Drive Live Link
urlhttps://docs.google.com/spreadsheets/d/1ST-_e-RdHJDD5EFKxkq8dZYMh_YQNkoS/edit?gid=1410070564#gid=1410070564
, tab: Supplier Hierarchy Defn.

TableFieldData ElementField DescriptionData TypeLengthRequirement
BUT050PARTNER1BU_PARTNERBusiness partner 1CHAR10R
BUT050RELNRBU_RELNRBusiness Partner Relationship NumberCHAR12R
BUT050PARTNER2BU_PARTNERBusiness partner 2CHAR10R
BUT050DATE_FROMDATSValidity Date (Valid From)DATS10R
BUT050DATE_TODATSValidity Date (Valid To)DATS10R
BUT050RELTYPBU_RELTYPBusiness Partner Relationship CategoryCHAR6R


Data Cleansing

No data cleansing is required for Vendor Hierarchy in the legacy system. If any cleansing is deemed necessary, it will be performed outside of the system.

As a result, the cleansed Vendor Hierarchy data will be populated directly in the Data Collection Template (DCT).

IDCriticalityError Message/Report DescriptionRuleOutputSource System

Conversion Process

The high-level process is represented by the diagram below:

Image Removed

Collection will be done manually in the Data Collection Template for the following scenarios:

  • For sites not on SAP-PF2 or WP2 systems
  • For new classes vendors that need to be created to support the to-be design


Data Privacy and Sensitivity

N/A


Extraction

  • Perform full data extraction from relevant tables in the source system(s).
  • Perform extraction through the application layer.
  • Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.

    Extract data from a source into . There are 2 possibilities:

    The data exists. connects to the source and loads the data into . There are 3 methods:

    Syniti. 

    1. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in Syniti. This is to be conducted using DCT (Data Collection Template) in Syniti.

    The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads


    Extraction Run Sheet

    Req #Requirement DescriptionTeam Responsible
    1Extract data from source system based on relevancy ruleSyWay Data Team
    2Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. SyWay Data Team
    3Business to create the vendor hierarchy using the extract from previous step.S2P Business / Data Owner




    Selection Screen

    Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set
    N/A



















    Data Collection Template (DCT)

    Target Ready Data Collection Template will be created for Vendor Hierarchy data with exception of some fields which require transformation as mentioned in the transformation rule.

    DCT Rules

    Field NameField DescriptionRule
    PARTNER1Business partner 1LIFNR should be in BUT000
    RELNRBusiness Partner Relationship NumberInternal
    PARTNER2Business partner 2LIFNR should be in BUT000
    DATE_FROMValidity Date (Valid From)31.12.99992 years prior to cut-over or Loading date (YYYYMMDD)
    DATE_TOValidity Date (Valid To)31.12.9999Default to 99991231
    RELTYPBusiness Partner Relationship CategoryDefault to BUR021 (Parent-Child RelationshipBUR998 (Is Partner of)

    Extraction Dependencies

    Item #Step DescriptionTeam Responsible
    13007 Business Partners - General (Vendor Master)S2P










    Transformation

    The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti to make the data Target ready:

    1. Perform value mapping and data transformation rules.
      1. Legacy values are mapped to the to-be values (this could include a default value)
      2. Values are transformed according to the rules defined in Syniti.
    2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

    Transformation Run Sheet

    Item #Step DescriptionTeam Responsible
    1Obtain DCT Sign-off from BusinessSyWay S2P Data Team
    2

    <Add steps from Syniti

    Migrate here>

    here>

    1. Load the DCT data via Construct page.
    2. Run the ETL for the object.
    SyWay S2P Data Team
    3Review and Validate Error and Preload ReportsSyWay S2P Data Team
    4

    Generate Load Files

    SyWay S2P Data Team


    Transformation Rules

    Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
    1DCT
    PARTNER1Business partner 1S/4 HanaBUT050PARTNER1Business partner 1Direct MappingCross Reference
    2DCT
    RELNRBusiness Partner Relationship NumberS/4 HanaBUT050RELNRBusiness Partner Relationship NumberInternal
    3DCT
    PARTNER2Business partner 2S/4 HanaBUT050PARTNER2Business partner 2Direct MappingCross Reference
    4DCT
    DATE_FROMValidity Date (Valid From)S/4 HanaBUT050DATE_FROMValidity Date (Valid From)Direct Mapping
    5DCT
    DATE_TOValidity Date (Valid To)S/4 HanaBUT050DATE_TOValidity Date (Valid To)Direct Mapping
    6DCT
    RELTYPBusiness Partner Relationship CategoryS/4 HanaBUT050RELTYPBusiness Partner Relationship CategoryDirect Mapping


    Transformation Mapping

    Mapping Table NameMapping Table Description
    xtPARTNERBP Cross ReferenceN/A






    Transformation Dependencies

    List the steps that need to occur before transformation can commence
    Item #Step DescriptionTeam Responsible
    1Ensure DCT tables completenessSyWay S2P Data Team










    Pre-Load Validation

    Project Team

    Completeness

    TaskAction
    Verify Record CountSyWay S2P Data Team to verify that the total number of relevant records from the  DCT is equal to the total number of records in the Preload and Load Sheets.





    Accuracy

    TaskAction
    Conversion Accuracy

    SyWay S2P Data Team to verify that all fields below meet pass the checks:

    1. Mandatory Fields
    2. Field and Value Mapping Correctness
    3. Null Checks
    4. Text Length Checks
    Review Error ReportsReview and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.



    Business

    Completeness

    TaskAction
    Verify Record CountBusiness Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets.





    Accuracy

    TaskAction
    Conversion AccuracyBusiness Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data).





    Load

    The load process includes:

    1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
    2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

    Load Run Sheet

    Item #Step DescriptionTeam Responsible
    1Go to <Load Tool> (calling the function module BAPI_BUPR_RELATIONSHIP_CREATE)SyWay S2P Data Team
    2Load 3 records for "Create ClassVendor Relationship" function to validate if data is loaded successfully without errorsSyWay S2P Data Team
    3Validate few records loaded by accessing standard transactions from S/4HANA E.g. CL03 / CL6AN for ClassBP > RelationshipsSyWay S2P Data Team
    4Generate post load report if step 3 is validatedSyWay S2P Data Team


    Load Phase and Dependencies

    Configuration

    Item #Configuration Item (Standard)
    1

    TBZ9 - BP relationship categories (Confirm if activated for Vendor)

    Jira
    serverSyensqo's Jira
    serverIdd8efc1ef-48bd-3b4e-8714-ad827f4f059b
    keyPDM-624





    Conversion Objects

    Object #Preceding Object Conversion Approach
    13007 - BP General Vendor Masterlist the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram)




    Error Handling

    Error TypeError DescriptionAction Taken
    Configuration

    Invalid relationship category Type

    Engage Functional team to expedite and fix the error in the system







    Post-Load Validation

    Project Team

    Completeness

    TaskAction

    Verify Count

    SyWay S2P Data Team to verify the record count created in target S/4 HANA by accessing post load reports in Syniti or standard reports from S/4 HANA.

    Verify Logs

    Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.).




    Accuracy

    TaskAction

    Conversion Accuracy

    Verify that the Characteristics data in target S/4 HANA were loaded correctly via Syniti post load reports or standard reports from S/4 HANA.






    Business

    Completeness

    TaskAction

    Verify Count

    Download Post Load Reports from Syniti and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.






    Accuracy

    TaskAction

    Conversion Accuracy

    Verify that the Vendor Characteristics data in target S/4 HANA were loaded correctly via Syniti post load reports or standard reports from S/4 HANA






    Key Assumptions

    • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
    • is in scope based on data design and any exception requested by business.