| borderColor | #009EE0 |
#009EE0| #f2f2f2 | | titleColor | #ffffff |
|---|
| borderWidth |
|---|
|
3 RtRborderColor | #009EE0#009EE03 | Macro-Process: Costing / costing model architecture |
| Panel |
|---|
| borderColor | #009EE0 |
|---|
| bgColor | #009EE0 |
|---|
| borderWidth | 3 |
|---|
|
Scope: Level 1 | Panel |
|---|
| borderColor | #009EE0 |
|---|
| bgColor | #009EE0 |
|---|
| titleColor | #ffffff |
|---|
| borderWidth | 3 |
|---|
|
Guideline |
Area: Responsability Area
previous Operation(s):
Risk : Slow turn inventory reserves do not comply with group rules
Objective : FRA updates every year slow turn inventory reserve calculation procedure for his/her plant(s)
Process description : Program ZWFA12A is run at the end of every quarter to provide a slow turn inventory reserve proposal. Strategic parts are parts whose unavailability would lead to a significant loss in OEE (Overall Equipment Effectiveness).
Strategic parts are not depreciated.
Control description : FRA fills in check lost
| Expand |
|---|
|
SAPCost
| Panel |
|---|
| bgColor | #f2f2f2 |
|---|
| titleColor | #ffffff |
|---|
| borderWidth | 1 |
|---|
|
Guideline |
| Expand |
|---|
| title | I fill the template download the last version of the check list |
|---|
|
Download the file IAC 02.06 Slow turn inventory reserve.xls There are 4 sheets in the file Image Added
2 sheets must be filled: 1. "Reserve FRA check-list" in english or in french Image Added
2. Procedure Image Added| Include Page |
|---|
| I fill the template (IAC.02.06) | I fill the template (IAC.02.06)
| Expand |
|---|
| title | I do the check listfill the checklist |
|---|
|
Start to fill : - the site
- the controller's name
- the date
- the period
Then answer "Yes" "No" or "N/A" to confirm that each control is performed . | Warning |
|---|
If the answer is "No" or "N/A", it is compulsory to add a comment in column H |
It is possible to add a control evidence (attachment or a link) | Include Page |
|---|
| I do the checklist (IAC.02.06) | I do the checklist (IAC.02.06) |
Image Added
| Expand |
|---|
| title | I follow the procedure |
|---|
| | Include Page |
|---|
I follow the procedure | I follow the procedure |
| attach the procedure & sales force ticket |
|
1. Attach your validated procedure describing how items excluded from slow turn reserve are identified | Section |
|---|
| Column |
|---|
| - Choose "insert"
- Click on the "Object" button
- This window will open
- Select "Create from File"
- Add you file by clicking in "Browse"
- Select "Display as icon"
- Select OK
|
| Column |
|---|
| Image Added |
|
2. Enter the Service One ticket that was used to submit the calculation to the service center. Image Added
|
Next Operation(s): 