Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Scope

Google Drive Live Link
urlhttps://drive.google.com/file/d/19gK8sn5qSIDFG8LMmlMzEiY3moyryzz0pc3N-uQFJbo/view

High level user flow (BA & business stakeholders) 

https://miro.com/app/board/uXjVN5MF2XQ=/#tpicker-content

Data flow (BA and Architect) 

https://app.diagrams.net/#G1mfwQh_gsmV1lNLwc9OfvJrRAWPaZyTYm#%7B%22pageId%22%3A%22jheWgB9ikYpCB23Nlwa9%22%7DGlossary 

Web app requirements 

Production:  https://solvayagile.atlassian.net/browse/EBR-20 ->Done
Laboratory: https://solvayagile.atlassian.net/browse/EBR-31 →Done 
Quality:   https://solvayagile.atlassian.net/browse/EBR-32 ->Done
Logistic: https://solvayagile.atlassian.net/browse/EBR-30 -> Done

...

Packaging attributes from SAP (MTP and Torrelavega) 

Jira
serverJira
serverIdbbf5f9ee-7f3e-3274-bb6e-be12673f2166
keyEBR-81
 

Test data in BQ views→ In progress


Other sources 

 Reference table

Jira
serverJira
serverIdbbf5f9ee-7f3e-3274-bb6e-be12673f2166
keyEBR-44
To be discussed with the technical team In progress (technical decision making) 

ProdX data view (Data model)

Jira
serverJira
serverIdbbf5f9ee-7f3e-3274-bb6e-be12673f2166
keyEBR-41
pending the meeting with the owner of the app (Technical info to connect)

...

Batch manufacturing time (start/stop time) calculations

Jira
serverJira
serverIdbbf5f9ee-7f3e-3274-bb6e-be12673f2166
keyEBR-109
 in progress Requirements specification is pending stakholders decision making on the excluding nonconformity period from the calculation.  Pending decision making on where to host the calculation. Web app or BG. If web app. 


Source batch 21 & PI sheet 

...