Tasks to be completed when documenting an operation (from creation to publication)

 1. Enter the Title of the operation / page

2. Add the following Labels

    • Scope of applicability: ww, country_accounting 

    • Country or group of countries (if applicable): belux, china, france, italy, lam, nam, uk_ie, bulgaria, dach, netherlands, iberia, poland, latvia, australia, india, japan, south_korea, thailand, singapore, new_zealand, emea_transversal, apac_transversal

    • Unit and Domain according to the List of labels to be used in the Finance Service Line space

      • E.g. 1: WW Operation in Financial Accounting under domain "Central Finance Processes & Compliance":
        • Labels to be used: ww, financial_accounting, central_fin_proc_compliance

      • E.g. 2: France Operation in Financial Accounting:
        • Labels to be used: country_accounting, france, financial_accounting
          (for country operations, the Domain is always country_accounting)


3. Fill in all fields as described above

4. Name the title of each section using OPD methodology naming convention - Infinitive verb without the “to”, mainly action verb...something) - " I do something..."

5. Once the description of the operation is completed, ensure it is approved and published by launching the SBS-Finance approval workflow 




Panel
bgColor#F7F7F7
titleColor#ffffff
borderWidth1
borderStylenone
Domain: Country Accounting



Panel
bgColor#F7F7F7
borderWidth1
borderStylenone

Responsibility area: N/A


Table of contents 

Table of Contents
maxLevel2



Panel
borderStylenone
Scope


ERP


Frequency

 

References

ZWPP40A; ZWPP40B; SM37; KB21N; ZWPP40B; S_ALR_87013611


Forms

JP - CP Variance allocationAllocation


Attachments




Previous OP <<

Page_title
>> Next OP



1. Objective and Scope

1.1. Objective of this Operation

The purpose of this document is This procedure explains how to choose process order in order to adjust between actual and planned costs.

1.2. Scope

This procedure applies to company 6110 (61106 Solvay Special Chem Japan, Ltd. ? )(error)



2. Definitions

See Finance Glossary:



3. Tasks description

3.1. I retrieve the report of planned and actual costs 

(please confirm the title)(error) 

(can you give subtitles to which step of this section?)(error)


Step 1Run transaction ZWPP40A

1) Go to T-code ZWPP40A and select variant “0194 ANAN”.

JP1.pngImage Modified

JP2.pngImage Modified


2) Fill information in Extraction (Background mode) and posting date is the first day to the last day of the closing month, then execute in background.

JP3.pngImage Modified

Image Modified


3) Click the tick sign.

JP6.pngImage Modified


4) Choose "immediate" and click on "save".

Capture.PNGImage Modified


Step 2Run transaction SM37

1) Go to T-code SM37, execute and wait until the job finishis finished.

Capture1.PNGImage Modified

Capture3.PNGImage Modified


Step 3Run Transaction ZWPP40B

1) Go to T-code ZWPP40B Fill ZWPP40B Fill the Extraction and layout as the variant the variant in "ZWPP40A".

Image Modified

Image Modified


2) Execute this program, and subtotal the first column.

Image Modified


3) After that filter Origin field as the list below. It needs to be filter one by one and then go to the further step.

Filter the column "origin" choose as below:

    • For water: 0194-1001
    • For electricity: 0194-1002
    • For steam: 0194-1003


Image Modified

Image Modified


4) Export file from RCS by each filter; water, electricity and steam.

Click "list" and choose "local file".

Image Modified


Choose "spread sheet", insert the route where we will save the file, and then click "generate".

Image Modified

3.2. I choose the process order

Open the file which has been saved and filter the column with a star sign.

Image Modified


Select five highest-actual-quantities amount.

Image Modified

Clear filter and choose the last order of each material to be used for allocating CP variance.

Image Modified


Note
titleRemark

For water and stream, the procedures are same as electricity except choosing only three highest-actual-quantities amount.


3.3. I calculate the cost allocated

Open file JP - CP Variance allocation. See attachment.Allocation (add file to aodocs Forms library)(error)

  • Data in green color are provided by site controller
  • Data in yellow color which need to find from T-code "S_ALR_87013611" in RCS system

Image Modified


Go to T-code Scode S_ALR_87013611:

  • Fiscal year: current year
  • From and To Period: Closing period

Image Modified


Drilldown to cost center value and fill the cost center as the picture shows. Then, execute.

Image Modified

Image Modified


Got the yellow part data.

3.4. I allocate costs

After filling information in yellow and green area, the amount is supposed to be allocated will be calculated per each process order, in the red square.

Image Modified


Go to T-code KB21N to allocate costs.

Costs should be allocated based on the excel file that has been filled in as the the table.

Image Modified


Image Modified


After allocation actual and planned has to be equal as information given by site controller. 

Image Modified3.5. Person of Contact (can you write this section in the other? If no, change the title according with the methodology I "do" something, e.g. I send/inform...)(error)


Info
titleContact person

Anan Kasei: site

contoller

controller


End of document.