Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Excerpt
hiddentrue

Page_title



Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1
Process:SBS-P-DRTR-03-001 Inventory Valuation



Panel
bgColor#f2f2f2
borderWidth1

Responsibility area:SBS-P-DRTR-02-004 Internal Control Monitor  



Panel
borderColor#ffffff
bgColor#ffffff
titleColor#ffffff
borderWidth1
Risk

Slow turn inventory reserve do not comply with group rules

Objective

FRA updates every year slow turn inventory reserve calculation procedure for his/her plant(s)

Process description

Program ZWFA12A is run at the end of every quarter to provide a slow turn inventory reserve proposal. Strategic parts are parts whose unavailability would lead to a significant loss in OEE (Overall Equipment Effectiveness).
Strategic parts are not depreciated.

Control description

FRA fills in check list

Former Controls

Inventories shall be depreciated at least quarterly based on the age and movements of the material. Proposal will be provided to FRA for analysis (* Possible to be done by site as well) 


Control description

SBS is preparing and sending the report with the Inventory reserves to the FRA for analysis and validationIAC 03.08.08



Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1
Scope:
Image Removed Image Removed
WP2 & PF2

Frequency

Image Removed June closing D4Quarterly - Last working day of March, June, September, November(Hardclose)

Control owner

Finance Responsible Assigned (FRA)

References
 


Expand
titleSAP Transactions

Content by Label
showLabelsfalse
max30
spacesSAPCost
showSpacefalse
sorttitle
operatorAND
cqllabel = "op_109" and space = "SAPCostCostProc"
labelsmaintain_assessment_cycles


Expand
titleCosting rules

Content by Label
showLabelsfalse
max30
spacesSAPCost
showSpacefalse
sorttitle
operatorAND
cqllabel = "op_109" and space = "CostFAQ"
labelsmaintain_assessment_cycles

Control evidences

 

  • Reports analyzed with comments

  • Updated reserve decision

 





Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1

  Guideline  



Expand
titleI download the last version of the check list

Download the file IAC 02.06 Slow turn inventory reserve.xls

There are 4 sheets in the file


2 sheets must be filled:

1. "Reserve FRA check-list" in english or in french

2. Procedure



Expand
titleI fill the checklist

Start to fill :

  1. the site
  2. the controller's name
  3. the date
  4. the period

Then answer "Yes" "No" or "N/A" to confirm that each control is performed .

Warning

If the answer is "No" or "N/A", it is compulsory to add a comment in column H

It is possible to add a control evidence (attachment or a link)



Every month, the controller creates a monthly form for his site, with all the controls that have to be made.

Expand
titleI attach the procedure & sales force ticket

1. Attach your validated procedure describing how items excluded from slow turn reserve are identified

Section


Column
width30
  1. Choose "insert"
  2. Click on the "Object" button
  3. This window will open
  4. Select "Create from File"
  5. Add you file by clicking in "Browse"
  6. Select "Display as icon"
  7. Select OK


Column
width70

 


 

2. Enter the sales force Service One ticket that was used to submit the calculation to the service center.

  

Expand
titleI post the control evidence in eRoom

1. Key points

 

Column

 

Content of the form

The objective
The description
The frequency (yearly, quaterly or monthly)
The control evidence to be posted
The procedures
Column

The cost cost analyst processes only what is compulsory. For instance in May, there is no need to make the quaterly controls.

  • For each control, a three-colored road sign is available. The cost analyst chooses the color according to the progress of his work

Image Removed

At the bottom of the form, there is a zone to attach files. In order to simplify the control, create one folder per control as below, and use the control refrence number to name it.
Image Removed
  • When the control is completed and the files attached to the form, the cost analyst validates the control by changing the color of the road sign in green.
  •  

    • When all the compulsory controls are in green, the cost analyst approves the form. It means that the work is done and validated. the validation status of the form changes to Image Removed

     

    2. Create a new form

    My eRooms ==> IAC ==> Controls report

     

     

    Column

    Choose the form according to your role :

    Image Removed

    Column

    Then create a new form

    Image Removed

     

     

    Image Removed

     

    Image Removed

     

     

    For more help, watch the demos :

    Create a new folder Image Removed Drag and drop a document Image Removed



    Viewtracker
    hidetrue