  1. Objective and Scope
    1. Objective of this operation
    2. Scope
  2. Task description
    1. Pre-closure Activities
      1. Check of Suspense Account
      2. Check of Retirement Flow
      3. Check of Postings without CO objects
      4. Check of BW table
      5. Account Clearing
        1. Clearing of Suspense Account
        2. Clearing of Lease Liability (ST) Lease reclassifications Account
        3. Clearing of LT Lease Debt - ST Portion Account
      6. Check of ASKB
      7. Check of AFAB
      8. Check of Z1AANNUL
1 - Objective and Scope

Objective of these operations

The purpose of these tasks is to ensure that all necessary checks are performed in order to guarantee the monthly IFRS 16 closure process.

Please be aware that these checks should be performed between D-5 and D-2.

Scope

This procedure is applied to all WW companies under IFRS 16.

2 - Task description

Pre-closure activities

       i. Check of Suspense Account (SAP transaction code FBL3N - PF1: G/L 5112100020 | WP1: 56030110)

The Suspense Account must always be balanced (the only exception when it's acceptable to not be balanced it is when a contract has a "payment in advance" rent posted).

This check should be performed along the month and in case it's not balanced it will need to be corrected until D-3.

Go to transaction FBL3N and insert the account and the company code, then select "Open items" at the last day of the month for which you are performing the check.

Image Removed

...

Image Removed

...

For contract 0005/200000 the amount is only in the column "Amount in local currency". This means that Suspense Account for this contract is actually balanced (the column "Amount in document currency" is 0,00), but the currency of this specific contract (GBP) differs from the currency of the company (EUR) and in this situation the error is due to different exchange rates in the system.

For contract 0005/200002 the difference is due to the presence of a "probable end date" in the valuation parameters of the contract, which is liminting the calculation of the valuation part of the contract.

Image Removed

...

After the contract is updated you should post the contract and refresh FBL3N to see if it's balanced and the issue is solved.

...

Image Removed

This is the most frequent reason why the suspense account might not be balanced.

This always happens with "open-end" contracts, as it is necessary to insert a "probable end date" during the contract creation.

NOTE: If you find any other type of issue that's unbalancing the account please analyze and solve and update this documentation if necessary.

...

       ii. Check of Retirement Flow (SAP transaction code FBL3N - PF1 G/L Accounts - 7560020000 & 6560020000 | WP1 G/L Accounts - 89854631 & 89854630)

...

This check should be performed along the month and in case it's not balanced it will need to be corrected until D-3.

Go to transaction FBL3N and insert the accounts and then select "All items" from the first day of the year until the last day of the month for which you are performing the check.

Image Removed

Retirement Flow accounts might not be balanced if a RE-FX contract presents a Special Flow in the valuation of the contract.

In that case it is necessary to analyze and correct the contract.

NOTE: If you find any issue that's not recurrent and unbalancing the account please analyze and solve and update this documentation if necessary.

...

       iii. Check of Postings Without CO Object (SAP code transaction FBL3N - PF1 G/L Account 6100000001 | WP1 G/L Account 98300160)

The RENTING-MOVABLE ASSETS account must always be balanced. 

This check should be performed along the month and in case it's not balanced it will need to be corrected until D-3.

Go to transaction FBL3N and select the variant "IFRS16 CO OBJ", then select "All items" from the first day of the year until the last day of the month for which you are performing the check.

...

There shouldn't exist postings without CO object so these accounts with the selections of theshould be balanced.

If it's not balanced it's necessary to analyze and correct the postings.

NOTE: If you find any issue or error that is allowing postings without CO object, you should report to CO and ID process experts in order to check this situation with IS.

...

       iv. Check of BW table (SAP code transaction SE16 - PF1: Table name = Z1F_CAPEX_OI | WP1: Table name = ZWFAT58001)

Go to transaction SE16 and select the table according to the system you are in.

...

Image Removed

If you perform this check and the table above doesn't appear in the transaction, you should report this situation to the Process Expert and the Process Coordinator.

       v. Account Clearing (SAP code transaction F-03)

              1. Clearing of Suspense Account (PF1: 5112100020 | WP1: 56030110)

In transaction F-03 for the account selection1 insert the correspondent G/L account and the fill in the other fields (Company Code, Clearing Date, Period and Currency) accordinglly to the data.

Image Removed

...

Image Removed

If the total of "Not Assigned" is zero, you can save the clearing (CTRL+S) or select icon "save"Image Removed to process the open items.

In case the total of  "Not assigned" is different from 0, it means that some contracts may have a payment in advance so the following month has been posted already and this makes the suspense account not balanced.

Image Removed

...

Table of Contents
maxLevel3

 

1 - Objective and Scope

 

1.1. Objective of these operations

The purpose of these tasks is to ensure that all necessary checks are performed in order to guarantee the monthly IFRS 16 closure process.

Please be aware that these checks should be performed between D-5 and D-2.

1.2. Scope

This procedure is applied to all WW companies under IFRS 16.

 

2. Definitions

 

See Finance Glossary;

 

 

3. Tasks description

 

Pre-Closure Activities need to be performed during D-5 to D1

 

3.1. D-5

 

3.1.1. RERAPP + RECEEP

 

Go to SAP transaction F-03 and clear accounts 5112100020 for PF2 and 56030110 for WP2, for the companies that are possible.

 

Image Added

 

Image Added

 

Run SAP transaction RERAPP in Simulation mode to check if any errors appear. The month we should run is the month we are currently in (therefore the month we are pre-closing)

If no error appears, run in update run mode.

 

 Image Added

 

Image Added

 

Run SAP transaction RECEEP in Simulation mode to check if any errors appear. The month we should run is the month we are currently in (therefore the month we are pre-closing)

If no error appears, run in update run mode.

 

 Image Added

 

Image Added

 

 

Go to SAP transaction FBL3N and open items for accounts 5112100020 (PF2) and 56030110 (WP2), run and do a subtotal by company code and assignment.

 

Image Added

 

Image Added

 

 

 

Example 1:

In February 2025, we have the following company codes to analyze:

Image Added

 

Opening company code 5978, we find that contract 400079 only has posted S5, so it's missing the S4 posting.

 

Image Added

 

 

We need to re run RERAPP for this specific contract to see if it solves it.

 

 Image Added

 

Image Added

 

Apparently, looks like it was solved but we have an error log:

Image Added

 

To solve it, open the contract in transaction RECN and change the user to your user. After that, re-run RERAPP.

 

 

Image AddedImage Added

 

Check if the open items are zero now and if so, go to F-03 and clear the account for the company.

 

 

Example 2:

Opening company code 5835, we find that contract 400138 only has posted two S4, so it's missing two S5 postings.

Image Added

 

First, we run RECEEP to see if it gets fixed.

 

 Image Added

 

This means, there is nothing to run, so we need to analyze the contract itself

This contract is an unlimited contract that is not updated on RECN because as you can see, the valuation ended in 2024.

 

 Image Added

 

Image Added

 

Go check on Convergence if we have the information that we need to update the contract. 

In this case, we’ll create a new valuation until 30.11.2025

 

 Image Added

 

This specific contract is also cleared.

 

Image Added

 

 

3.1.2. Technical Accounts are 0?

 

Open technical accounts 1260000999 and A260000999 for PF2, for WP2 23500999, 82350099 and 82350999 in SAP transaction FBL3N, using the open items of the last day of the past month (for example, if the closing is February 28.02, use 31.01 for the check).

If the total balance is 0, the check is OK. If it has balance, there is need to check what movement happened or what was missing during the period.

 

 Image Added

 

 Image Added

 

 

 

3.1.3. Lease Debt F20 Check

 

Run the FBL3N for accounts 5102100010 (PF2) and 16830100 (WP2) for all items of the current year, filtering the flow F20.

All the Texts must be only “Asset clearing IFRS”. 

If any other texts or descriptions appear, the entry must be checked and corrected.

 

 Image Added

 

 

3.1.4. Check of Suspense Account

 

(SAP transaction code FBL3N - PF2: 5112100020 | WP2: 56030110)

The Suspense Account must always be balanced (the only exception when it's acceptable to not be balanced it is when a contract has a "payment in advance" rent posted).

This check should be performed along the month and in case it's not balanced it will need to be corrected until D-3.

Go to transaction FBL3N and insert the account and the company code, then select "Open items" at the last day of the month for which you are performing the check.


Image Added


In the following case we can see that Company 4056 is balanced.


Image Added


Company 0005 instead is not balanced.


Image Added


If you open the line items you can see in detail which are the contracts that aren't balanced.


Image Added


In this situation as you can see contracts 0005/200000 and 0005/200002 have issues.

For contract 0005/200000 the amount is only in the column "Amount in local currency". This means that Suspense Account for this contract is actually balanced (the column "Amount in document currency" is 0,00), but the currency of this specific contract (GBP) differs from the currency of the company (EUR) and in this situation the error is due to different exchange rates in the system.

For contract 0005/200002 the difference is due to the presence of a "probable end date" in the valuation parameters of the contract, which is limiting the calculation of the valuation part of the contract.


Image Added


To solve this situation you need to confirm if the contract in fact will be extended, and then create a new time slot in the valuation which will consider the term extension with the correct interest rate.

After the contract is updated you should post the contract and refresh FBL3N to see if it's balanced and the issue is solved.


Image Added

Image Added


This is the most frequent reason why the suspense account might not be balanced.

This always happens with "open-end" contracts, as it is necessary to insert a "probable end date" during the contract creation.

 

NOTE: If you find any other type of issue that's unbalancing the account please analyze and solve and update this documentation if necessary.

 

Also, might solve RERAPP if the S4 (condition) document is missing, or RECEEP if the S5 (valuation) document is missing.

ATTENTION: For Germany only, enter contract type "LA"

 

3.2. D-2

 

3.2.1. Check of Retirement Flow

 

Goal: Check if the sum is 0. This check is performed to verify if there is any special flow in the contracts.

PF2 G/L Accounts 

7560020000

6560020000

G560020000

F560020000

 

WP2 G/L Accounts

98546300

98546310

89854631

89854631 

 

Go to FBL3N: run for all companies, all items from the beginning of the year until the last day of the current month

If the balance is zero, it’s all ok.


The Retirement Flow Accounts must always be balanced.

This check should be performed along the month and in case it's not balanced it will need to be corrected until D-3.

Go to transaction FBL3N and insert the accounts and then select "All items" from the first day of the year until the last day of the month for which you are performing the check.


Image Added


Retirement Flow accounts might not be balanced if a RE-FX contract presents a Special Flow in the valuation of the contract.

In that case it is necessary to analyze and correct the contract.

NOTE: If you find any issue that's not recurrent and unbalancing the account please analyze and solve and update this documentation if necessary.

 

Note that, if we have amounts and they are from DTO or Sublease, it is ok to have balance, if not, needs to be analyzed and corrected.

 

3.2.2. Check of Postings Without CO Object

 

The goal is to check if the balance is zero. This check helps us confirm that nothing is posted without cost center

Go to FBL3N, and with the variant, run the transaction for all companies and the whole year. The balance must be zero

PF2 G/L ACCOUNT 6100000001 - VARIANT IFRS16 CO OBJ

WP2 G/L ACCOUNT 98300160 - VARIANT IFRS16 CO OBJ

 

The RENTING-MOVABLE ASSETS account must always be balanced. 

This check should be performed along the month and in case it's not balanced it will need to be corrected until D-3.

Go to transaction FBL3N and select the variant "IFRS16 CO OBJ", then select "All items" from the first day of the year until the last day of the month for which you are performing the check.


Image Added


Image Added


There shouldn't exist postings without CO object so these accounts with the selections of these should be balanced.

If it's not balanced it's necessary to analyze and correct the postings.

 

NOTE: If you find any issue or error that is allowing postings without CO object, you should report to CO and ID process experts in order to check this situation with IS.


 

3.2.3. Check of OI table

 

(SAP code transaction SE16 - PF2: Table name = Z1F_CAPEX_OI | WP2: Table name = ZWFAT58001)

This table is used for vendor OI reclassification. Source : data from WBP

Go to transaction SE16 and select the table according to the system you are in.


Image Added


Click enter and insert as Key date the last day of the month of closure and "Execute".


Image Added


The following tab will appear:


Image Added

If you perform this check and the table above doesn't appear in the transaction, you should report this situation to the Process Expert and the Process Coordinator.


 

 

3.2.4. Clearing of Suspense Account (PF2: 5112100020 | WP2: 56030110)

 

The goal is to clear the suspense account for both systems. This account is a mirror between Lease Reconciliation Account and Long-Term Debt account.

We must clear all the movements including the ones with 0 balance for the closing month and months prior, except postings for advance rents


In transaction F-03 for the account selection1 insert the correspondent G/L account and the fill in the other fields (Company Code, Clearing Date, Period and Currency) accordingly to the data.


Image Added


Select "Process Open Items" and the following tab will appear.


Image Added

If the total of "Not Assigned" is zero, you can save the clearing (CTRL+S) or select icon "save"Image Added to process the open items.

In case the total of  "Not assigned" is different from 0, it means that some contracts may have a payment in advance so the following month has been posted already and this makes the suspense account not balanced.


Image Added


In order to clear the open items, detect the RE-FX contracts with payment in advance. Normally a contract, in F-03, should only have 2 lines posted (one with document type S4 and other with document type S5), so if we have 3 lines for a contract this is a contract with payment in advance (two lines with document type S4 and another line with document type S5).


Image Added


In order to clear the items you have to "unselect" the S4 document that is related to next month's rent and have as total of zero for the "Not assigned".

After the "Not assigned" amount is zero you can save the clearing in order to process the open items.


Image Added


The clearing document will be posted in the company selected

Image Added

To confirm that the clearing was performed correctly you should have no open items when you check the G/L account balance in FBL3N, unless the contract is an advance payment contract and you'll have as open item the posting for next month's rent.


Image Added


 

3.2.5. Clearing of Lease Liability (ST) Lease reclassifications Account (PF2: 5112100070 | WP2: 56030160)

 

Before you perform the clearing please check the balance of this G/L account in FBL3N (open items last day of the current month).


Image Added


In order to proceed with the clearing the balance has to be zero. 

If the balance is not zero, this means that when the transaction was performed in a previous closure one of two postings wasn't performed due to accounts in OB52 being closed.

In order to correct this situation we need to manually reverse, through FB03, the document that was posted, since the balance for this account should also be zero.

After all necessary corrections were done and G/L account is balanced (=0) in FBL3N you can proceed with the account clearing.

In transaction F-03 for the account selection1 insert the correspondent G/L account and the fill in the other fields (Company Code, Clearing Date, Period and Currency) accordingly to the data.


Image Added


Select "Process Open Items" and the following tab will appear.

Image Added

You can save the clearing (CTRL+S) or select icon "save"Image Added to process the open items.


3.2.6. Clearing of LT Lease Debt - ST Portion Account (PF2: 5112100010 | WP2: 56030100)

 

Before you perform

...

After the "Not assigned" amount is zero you can save the clearing in order toprocess the open items.

...

The clearing document will be posted in the company selected

Image Removed

To confirm that the clearing was performed correctly you should have no open itens when you check the G/L account balance in FBL3N, unless the contract is an advance payment contract and you'll have as open item the posting for next month's rent.

...

         2. Clearing of Lease Liability (ST) Lease reclassifications Account (PF1: 5112100070 | WP1: 56030160)

...

the clearing please check the balance of this G/L account in FBL3N (open items last day of the current month).

...


Image Added


In order to proceed with the clearing the balance has to be zero. 

If the balance is not zero, this means that when the transaction was performed in a previous closure one of two postings wasn't performed due to accounts in OB52 being closed.

In order to correct this situation we need to manually reverse, through FB03, the document that was posted, since the balance for this account should also be zero.

After all necessary corrections were done and G/L account is balanced (=0) in FBL3N you can proceed with the account clearing.

In transaction F-03 for the account selection1 insert the correspondent G/L account and the fill in the other fields (Company Code, Clearing Date, Period and Currency)

...

accordingly to the data.


Image Modified


Select "Process Open Items" and the following tab will appear

...

.


Image Added

You can save the clearing (CTRL+S) or select icon "save"Image Added to process the open items.


 

3.2.7. ASKB


The goal of this transaction is to transfer postings of assets from the group account to the local account.

Open the transaction, put the company code you want to run with all boxes filled as follows, and first run in test mode

  • Main asset number for PF2: 28*

Image Added

  • Main asset number for WP2: 4*

Image Added

 


Image Added


Insert one company at the time and run in "Test Run".

If there's nothing to post the screen will appear as following:


Image Added


Otherwise if there are assets to be posted it will appear as following:


Image Added


In this second case, go back to ASKB main page, remove the tick from "Test Run" and click on "Program" to "Execute in background" (or press F9).

 

Then, run "Immediate", check and save.


Image Added


In order to check the status of ASKB posting, go to transaction SM37 and "Execute" (or press F8) the transaction.


Image Added


Here you can see the status of the action performed.


Image Added


Going back to ASKB, check again on "Test run" if the same company has nothing else to post.

If everything is done correctly, it should appear as image below.


Image Added

 

 

 

3.2.8. AFAB

 

The transaction AFAB runs the depreciation of each company.


Image Added


Run in "Test Run" one company at a time, inserting the current fiscal year and the current month.

Always run AFAB in "Repeat" mode.

If there is nothing to post the following message will appear:


Image Added


If there are documents that need to be posted, please follow the same steps of ASKB.

Go back to AFAB main page, remove the tick from "Test Run" and click on "Program" to "Execute in background" (or press F9).

Then, run "Immediate", check and save.

To check the status of AFAB postings, go to transaction SM37 and "Execute" (or press F8) the transaction.

 

  • If there are postings we run for real after the test mode for the step in Background Immediate.
  • If we have error, check the log: 
    • If the log says that AFAB didn’t run, run Planned in test and check if need to be runned in real mode
    • If the log says that AFAB had an error in the run, we need to run in Restart


After running AFAB (if we had postings), we need to re-run ASKB to verify that nothing is pending


3.2.9.

Image Removed

You can save the clearing (CTRL+S) or select icon "save"Image Removed to process the open items.

         3. Clearing of LT Lease Debt - ST Portion Account (PF1: 5112100010 | WP1: 56030100)

Before you peform the clearing please check the balance of this G/L account in FBL3N (open items last day of the current month).

Image Removed

In order to proceed with the clearing the balance has to be zero. 

If the balance is not zero, this means that when the transaction was performed in a previous closure one of two postings wasn't performed due to accounts in OB52 being closed.

In order to correct this situation we need to manually reverse, through FB03, the document that was posted, since the balance for this account should also be zero.

After all necessary corrections were done and G/L account is balanced (=0) in FBL3N you can proceed with the account clearing.

In transaction F-03 for the account selection1 insert the correspondent G/L account and the fill in the other fields (Company Code, Clearing Date, Period and Currency) accordinglly to the data.

Image Removed

...

Image Removed

You can save the clearing (CTRL+S) or select icon "save"Image Removed to process the open items.

      vi. Check of ASKB 

Transaction ASKB posts the periodic asset from local to group account.

Image Removed

Insert one company at the time and run in "Test Run".

If there's nothing to post the screen will appear as following:

Image Removed

Otherwise if there are assets to be posted it will appear as following:

Image Removed

In this second case, go back to ASKB main page, remove the tick from "Test Run" and click on "Program" to "Execute in background" (or press F9).

Choose as "Output Device" LP01

Image Removed

Then, run "Immediate", check and save.

Image Removed

In order to check the status of ASKB posting, go to transaction SM37 and "Execute" (or press F8) the transaction.

Image Removed

Here you can see the status of the action performed.

Image Removed

Going back to ASKB, check again on "Test run" if the same company has nothing else to post.

If everything is done correctly, it should appear as image below.

Image Removed

      vii. Check of AFAB

The transaction AFAB runs the depreciation of each company.

Image Removed

Run in "Test Run" one company at a time, inserting the current fiscal year and the current month.

Always run AFAB in "Repeat" mode.

If there is nothing to post the following message will appear:

Image Removed

If there are documents that need to be posted, please follow the same steps of ASKB.

Go back to AFAB main page, remove the tick from "Test Run" and click on "Program" to "Execute in background" (or press F9).

Chose as "Output Device" LP01.

Then, run "Immediate", check and save.

To check the status of AFAB postings, go to transaction SM37 and "Execute" (or press F8) the transaction.

Going back to AFAB, check again on test run if the same company has nothing else to post.

...

Z1AANNUL


This transaction needs to be run twice a month, during pre-closure and closure periods.

During pre-closure, run Z1AANNUL only in test mode, to verify if the different accounts are balanced.

Fill Z1AANNUL with the required information – templates with pre-filled information can be found in the "Variant Directory of Program Z1AANNUL".

Use as charts of account COCA for

...

PF2 and Z001 for

...

WP2.

Run one company at the time, remembering to change the Country Key, based on the country identity of the company code (e.g.: company 0001 Belgium – country key BE; company 5835 Italy - country key IT, etc..).

To run Z1AANNUL during pre-closure in test run, remove the ticks on "CREATE BATCH-INPUT" and "SCMA".


Image Modified
Image Modified


Example of balanced account:


Image Modified


Unbalanced accounts:


Image Modified


For this last situation you should perform an analysis of the contract and the IFRS 16 accounts that can impact the Z1AANNUL posting. 

Please ensure that all necessary analysis and corrections are performed before D-1.

After this last task you may consider all closure activities as completed.

Panel
borderStylenone
Scope

Image Added


ERP

PF2 WP2


Frequency

Image Added