Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Excerpt
hiddentrue

Page_title

Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1
Process:SBS-P-DRTR-03-001 Inventory Valuation
Panel
bgColor#f2f2f2
borderWidth1

Responsibility area:SBS-P-DRTR-02-004 Internal Control Monitor  

  • Set up the revised calendar on September
  • In september : BW report posted to attest that 90% of the physiscal inventory has been done

  • In november : BW report posted to attest that 100% of the physical inventory has been done
  •  


     

    Former Controls

    IAC 04.13.00.01 / IAC 04.13.00.03 / IAC 04.13.00.04

    Panel
    borderColor#ffffff
    bgColor#ffffff
    titleColor#ffffff
    borderWidth1
    Risk

    All materials aren't counted   

    Objective

    FRA ensures that plant physical inventory procedure is updated every year, that physical count coverage comply with group rules and that auditors can supervise physical inventory organized during Q4


    Process description

    Physical inventory objective is to check the existence and ownership of inventories.

    Control description

    FRA

    1. updates plant  Validate and publishes local inventory procedure and control compliance prepared by PIM with group rules
    2. coordinates with Physical Inventory Manager (PIM) execution to reach defined targets at end of September and of December.
    3. (in accordance with the checklist)

    4. Validate and Publishes updated physical inventory planning prepared by PIM and taking into account that :t :

      -  90% of the physical inventory count ( in value of items) has to be done for the end of September (including external Storage
      - 100% of the physical inventory count ( in value of items) has to be done for the end of November (hard close) (including external Storage)*
      - if "full spot" physical inventory is done, then 100% until the end of December 

    5. Validate and post memorandum of inventory

    6. Ask for publishes last quarter physical inventory planning and require GCCO validation for exceptions to the rules defining the physical coverage rate for year end.
    Warning
    titleYearly key control recap
    spaces




    Control evidences

    IAC.02.03. Physical inventory

    • Physical count.xlsinventory count
    • Annual inventory planning
    • Memorandum of inventoryInventory reports
    • Mail of validation from GCCO
    Panel
    bgColor#f2f2f2
    titleColor#ffffff
    borderWidth1
    Scope
    Image Removed Image Removed
    WP2 & PF2
    Frequency

    Last working day of September and of DecemberNovember

    Control owner

    Finance Responsible Assigned (FRA)

    References

     

    Expand
    titleSAP Transactions

    Content by Label
    showLabelsfalse
    max30
    spacesSAPCost
    showSpacefalse
    sorttitle
    operatorAND
    cqllabel = "op_112" and space = "SAPCost"
    labelsmaintain_assessment_cycles

    Expand
    titleCosting rules
    Content by Label
    showLabelsfalse
    max30
    SAPCost
    showSpacefalse
    sorttitle
    operatorAND
    cqllabel = "op_112" and space = "CostFAQ"
    labelsmaintain_assessment_cycles
     

     



    Panel
    bgColor#f2f2f2
    titleColor#ffffff
    borderWidth1

      Guideline  

    Expand
    titleI download the last version of the checklist

    Download the file : 

    IAC.02.03. Physical count.xls

    There are 4 sheets in the file

    Image Removed

    inventory

     

    2 sheets must be filled:

    1. "Physical Inventory Check-List /FRA" in English or in French
      Image Removed
      Report
      Image Removed
     


    1. Inventory Report


    Expand
    titleI fill the checklist

    Start to fill :

    1. the site
    2. the controller's name
    3. the date
    4. the period

    Then answer "Yes" "No" or "N/A" to confirm that each control is performed .

     


    Warning

    If the answer is "No" or "N/A", it is compulsory to add a comment in column H

     
    It is possible to add a control evidence (attachment or a link)
    Image Removed


    title
    Expand
    titleI attach the procedure & sales force ticket
    Section

    1. Attach your validated procedure describing how items excluded from slow turn reserve are identified

     

    Column
    width30
    1. Choose "insert"
    2. Click on the "Object" button
    3. This window will open
    4. Select "Create from File"
    5. Add you file by clicking in "Browse"
    6. Select "Display as icon"
    7. Select OK
    Column
    width70

    2. Enter the sales force ticket that was used to submit the calculation to the service center.

     

    Expand

    I post the control evidence in e-Room

    Include Content
    pageCopy of I post the control evidence in e-Room


    Expand
    titleI save the control evidence send to the GCCO

    Approval emails sent by GCCOs must be saved in pdf.

     

     
    Expand
    titleI post the control evidence in Aodocs

    Include Content
    pageCostProc:I post my control evidence in Aodocs




    Viewtracker
    hidetrue