Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Excerpt
hiddentrue

Page_title

Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1
Process: Product Costing
Panel
bgColor#f2f2f2
borderWidth1

Responsibility area:Manage Perform product costing monthly closing

A costing run must be created for all company codes with production in WP1 WP2 starting on D-7

Image RemovedImage Added

operator



Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1
Scope
Image Removed Image Removed
 
Frequency
Image Removed
  
References
Expand
titleSAP Transactions
Content by Label
showLabelsfalse
max30
spacesSAPCost
showSpacefalse
sorttitle
AND
cqllabel = "op_021" and space = "SAPCost"
labelsmaintain_assessment_cycles
Expand
titleCosting rules

Content by Label
showLabelsfalse
max30
spacesSAPCost
showSpacefalse
sorttitle
operatorAND
cqllabel = "op_021" and space = "CostFAQ"
labelsmaintain_assessment_cycles

Attachments

N/A

Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1

xx   <<

Page_title
>> OP.023

 

 



Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1

  Guideline  

Expand
titleI create a costing run

Include Page
SAPCost:CK40N - Create a costing runSAPCost:
CK40N - Create a costing run

Expand
titleI calculate the standard cost estimate
 
Include Page
SAPCost:CK40N - Calculate the standard cost estimateSAPCost:
CK40N - Calculate the standard cost estimate
Expand
titleI analyse error and warning messages

Include Page
SAPCost:CK40N - Error & warning messages analysisSAPCost:
CK40N - Error & warning messages analysis

Expand
titleI inform the FRA

Inform the FRA that the cost estimate has been calculated

Expand
titleI am informed the cost estimate must be recalculated

I receive an email from the FRA that some changes have been performed and the cost estimate must be recalculated

Expand
titleI re calculte the cost estimate

Include Page
SAPCost:CK40N - Recalculate the standard cost estimatesSAPCost:
CK40N - Recalculate the standard cost estimates

Expand
titleI inform the FRA

Inform the FRA that the cost estimate has been calculated

Viewtracker
hidetrue