Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.



Excerpt
hiddentrue
page_title




Panel
Prerequisite
bgColor
WP1Image Removed WorldwideImage Removed
#f2f2f2
info
titleColor

Excerpt
applicable for an on demand request

#ffffff
borderWidth1
Process: Product Costing



Panel
bgColor#f2f2f2
borderWidth1

Responsibility area: Manage product costing



Image Added


Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1
Scope

 WW
Frequency

On Demand
References
 


Expand
title
SAP Transactions
Costing rules

Content by Label
showLabelsfalse
max30
spacesSAPCost
showSpacefalse
sorttitle
operatorAND
cqllabel = "op_017" and space = "

SAPCost

CostFAQ"
labelsmaintain_assessment_cycles

Attachments

Google Drive Live Link
urlhttps://docs.google.com/spreadsheets/d/1CWMIkUrniQx27HvmfRaAuOqXy0_GtgMC3cCpJ9hK0QE/edit?usp=drive_link



Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1

  <<

Page_title
>> 





Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1

  Guideline


  • WP2

 
Expand
titleI receive a request to create a costing & accounting view

I receive the form SBS-FRM-DRTR-02-004 Form of creation and modification for costing and accounting views Seamless Closing Project - RPA FICO Template V4.4


Material can be produced or purchased.The procurement type is available in view MRP2 (transaction MM03):

 

 Image Removed

In RCS the following materials purchased in one of these plants are managed centrally by Transversal Costing Team:

  • AV - Procurement from St Fons BET (plant 7822)
  • AW - Procurement from Ceriano (plant 7848)
  • AZ - Procurement from Gorzow (plant 0228)
  • BO - Procurement from Sao Bernardo (plant 0229)
  • BR - Procurement from Santo andr# (plant 7515)
  • C1 - Procurement from Ulsan - PI (plant 7603)
  • CX - Procurement from Seoul (plant 0232)
  • CY - Procurement from Mississauga (plant 0212)
Expand
titleIdentify I identify the type of Request
Expand
titlePurchased
Expand
titleProduced
Include Page
CostFAQ:Rules - Material Production VersionCostFAQ:Rules - Material Production Version
Expand
titleTrading
Include Page
CostFAQ:Rules - Material Do Not CostCostFAQ:Rules - Material Do Not Cost
material in the request
  1. It can be a material to be created in a trading plant (type = NDIR), in this case the material code won't be costed, you need to flag : "DO NOT COST"

    Expand
    titleI check the plant type

    Include Page
    MM03 - Find the plant type in WP1
    MM03 - Find the plant type in WP1


  2. If the material is not created in a trading plant, it can be purchased or produced.
    • It is produced when it has a procurement type " E " in the view MRP2: it can be a Semi-Finished product (valuation class = Z140) or a Finished product (valuation class = Z150). A production version is requested to create a produced material .
    • It is purchased when it has a procurement type "F" in the view MRP2: it can be a Raw Material (valuation class = Z100), a packaging (valuation class = Z110) or a trading goods (valuation class = Z130). Trading goods are usually produced in another plant of the group. In this case the controller can request the use of a SpecProcurem Costing (in view costing 2) to identify the origin of the product. A purchase price is requested to create a purchased material.


Image Added


I check the cost accounting views data & consistency and modify if needed
Expand
titleI check the consistency of data provided by the requester

Ensure that the form provided by requester is consistent with core rules.

Expand
title

Include Page
CostFAQ:Material - Master Data
CostFAQ:Material - Master Data


costing & accounting views
Expand
titleI create the cost estimate

I do the calculation of the cost estimate CK11N


After approval from FRA or the

requester, I do the marking and the release of the costing CK24


  • PF2

 
SAPCost:MM01 - I create the - GeneralSAPCost:MM01 - I create the costing & accounting view - Purchased

receive the form Seamless Closing Project - RPA FICO Template V4.4

Expand
Include Page
title
Purchased
I receive a request to create a costing & accounting view
SAPCost:MM01 -

I

create the costing & accounting view - General
Include Page
SAPCost:MM01 - I create the costing & accounting view - Purchased


 

Expand
titleI identify the type of material in the request
  1. It can be a material to be created in a trading plant (type = NDIR), in this case the material code won't be costed, you need to flag : "DO NOT COST"

    Expand
    title
Produced
  1. I check the plant type

    Include Page

SAPCost:MM01 - I create the costing & accounting view - GeneralSAPCost:MM01 - I create the costing & accounting view - General
Include Page
SAPCost:MM01 - I create the costing & accounting view - ProducedSAPCost:MM01 - I create the costing & accounting view - Produced

MM03 - Find the plant type in WP1
MM03 - Find the plant type in WP1


  • If the material is not created in a trading plant, it can be purchased or produced.
      • It is produced when it has a procurement type " E " in the view MRP2: it can be a Semi-Finished product (valuation class = Z140) or a Finished product (valuation class = Z150). A production version is requested to create a produced material .
      • It is purchased when it has a procurement type "F" in the view MRP2: it can be a Raw Material (valuation class = Z100), a packaging (valuation class = Z110) or a trading goods (valuation class = Z130). Trading goods are usually produced in another plant of the group. In this case the controller can request the use of a SpecProcurem Costing (in view costing 2) to identify the origin of the product. A purchase price is requested to create a purchased material.


    Image Added 


    Expand
    titleI inform check the person in charge of the product costing

    TBD

    Reference

     

    Next Operation: OP.020

     

    consistency of data provided by the requester

    Ensure that the form provided by requester is consistent with core rules.

    Include Page
    CostFAQ:Material - Master Data
    CostFAQ:Material - Master Data



    Expand
    titleI create the cost estimate

    I do the calculation of the cost estimate CK11N


    After approval from FRA or the requester, I do the marking and the release of the costing CK24

     


    Viewtracker
    hidetrue