Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Architecture - High Level Design (HLD)

Link.


Architecture - Low Level Design (LLD)

Link.


Architecture Data Flow


Google Drive Live Link
urlhttps://
docs
drive.google.com/
spreadsheets
file/d/
1gXHCRA03T5pH3wC--erjuT8DjyxIlhEZthyeCCNZXgI/edit#gid=1684414561
1274-2h5sL4Cyjsot-UgMYo03i2B8Q_hHzOv-Z3ixglo/view

DataPrep Flow

Schema showing the different STEPS of the application flow - with the data involved at each step

Image RemovedImage Added

Steps descriptions on Big Query

Describe the data and process involved at each step

SAP PF1

Description

This project has the data from SAP on QM, material document and Vendor master data tables loading into Industrial data ocean for all data in PF1 basing on the create and modification date. Then, the view on top will filter only Soda Ash data.

Note: Soda ash data has only in PF1, therefore, this project will load only from PF1. (It is not include WP1)

Tools

Talend

Access rights

To access to SAP, the Talend user RFC_TAL_PF1 is required

Source

pf1nonha.eua.solvay.com

Location

...

Table

...

Name of Table

...

Create Date

...

Modify Date

...

MCH1

...

Batches (if Batch Management Cross-Plant)

...

ERSDA

...

LAEDA

...

MCHA

...

Batches

...

ERSDA

...

LAEDA

...

QALS

...

Inspection lot record (header)

...

ERSTELDAT

...

AENDERDAT

...

QAMR

...

Characteristic results during inspection processing

...

ERSTELLDAT

...

AENDERDAT

...

QAMV

...

Characteristic specifications for inspection processing

(Average / Summary result)

...

ERSTELLDAT

...

AENDERDAT

...

QAVE

...

Inspection processing: Usage decision

...

VDATUM

...

VAEDATUM

...

MSEG

...

Document Segment: Material

...

CPUDT_MKPF

...

/BEV2/ED_AEDAT

...

LFA1

...

Vendor Master (General Section)

Format

The format of the source data

Destination

Location

DataOean GCP = prj-data-dm-industrial-dev

Product GCP = prj-data-sad-ebatch-ppd

To save the data into GCP Industrial Data Ocean, service account is required

Format

Same as the source

Sizing

Expected data volume for :

  • full process
  • incremental process

Assessment

How to validate that the generated output is valid

Scheduling

Is there an automatic schedule ? At what frequency ? What is the trigger ?

Timing

The average time expected for :

  • full process
  • incremental process

Criticality

High / Medium / Low

Logging

Logging location

DataSource 2

...

Children Display