Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Excerpt
hiddentrue

Page_title

Prerequisite

PF1Image Removed  WP1Image Removed WorldwideImage Removed
Info

Excerpt
OP.xxx applicability

Image Removed   
Monthly Closing

Business RolePerform Costing Monthly Closing

previous Operation(s):

Tip

Rules & Glossary: Costing - Rules Costing - Glossary Costing - SAP Operation

Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1
Process: Monthly costing and cost accounting closing  
Panel
bgColor#f2f2f2
borderWidth1

Responsibility area: Perform Costing Monthly Closing

Finance Site SBS:

SU MAC processes  the settlements of the three items below respecting the given time table:

  • PM-orders,
  • WBS-elements,
  • CO-orders, 

The processing includes dealing with the generated messages. SU MAC investigates the reasons for error messages, looks for modifications and corrections if possible, and restarts settlements if needed.

  • If an error blocks further processing and cannot be solved by SU MAC, the issue must be communicated to a contact in the area of plant maintenance.
  • After having received the solution and corrections, SU MAC acts by launching a second time the corresponding transactions.
  • Furthermore, SU MAC checks if the orders and the WBS treated in this procedure are completely settled.

Responsibilities of other functions:

  • The processing of PM-orders and WBS-elements for maintenance and fixed asset operations can lead to a result with technical errors.
  • In this case SU MAC must contact the local plant maintenance team, which is responsible for making the necessary corrections


Warning

Based on group core rules, all costs for maintenance and investment for fixed assets must be posted on special orders, created in the module of plant maintenance (PM). The cost of the orders are allocated to define maintenance and investment projects, created in the project system and defined in a hierarchy – work breakdown structure (WBS), where actual and budget figures can be compared. 



Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1
Scope

Image Added 

WP2
PF2

Frequency

Image Added  
References

Expand
titleSAP Transactions

Content by Label
showLabelsfalse
max30
spacesSAPCost
showSpacefalse
sorttitle
operatorAND
cqllabel = "op_005" and space = "CostProc"
labelsmaintain_assessment_cycles

Expand
titleCosting rules

Content by Label
showLabelsfalse
max30
spacesSAPCost
showSpacefalse
sorttitle
operatorAND
cqllabel = "op_005" and space = "CostProc"
labelsmaintain_assessment_cycles

Attachments

N/A

Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1

Page_title

Panel
bgColor#f2f2f2
titleColor#ffffff
borderWidth1

  Guideline  

Additional information

Guideline

Expand
titleI verify that the previous dependent steps have been performed
  All internal and PM orders should be settled as explained in I settle internal Orders and PM orders.
Expand
titleI perform the settlement

Include Page
SAPCost:CJ8G - WBS settlementSAPCost:
CJ8G - WBS settlement

Expand
titleI check the WBS are properly balanced
Expand
titleIn PF1 PF2 - use the report Z1K_SOLDE_WBS

Include Page
SAPCost:Z1K_SOLDE_WBS - Check that WBS are settled in PF1PF2SAPCost:
Z1K_SOLDE_WBS - Check that WBS are settled in PF1PF2

Expand
titleIn WP1 WP2 - use the report CJI3

 

Include Page
SAPCost:CJI3 - Check that WBS are settled in WP1WP2SAPCost:
CJI3 - Check that WBS are settled in WP1WP2

Expand
titleI check that the task is properly executed
 

Reference

 

Next Operation(s):

 

 

 If all WBS have been settled (all have zero balance) means that this procedure was successfully done.

viewtracker
Viewtracker
hidetrue