Issue

This document aims to evaluate the potential benefits and drawbacks of copying over Syensqo has close to 700 non-standard/custom units of measure (ie no SAP Standard ones) that have been created over time by Syensqo for use with Supplier integration, Ordering and Invoicing. Using non standard UoMs across the system will have impacts any integrations we have (eg between Ariba and S/4) as the UoMs have to be consistent across the entire landscape. 

Recommendation

Start with the Standard SAP / ISO Units of Measure and if absolutely necessary can consider adding additional ones but only if there is no other option.

Background & Context

In the past suppliers who did not send in a standard ISO or SAP Unit of Measure on an acknowledgement, or an invoice would get an error at the point of the data being entered (manually or by interface) on SAP.

This means that the transaction has to be checked and the Unit of Measure corrected by the supplier causing delays – or for the UoM to be added to the SAP UoM list as a custom unit and mapped to the existing standard to avoid recurrences.

The ERP Rebuild will mean a switch to SAP standard as a default.

This could result in going through the same UoM errors that were found in the past and having to correct the supplier or add the custom UoMs to SAP again.

Alternatively, the custom UoMs that have been used to bypass the issue in ECC could also be ported to S4 HANA (and Ariba) to avoid repeating the same errors.

However the use of non standard UoMs will require that any non standard UoM is replicated across all the systems in the landscape which will increase the cost and complexity of implementation, testing and maintenance. 

Assumptions

Not all suppliers adhere to the SAP standard or ISO Units of Measure and will send non standard ones on Acknowledgements or Invoices

Constraints

Impacts

However, it is important to consider potential drawbacks or challenges associated with adding in custom UoMs

  • UoMs and mapping will have to be carried over from the legacy system either manually or by some extraction process.
  • There is unlikely to be a standard SAP tool to do this copy over as the assumption with SAP is that the SAP and ISO UoMs are enough
  • If custom UoMs are present in the system then they could be used by Syensqo staff when creating transactions and master data, rather than using htem to map suppliers own UoMs to SAP standards. This could cause confusion downstream and so a review of how these are currently handled by the system should be carried out.
  • If all suppliers are no longer using non-SAP or non ISO UoMs then this may not be a live issue. To decide which ones to carry over a review of UoMs currently received on invoices would need to be be carried out.
  • Accepting nonstandard UoMs without proper and complete mapping can cause confusion in standard reports, blocking global analysis.
  • There may be legacy data to be transferred that uses these custom UoMs
  • UoM mismatches can occur in other streams – eg O2C where customers send in non standard UoMs causing similar issues to procurement.
  • If we create custom UoMs they will need to be maintained and validated across the entire system landscape to prevent any interfacing issues.

Business Rules

Any Custom UoM needs to be manually added to the new system and transported through as config. 

created in the system. 

  • These non-standard units of measure might cause data consistency issues as the definitions and the conversions are not standardised
  • These custom units of measure cause issues with integrations with other SAP modules or 3rd party systems that do not recognise these units


Recommendation

Based on the evaluation of the solution options, it is recommended to Use SAP / ISO Standard UoMs and conversions. This follows the Simplification/Standardisation approach of the project and ensures consistency and ease of integration across the landscape.

Any legacy data using non-standard UoMs will be mapped to standard UoMs during data migration.


Background & Context

Syensqo has close to 700 non-standard/custom units of measure created in the system. These units are historically created to cater to UoM's published by suppliers in various catalogs and also as a workaround to support certain business processes. Below are some of the issues faced currently 

  • Incorrect Conversion Factors - Missing or incorrect conversion factors between non-standard UoM's sometimes cause calculation errors e.g., in pricing, inventory etc.
  • Reporting and Analysis Errors - Non-standard UoM's create issues in reporting and analytics, leading to miscalculations or inaccurate data representation and aggregations
  • Incompatibility with SAP Standard Functions - Some SAP standard functions (e.g., MRP, ATP checks) do not fully support non-standard UoM's, or require additional customisation
  • User Confusion and Data Entry Mistakes - Non-standard UoM's sometimes lead to user confusion and result in data entry mistakes, especially when the same unit of measure is shared across multiple business units

Scale of Issue

Below table provides the statistics of non-standard UoM's in the system along with the usage of the same. 

SystemNon-Standard UoM'sPOs in past 5 years PO's with non-Standard UoM  %   UoM's used in affected POs  Materials changed in 10 Years  Materials with Non-Standard UoM  %  UoM's used in Material Masters 
QF2404           4,642,346184,5874%66                  613,651                         27,648*5%32
WQ2357           2,877,45082,0073%73                  567,413                            5,9951%51
*23,000 of the Material Masters in QF2 use just one non Std UoM - "NR - Number"

As a part of the above analysis, though there are ~700 non-standard UoM's that are existing in the system, there are only ~200 of them are currently active and being used in material master and Purchase Orders. 


Assumptions

  • Business processes are simplified and standardised and will not have any requirements for non-standard units of measure
  • Punch-out catalogs used by Syensqo will have standard ISO units of measure - In case of any exceptions, the unit of measure in the catalog will be mapped to a standard unit of measure in SAP


Constraints

N/A


Impacts

Data Migration

  • All dependent master data ex: Material master, BOM's etc.. will be updated with the standard unit of measure (All the quantities in these data objects ex: BOM Header quantity, MOQ in material master will be updated based on the conversion factors)
  • Stock quantities ex: Inventory, Stock in transit etc.. will adjusted based on the standard UoM before migrating to the new system
  • Prices ex: Info records, pricing conditions etc.. will be adjusted based on the standard UOM before migrating to the new system

Downstream systems

  • Any downstream system using the master data with non-standard UoM will be updated with new UoM and conversions. Mapping table will be used in case the UoM updates are not possible

Communication

  • Communication along with the mapping for non-standard to Standard UoM's will be sent to the relevant customers / Vendors / 3rd party systems 


Business Rules

All the master data and Business processes use only Standard SAP / ISO Units of Measure


Options considered

Following are the options considered.

Option 1: Use SAP / ISO Standard UoMs and conversions 

As a part of this option, all the master data and business processes use only the standard SAP/ISO unit of measures available in the system. Non-standard UoM's are not permitted to be created / used. Mapping activity will be carried out when the master data / transactional data is migrated from the legacy systems to the new S/4 HANA system.

Advantages:

  • UoM's and conversions are standardised across all the master data objects and business processes
  • No additional effort / customisations required to enable the standard SAP functionality
  • Uniform and Simplified reporting as the UoM's and conversion factors are standardised
  • Standard integrations without any additional data mappings with other modules of SAP, SAAS systems and any other 3rd party applications

Disadvantages:

  • One time data conversion effort to map the master and transactional data with standard UoM
  • One time data conversion / mapping of the non-standard UoM's in the downstream systems
  • Business processes that require creation of the non-standard UoM needs to be remediated

Option 2: Allow the use of non-standard UoM's

As a part of this option, the existing As-Is active non-standard UoM's are migrated to the new S/4 Hana system.

Advantages:

  • The existing processes can continue without any changes
  • No data migration/mapping effort except when there is de-duplication of master data

Disadvantages:

  • No standardisation of the UoM's across master and transactional data
  • Complex governance process to govern the non-standard UoM's and the conversion factors
  • User errors due to confusion and unfamiliarity of the non-standard UoM's
  • Customisations and data mappings required for integrations to any SAAS or 3rd party applications
  • Not all standard functionalities will be able to support the non-standard UoM's 
  • Potential incorrect reporting and aggregations 

Options considered

It would be painful to go through the same UoM errors that Syensqo has already solved by adding in custom UoMs.

However allowing non standard UoMs creates additional complexity and would need to be analysed across the system in order to see how big an issue it is and any downstream or reporting impacts.

Option 1: Use only SAP Standard UoMs, do not copy over any custom UoMs

The organisation uses only the standard SAP offering for SAP and ISO UoMs

Advantages:

  • No need to ensure that UoMs are correctly replicated across the landscape
  • Reduces the long-term maintenance burden as there are fewer custom elements to manage.
  • No effort required to develop a process to transfer the UoMs
  • No issue with non-standard UoMs impacting reports
  • No potential confusion due to unexpected downstream use of non-standard UoMs
  • Ensures that only standardized data is used in the new system, which can simplify future upgrades and integrations.

Disadvantages:

  • May hit the same issues that have already been solved when receiving transactions from suppliers
  • May invalidate legacy data that uses custom UoMs – e.g. Supplier Invoices and that would need to be altered
  • If plan is only to use SAP standards, then another way of correcting the suppliers who send in non-standard UoMs need to be used

Option 2: Carry over any active custom UoMs from As Is

Take over the current custom UoMs as they are, including any mapping

Advantages:

  • UoM Problems that are already solved / mapped do not re-occur
  • No issue with legacy data that use custom UoMs (if any)
  • No impact on suppliers that submit non standard UoMs

Disadvantages:

  • Need to replicate custom UoMs across landscape
  • Maintenance burden as custom UoMs will need to be supported and .
  • Any pre-existing issues (e.g. in reports due to unexpected UoMs) will also re-occur (if we dont correct the data)
  • May have an impact on other standard tools or integrations
  • Need to develop a process to transfer UoMs 
  • Risk of conflicts with standard UoMs and future upgrades or integrations with other systems.
  • Potential confusion due to unexpected downstream use of non-standard UoMs
  • Need to review data to see which UoMs are actually in use to avoid taking over defunct ones


Evaluation

Based on the evaluation of the solution options, it is recommended that the "Use only SAP Standard" approach is used as a starting position.Option 1: Use SAP / ISO Standard UoM's and conversions is recommended. This follows the Simplification/Standardisation approach of the project and minimises any maintenance burden going forward.

We can react to any UoM exceptions that occur in testing and data load and review any custom UoM that may be required (but only by exception)

Impact on 3rd Parties

Suppliers and Customers should not be using non standard ISO Codes going forward and should be pushed to do so

Impact on Legacy Data

Need to see how many custom UoMs are used in the legacy data and take action (remap etc) where needed. 


Criteria 

Option 1: Use SAP / ISO Standard UoM's and conversions

Option 2: Allow the use of non-standard UoM's

Alignment with project charter - Standardization and Simplification

(plus) Aligned with the Simplification and Standardisation principle

(minus) Not Aligned


Integration

(plus) Standard integration without any data mapping or customisations required for UoM's

(minus) Data mappings or customisations required for integrating with other SAP modules are 3rd party applications which doesn't support the non-standard UoM
Data Migration

(minus) One time effort to map the non-standard UoM's on the master and transactional data and migrate

(plus) No mapping required. However where there is de-duplication of materials with a standard and non-standard UoM, additional mapping effort is required
Reporting

(plus) Accurate and consistent reporting as the UoM and the conversion factors are standardised

(minus) Potential errors / requirement of mappings due to incorrect conversion factors or inconsistent use of non-standard UoM