CategoryBW MeasureGeneric descriptionTS MODEL

FOR SBS Team:

U99 - Export Dynasys Datafield

InventoryInitial inventoryStarting inventory for the current period (last dynamic refresh)Initial Inventory from SAPU99_O402_70- Initial inventory
InventoryAvailable Inventory as validatedEnd of month projected inventory validated during the S&OP exercise!End of period inventoryU99_O402_19 - Available Inventory as validated
InventoryActuals & Projected InventoryActuals and projected inventory!Closing InventoryU99_O402_88 - Actuals & projected inventory
InventoryPhysical inventory

End of month physical inventory (all types, intransit excluded)

/U99_O402_62 - Physical inventory
InventoryIn transit inventory from SAP (ETA)Stock in transit in SAP, between two sites, displayed in the received period (only current orders)Intransit InventoryU99_O402_14 - In Transit Inventory from SAP (ETA)
InventoryProjected Transit inventory ETAStock in transit between 2 sites, current orders AND Dynasys planned, displayed in the month not yet arrived ("on the road")Distribution in processU99_O402_76 - Projected Transit inventory ETA
InventoryProjected Inventory valueEnd of month projected inventory x CCRInventory valueU99_O402_64 - Projected Inventory value
InventoryAvailable inventory (Budget)End of month projected inventory validated during the Budget exercise/U99_O402_61 - Available inventory (Budget)
InventorySafety stock (SAP)Safety stock defined in SAP, MRP viewI300 Safety stock quantityU99_0402_85_Safety stock from SAP
InventorySafety stock v3Safety stock calculated in Dynasys, based on the V3 formula (projected requirements variability, service level, RLT)Safety stock calculated from the P&IU99_O402_71 - Safety stock v3
InventoryFinal safety stockSafety stock taken in the Planning (DIP)Safety stockU99_O402_30 - Final Safety Stock 
InventoryAnticipated InventoryAnticipated InventoryAnticipation InventoryU99_O402_106 - Anticipated Inventory
InventoryBlocked StockBlocked stock due to bad quality or some production irregularitiesBlocked stockU99_O402_9 - Blocked Stock
InventoryQM BatchBatch that is retained for quality inspection/U99_O402_103 - QM Batch
InventoryRestricted StockStock other than Unrestricted stock (Quality, Blocked, etc)Restricted stock from SAPU99_O402_104 - Restricted Stock
InventoryWorking StockFor Silica: In the past: addition of EoM Unrestricted inventory + EoM vendor inventory + EoM QM batch // In the current month + future = available inventory calculated by the tool
U99_O402_110 - Working Stock
InventoryWorking Stock as ValidatedFor Silica: Working stock validated during the last validation
U99_O402_111 - Working Stock as Validated
InventoryBudget Working StockFor Silica: Working stock validated during the last Budget exercice
U99_O402_99 - Budget Working Stock
InventoryN/ANot used
U99_O402_29 - Safety Stock in D.O.S
InventoryN/ANot used
U99_O402_20 - Planned Inventory coverage
SalesFinal forecast from DP (ETD)Final forecast defined in ETD in DPUnconstraint demand from DP FinalU99_O402_12 - Final Forecast ETD (from DP)
SalesFinal forecast from DP (ETA)Final forecast defined in ETA in DPUnconstraint demand from DP FinalU99_O402_66 - Final Forecast ETA (from DP)
SalesActual shipped and Final Demand  (ETD)Customer Demand taken by the DRP to calculate the requirements (after netting process)Sales requirement sourcedU99_O402_53 - Actual shipped and final demand (ETD)
SalesActual Shipments (to customers)Actuals shipped in ETD (Goods Issue date) filtered only to ShipTo destinationActual Shipped in ETD (with site dim)U99_O402_4 - Actual Sales
SalesBackorders in ETD

Orders in a past period in SAP with the dimension site 

only sourced for dip3 now 


Backorder Sales order book




dim site to be added
U99_O402_52 - BackOrders in ETD
SalesFirm Shipments ETDCurrent orders in ETD (customer orders, inter site orders)Open OrdersU99_O402_16 - Firm Shipments (ETD)
SalesOrderbook Orderbook = Firm shipments (open orders) + actuals 
Calculated in BW
SalesShipping requirements as validated (ETD)Requirements to ship to ShipTo (outcome from the DRP calculation), validated during the S&OP processDetailed  shipping requirementU99_0402_47 - Shipping requirements as validated (ETD)
SalesGross requirements
Gross requirementsU99_0402_48 - Gross Requirements
SalesShipping Plan as validated (ETD)Plan to ship to Customers (outcome from the DRP or DEPLOYMENT calculation), validated during the S&OP processDemandU99_0402_24 - Shipping plan as validated (ETD)
Sales
Plan to ship to customers (outcome from the DRP or DEPLOYMENT calculation), validated during the BUDGET processBudget from DP with main siteU99_O402_36 - Budget (Sales)
Sales
Plan to ship to customers (outcome from the DRP or DEPLOYMENT calculation), validated during the BFR process
U99_O402_38 - BFR (Sales)
Sales

[Orderbook / Budget Sales] * 100


Calculated in Qlikview
Sales

[Orderbook / BFR Sales] * 100


Calculated in Qlikview
Sales

[Shipping Requirement as validated (to Customers) / Actual Shipments (to Customers)] * 100


Calculated in Qlikview
Sales

[Shipping Plan as validated (to Customers) / Actual Shipments (to Customers)] * 100


Calculated in Qlikview
Sales

[Shipping Requirement as validated - Shipping Plan as validated (to Customers)]


Calculated in Qlikview
SalesShortage (ETA)Created when the demand is superior of the actual stock and production capacity => Final stock expected <0
U99_O402_97 - Shortage (ETA)
SalesDemand Review (ETA)For Silica: Budget Review validated in DP
U99_O402_107 - Demand Review (ETA)
SalesFinal Demand as validated 

U99_O402_112- Final Demand as validated ETD
SalesBFR Forecast from DP (ETD)BFR Forecast validated in DP for end of current year / the BFR forecast is a revision of the Budget done at the middle of the year until the end of the current year
U99_O402_115 - BFR Forecast from DP (ETD)
SalesBFR Forecast from DP (ETA)BFR Forecast validated in DP for end of current year / the BFR forecast is a revision of the Budget done at the middle of the year until the end of the current year
U99_O402_102 - BFR Forecast from DP (ETA)
SalesOrderbook in ETDFirm Shipment + Actuals shipped
U99_O402_93 - Order Book requested ETD
SalesBudget Final DemandFinal demand after netting calculated by the tool with the Budget Forecast from DP
U99_O402_98 - Budget Final Demand ETD
ShipmentsActuals shipments ETD (not available for the moment)Actuals shipped in ETD (Goods Issue date) to All destinationsActual shipped in ETD (with Site dim)U99_O402_5 - Actual Shipments (ETD)
ShipmentsShipping requirements ETDRequirements to ship to all destination (outcome from the DRP calculation)Detailed  shipping requirementU99_O402_77 - Shipping requirements ETD
ShipmentsShipping requirements as validatedRequirements to ship to all destination (outcome from the DRP calculation), validated during the S&OP processDetailed  shipping requirementU99_O402_47 - Shipping requirement as validated
ShipmentsFirm shipping requirements (ETD)
Firm shipping requirementsU99_O402_87 - Firm shipping requirements (ETD)
ShipmentsShipping Plan as validatedPlan to ship to all destination (outcome from the DRP or DEPLOYMENT calculation), validated during the S&OP processDemandU99_O402_24 - Shipping plan as validated
ShipmentsInternal flows ETDPlan to ship to other Intra GBU site (Inter Site), in shipping periodActual Shipped // Shipping PlanU99_O402_73 - Internal flows ETD
ShipmentsExternal flows detailed ETDPlan to ship to customers, in shipping period, with the detailed by destinationActual shipped in ETD (wo site dim)U99_O402_79 - External flows detailed ETD
ShipmentsExternal flows ETDPlan to ship to customers, in shipping period, WITHOUT the detailed by destination

Actual shipped in ETD (wo site dim)


U99_O402_74- External flows ETD
ShipmentsFirm Receipt ETACurrent orders in SAP (customers, Inter Sites), in delivery dateFirm shipment in shippingU99_O402_72 - Firm Receipt ETA
ShipmentsReceipt Plant ETAReceipt Plan by All destination, in the receipt month Receipt planU99_O402_78 - Receipt plan ETA
ShipmentsConstraint demand (ETA)Receipt Plan by customers, in the receipt month Projected resupply planU99_O402_11 - Constraint Demand (ETA)
ShipmentsBudget Shipping requirement

Shipping requirement calculated by the tool with the Budget Forecast from DP

/U99_O402_96 - Budget Shipping requirement ETD
ShipmentsBudget Shipping PlanShipping plan calculated by the tool with the Budget Forecast from DP/U99_O402_55 - Budget Shipping Plan ETD
Shipments
Actual Shipments / Total Planned Shipments *100
Calculated in Qlikview
Shipments
Not used
N/A
Shipments
Not used
N/A
Shipments
Not used
N/A
Shipments
Not used
N/A
ProductionActual ProductionActual production with no consideration of the resourceI402 - Actual production plan (INT)U99_O402_2 - Actual production
Production
Actual production with the consideration of the resource, filtered on specific product to follow, or Resource ("consolidated", "Reactor",... depending on GBU rule)I402 - Actual production planU99_O402_46 - Actual Production by resource (detail)
ProductionActual production by resourceActual production with the consideration of the resource, for all productNot applicableU99_O402_46 - Actual Production by resource (detail)
Production

Production planU99_O402_22 - Planned Production
ProductionProduction Plan by resource as validatedProduction Plan validated during the S&OP process (with the consideration of the resource)Not applicableU99_O402_45 - Production Plan by ressource 
ProductionProduction Plan as validatedProduction Plan validated during the S&OP process (no consideration of the resource)Not applicableU99_O402_50 - Planned production by resource as validated
Production Plan by resourceProduction Plan validated during the S&OP process (with the consideration of the resource AND specifically on "consolidated" Materials to be followed)Not applicableU99_O402_45 - Planned Production by resource (detail)
ProductionProduction capacityMaximum capacity by product / Resource in quantityNot applicableU99_O402_27 - Production capacity
ProductionProduction capacity (H)

U99_O402_114 - Production Capacity (H)
ProductionAvailable capacityCapacity by resource per period (opening days x hours per day)Not applicableU99_O402_08 - Available capacity
ProductionProduction requirements

Need to produce, considering the production constraints like batch size, minimum, ... 

Could be considered as the Unconstraint Production plan

Not applicableU99_O402_65 - Production requirements
ProductionInternal consumptionDependent requirements for a component consumed in a Parent productDependent requirementU99_O402_41 - Internal Consumption
ProductionLoad %Production Requirements / Available capacity x100Not applicableU99_O402_67 - Unconstrained Load %
ProductionScheduled %Production Plan / Available capacity x100Not applicableU99_O402_10 - Scheduled load %
ProductionBalanceDifference between demand (or unconstraint production) and Production planNot applicableU99_O402_68 - Balance
ProductionCumulative BalanceBalance cumulated over the entire horizonNot applicableU99_O402_69 - Cumulative Balance
ProductionBudget Production PlanProduction plan validated during the BUDGET processNot applicableU99_O402_35 - Budget production Plan
Production
Production plan validated during the BFR processNot applicableU99_0402_37 - BFR (Production)
Production
Actuals / Production plan validated during the last S&OP processNot applicableCalculated in Qlikview
Production
Number of Closed days  by periodNot applicableU99_O402_32 - Shutdown in nbr of days
ProductionPlanned ShutdownThe number of planned shutdown days / Resource
U99_O402_105 - Planned Shutdown
ProductionOverall Equipement Effectiveness (OEE)Identifies the percentage of manufacturing time that is truly productive.
U99_O402_108 -Overall Equipement Effectiveness (OEE)
Production Maximum Daily Capacity (MDC)Maximum Daily Capacity
U99_O402_109 -Maximum Daily Capacity (MDC)
Production Production Planned (H)

U99_O402_113 - Production Planned (H)
Production

Not applicableU99_O402_39 - Cheap Production
Production

Not applicableU99_O402_40 - Expensive Production
Production

Not applicable?
Production

Not applicableU99_O402_18 - Planned conbsumption - Brine negative qty
Production
Planned production / available capacity
Calculated in Qlikview
Costs
Shipment cost + Warehouse cost
Calculated in Qlikview
Costs
Shipments x Planned logistic costsDistribution cost transposedU99_O402_49 - Planned shipment costs (€)
Costs
Distribution cost (transportation)/U99_O402_21 - Planned logistic costs (€)
Costs
Warehouse costing Inventory valueU99_O402_34 - Warehouse costs
Costs
Production cost (CCR) x production planProduction costU99_O402_28 - Production Costs (€)
Costs
Not used
N/A
Costs
Not used
U99_O402_86 - Actual shipments costs (€)
P&ICycle StockCycle stock calculated for P&I exerciseNot applicableU99_O402_57 - Cycle Stock
P&ISHS RltSHS-Replenishment Lead time is calculated from a number of different lead times coming from SAP.
This SHS RLT is multilevel & multi-site
Not applicableU99_O402_59 - SHS RLT
P&IPast  and future demand
Not applicableU99_O402_63 - Past and Futur demand
Other KPIsPurchase plan (ETA)Receipt plan for products coming from external source (external supplier)Projected supply planU99_O402_23 - Purchased plan (ETA)
Other KPIs
Actuals received from external supplierFirm purchase (From SAP)U99_O402_3 - Actual purchased material
Other KPIs
Swap balanceNot applicableU99_O402_25 - Planned SWAP U.S
CategoryBW MeasureGeneric descriptionAROMA MODEL

FOR SBS Team:

U99 - Export Dynasys Datafield

InventoryInitial inventoryStarting inventory for the current period (last dynamic refresh)Initial InventoryU99_O402_70- Initial inventory
InventoryAvailable Inventory as validatedEnd of month projected inventory validated during the S&OP exerciseSOIP Ref - Total StockU99_O402_19 - Available Inventory as validated
InventoryActuals & Projected InventoryActuals and projected inventoryAvailable inventoryU99_O402_88 - Actuals & projected inventory
InventoryPhysical inventory

End of month physical inventory (all types, intransit excluded)

Total physical inventoryU99_O402_62 - Physical inventory
InventoryIn transit inventory from SAP (ETA)Stock in transit in SAP, between two sites, displayed in the received period (only current orders)SOIP Ref - Intransit InventoryU99_O402_14 - In Transit Inventory from SAP (ETA)
InventoryProjected Transit inventory ETAStock in transit between 2 sites, current orders AND Dynasys planned, displayed in the month not yet arrived ("on the road")Total Distribution in processU99_O402_76 - Projected Transit inventory ETA
InventoryProjected Inventory valueEnd of month projected inventory x CCRInventory valueU99_O402_64 - Projected Inventory value
InventoryAvailable inventory (Budget)End of month projected inventory validated during the Budget exerciseBudget- Available InventoryU99_O402_61 - Available inventory (Budget)
InventorySafety stock (SAP)Safety stock defined in SAP, MRP viewI300 Safety stock quantityU99_0402_85_Safety stock from SAP
InventorySafety stock v3Safety stock calculated in Dynasys, based on the V3 formula (projected requirements variability, service level, RLT)Safety stock SCE formula V3 (1)U99_O402_71 - Safety stock v3
InventoryFinal safety stockSafety stock taken in the Planning (DIP)Final safety stockU99_O402_30 - Final Safety Stock 
InventoryAnticipated InventoryAnticipated InventoryAnticipation InventoryU99_O402_106 - Anticipated Inventory
InventoryBlocked StockBlocked stock due to bad quality or some production irregularitiesBlocked stockU99_O402_9 - Blocked Stock
InventoryQM BatchBatch that is retained for quality inspectionQM batch from SAPU99_O402_103 - QM Batch
InventoryRestricted StockStock other than Unrestricted stock (Quality, Blocked, etc)Restricted stock from SAPU99_O402_104 - Restricted Stock
InventoryWorking StockFor Silica: In the past: addition of EoM Unrestricted inventory + EoM vendor inventory + EoM QM batch // In the current month + future = available inventory calculated by the tool
U99_O402_110 - Working Stock
InventoryWorking Stock as ValidatedFor Silica: Working stock validated during the last validation
U99_O402_111 - Working Stock as Validated
InventoryBudget Working StockFor Silica: Working stock validated during the last Budget exercice
U99_O402_99 - Budget Working Stock
InventoryN/ANot used
U99_O402_29 - Safety Stock in D.O.S
InventoryN/ANot used
U99_O402_20 - Planned Inventory coverage
SalesFinal forecast from DP (ETD)Final forecast defined in ETD in DPUnconstraint demand from DPU99_O402_12 - Final Forecast ETD (from DP)
SalesFinal forecast from DP (ETA)Final forecast defined in ETA in DP/U99_O402_66 - Final Forecast ETA (from DP)
SalesActual shipped and Final Demand  (ETD)Customer Demand taken by the DRP to calculate the requirements (after netting process)Actuals / Shipping Requirements (SKU ship to)U99_O402_53 - Actual shipped and final demand (ETD)
SalesActual Shipments (to customers)Actuals shipped in ETD (Goods Issue date) filtered only to ShipTo destinationActual Shipped in ETD (with Site dim)U99_O402_4 - Actual Sales
SalesBackorders in ETD

Orders in a past period in SAP with the dimension site 

only sourced for dip3 now 


Backorder Sales order book




dim site to be added
U99_O402_52 - BackOrders in ETD
SalesFirm Shipments ETDCurrent orders in ETD (customer orders, inter site orders)Order book in ETDU99_O402_16 - Firm Shipments (ETD)
SalesOrderbook Orderbook = Firm shipments (open orders) + actuals 
Calculated in BW
SalesShipping requirements as validated (ETD)Requirements to ship to ShipTo (outcome from the DRP calculation), validated during the S&OP processSOIP Ref -Shipping RequirementsU99_0402_47 - Shipping requirements as validated (ETD)
SalesGross requirements
Gross requirementsU99_0402_48 - Gross Requirements
SalesShipping Plan as validated (ETD)Plan to ship to Customers (outcome from the DRP or DEPLOYMENT calculation), validated during the S&OP processSOIP Ref -Shipping PlanU99_0402_24 - Shipping plan as validated (ETD)
Sales
Plan to ship to customers (outcome from the DRP or DEPLOYMENT calculation), validated during the BUDGET processBudget-Sales (avec site)U99_O402_36 - Budget (Sales)
Sales
Plan to ship to customers (outcome from the DRP or DEPLOYMENT calculation), validated during the BFR processBFR06 - Sales (avec site)U99_O402_38 - BFR (Sales)
Sales

[Orderbook / Budget Sales] * 100


Calculated in Qlikview
Sales

[Orderbook / BFR Sales] * 100


Calculated in Qlikview
Sales

[Shipping Requirement as validated (to Customers) / Actual Shipments (to Customers)] * 100


Calculated in Qlikview
Sales

[Shipping Plan as validated (to Customers) / Actual Shipments (to Customers)] * 100


Calculated in Qlikview
Sales

[Shipping Requirement as validated - Shipping Plan as validated (to Customers)]


Calculated in Qlikview
SalesShortage (ETA)Created when the demand is superior of the actual stock and production capacity => Final stock expected <0
U99_O402_97 - Shortage (ETA)
SalesDemand Review (ETA)For Silica: Budget Review validated in DP
U99_O402_107 - Demand Review (ETA)
SalesFinal Demand as validated 

U99_O402_112- Final Demand as validated ETD
SalesBFR Forecast from DP (ETD)BFR Forecast validated in DP for end of current year / the BFR forecast is a revision of the Budget done at the middle of the year until the end of the current year
U99_O402_115 - BFR Forecast from DP (ETD)
SalesBFR Forecast from DP (ETA)BFR Forecast validated in DP for end of current year / the BFR forecast is a revision of the Budget done at the middle of the year until the end of the current year
U99_O402_102 - BFR Forecast from DP (ETA)
SalesOrderbook in ETDFirm Shipment + Actuals shipped
U99_O402_93 - Order Book requested ETD
SalesBudget Final DemandFinal demand after netting calculated by the tool with the Budget Forecast from DP
U99_O402_98 - Budget Final Demand ETD
ShipmentsActuals shipments ETD (not available for the moment)Actuals shipped in ETD (Goods Issue date) to All destinationsActual shipped in ETD (with Site dim)U99_O402_5 - Actual Shipments (ETD)
ShipmentsShipping requirements ETDRequirements to ship to all destination (outcome from the DRP calculation)Detailed shipping requirementU99_O402_77 - Shipping requirements ETD
ShipmentsShipping requirements as validatedRequirements to ship to all destination (outcome from the DRP calculation), validated during the S&OP processSOIP Ref - Shipping RequirementsU99_O402_47 - Shipping requirement as validated
ShipmentsFirm shipping requirements (ETD)
Firm shipping requirementsU99_O402_87 - Firm shipping requirements (ETD)
ShipmentsShipping Plan as validatedPlan to ship to all destination (outcome from the DRP or DEPLOYMENT calculation), validated during the S&OP processSOIP Ref - Shipping PlanU99_O402_24 - Shipping plan as validated
ShipmentsInternal flows ETDPlan to ship to other Intra GBU site (Inter Site), in shipping periodActual Shipped // Shipping PlanU99_O402_73 - Internal flows ETD
ShipmentsExternal flows detailed ETDPlan to ship to customers, in shipping period, with the detailed by destinationExternal Sales ETDU99_O402_79 - External flows detailed ETD
ShipmentsExternal flows ETDPlan to ship to customers, in shipping period, WITHOUT the detailed by destination

External sales ETD


U99_O402_74- External flows ETD
ShipmentsFirm Receipt ETACurrent orders in SAP (customers, Inter Sites), in delivery dateFirm shipment in receiptU99_O402_72 - Firm Receipt ETA
ShipmentsReceipt Plant ETAReceipt Plan by All destination, in the receipt month Receipt planU99_O402_78 - Receipt plan ETA
ShipmentsConstraint demand (ETA)Receipt Plan by customers, in the receipt month SOIP Ref - Receipt PlanU99_O402_11 - Constraint Demand (ETA)
ShipmentsBudget Shipping requirement

Shipping requirement calculated by the tool with the Budget Forecast from DP

/U99_O402_96 - Budget Shipping requirement ETD
ShipmentsBudget Shipping PlanShipping plan calculated by the tool with the Budget Forecast from DPBudget - Shipping PlanU99_O402_55 - Budget Shipping Plan ETD
Shipments
Actual Shipments / Total Planned Shipments *100
Calculated in Qlikview
Shipments
Not used
N/A
Shipments
Not used
N/A
Shipments
Not used
N/A
Shipments
Not used
N/A
ProductionActual ProductionActual production with no consideration of the resourceI402 - Actual production plan (INT)U99_O402_2 - Actual production
Production
Actual production with the consideration of the resource, filtered on specific product to follow, or Resource ("consolidated", "Reactor",... depending on GBU rule)I402 - Actual production planU99_O402_46 - Actual Production by resource (detail)
ProductionActual production by resourceActual production with the consideration of the resource, for all product
U99_O402_46 - Actual Production by resource (detail)
Production

Production plan TotalU99_O402_22 - Planned Production
ProductionProduction Plan by resource as validatedProduction Plan validated during the S&OP process (with the consideration of the resource)SOIP Ref - Plan by resource totalU99_O402_45 - Production Plan by ressource 
ProductionProduction Plan as validatedProduction Plan validated during the S&OP process (no consideration of the resource)SOIP Ref - Plan by resource totalU99_O402_50 - Planned production by resource as validated
Production Plan by resourceProduction Plan validated during the S&OP process (with the consideration of the resource AND specifically on "consolidated" Materials to be followed)SOIP Ref - Plan by resource totalU99_O402_45 - Planned Production by resource (detail)
ProductionProduction capacityMaximum capacity by product / Resource in quantityProduction at full capacity (by material) (wo inv control)U99_O402_27 - Production capacity
ProductionProduction capacity (H)

U99_O402_114 - Production Capacity (H)
ProductionAvailable capacityCapacity by resource per period (opening days x hours per day)Capacity unused by planU99_O402_08 - Available capacity
ProductionProduction requirements

Need to produce, considering the production constraints like batch size, minimum, ... 

Could be considered as the Unconstraint Production plan

Production requirementsU99_O402_65 - Production requirements
ProductionInternal consumptionDependent requirements for a component consumed in a Parent productSOIP Ref - Dependent requirementU99_O402_41 - Internal Consumption
ProductionLoad %Production Requirements / Available capacity x100/U99_O402_67 - Unconstrained Load %
ProductionScheduled %Production Plan / Available capacity x100Capacity used by planU99_O402_10 - Scheduled load %
ProductionBalanceDifference between demand (or unconstraint production) and Production plan/U99_O402_68 - Balance
ProductionCumulative BalanceBalance cumulated over the entire horizon/U99_O402_69 - Cumulative Balance
ProductionBudget Production PlanProduction plan validated during the BUDGET processBudget - Plan by Resource totalU99_O402_35 - Budget production Plan
Production
Production plan validated during the BFR processBFR (Production) - ReferenceU99_0402_37 - BFR (Production)
Production
Actuals / Production plan validated during the last S&OP process
Calculated in Qlikview
Production
Number of Closed days  by periodTotal closed daysU99_O402_32 - Shutdown in nbr of days
ProductionPlanned ShutdownThe number of planned shutdown days / Resource
U99_O402_105 - Planned Shutdown
ProductionOverall Equipement Effectiveness (OEE)Identifies the percentage of manufacturing time that is truly productive.
U99_O402_108 -Overall Equipement Effectiveness (OEE)
Production Maximum Daily Capacity (MDC)Maximum Daily Capacity
U99_O402_109 -Maximum Daily Capacity (MDC)
Production Production Planned (H)

U99_O402_113 - Production Planned (H)
Production

Not applicableU99_O402_39 - Cheap Production
Production

Not applicableU99_O402_40 - Expensive Production
Production

Not applicable?
Production

Not applicableU99_O402_18 - Planned conbsumption - Brine negative qty
Production
Planned production / available capacity
Calculated in Qlikview
Costs
Shipment cost + Warehouse cost
Calculated in Qlikview
Costs
Shipments x Planned logistic costs/U99_O402_49 - Planned shipment costs (€)
Costs
Distribution cost (transportation)/U99_O402_21 - Planned logistic costs (€)
Costs
Warehouse costing Warehouse costU99_O402_34 - Warehouse costs
Costs
Production cost (CCR) x production planTotal production costU99_O402_28 - Production Costs (€)
Costs
Not used
N/A
Costs
Not used
U99_O402_86 - Actual shipments costs (€)
P&ICycle StockCycle stock calculated for P&I exerciseNot applicableU99_O402_57 - Cycle Stock
P&ISHS RltSHS-Replenishment Lead time is calculated from a number of different lead times coming from SAP.
This SHS RLT is multilevel & multi-site
Not applicableU99_O402_59 - SHS RLT
P&IPast  and future demand
Not applicableU99_O402_63 - Past and Futur demand
Other KPIsPurchase plan (ETA)Receipt plan for products coming from external source (external supplier)/U99_O402_23 - Purchased plan (ETA)
Other KPIs
Actuals received from external supplierExternal purchase from SAPU99_O402_3 - Actual purchased material
Other KPIs
Swap balanceNot applicableU99_O402_25 - Planned SWAP U.S
CategoryBW MeasureGeneric descriptionNOVECARE MODEL

FOR SBS Team:

U99 - Export Dynasys Datafield

InventoryInitial inventoryStarting inventory for the current period (last dynamic refresh)Initial InventoryU99_O402_70- Initial inventory
InventoryAvailable Inventory as validatedEnd of month projected inventory validated during the S&OP exerciseM-1 // Total All StockU99_O402_19 - Available Inventory as validated
InventoryActuals & Projected InventoryActuals and projected inventoryProjected inventoryU99_O402_88 - Actuals & projected inventory
InventoryPhysical inventory

End of month physical inventory (all types, intransit excluded)

Physical inventoryU99_O402_62 - Physical inventory
InventoryIn transit inventory from SAP (ETA)Stock in transit in SAP, between two sites, displayed in the received period (only current orders)Transit inventory (sourced)U99_O402_14 - In Transit Inventory from SAP (ETA)
InventoryProjected Transit inventory ETAStock in transit between 2 sites, current orders AND Dynasys planned, displayed in the month not yet arrived ("on the road")Projected transit inventory NOVU99_O402_76 - Projected Transit inventory ETA
InventoryProjected Inventory valueEnd of month projected inventory x CCRProjected inventory value NOVU99_O402_64 - Projected Inventory value
InventoryAvailable inventory (Budget)End of month projected inventory validated during the Budget exerciseBudget- Projected InventoryU99_O402_61 - Available inventory (Budget)
InventorySafety stock (SAP)Safety stock defined in SAP, MRP viewI300 Safety stock quantityU99_0402_85_Safety stock from SAP
InventorySafety stock v3Safety stock calculated in Dynasys, based on the V3 formula (projected requirements variability, service level, RLT)N/A U99_O402_71 - Safety stock v3
InventoryFinal safety stockSafety stock taken in the Planning (DIP)Safety stockU99_O402_30 - Final Safety Stock 
InventoryAnticipated InventoryAnticipated InventoryAnticipation InventoryU99_O402_106 - Anticipated Inventory
InventoryBlocked StockBlocked stock due to bad quality or some production irregularitiesBlocked stock from SAPU99_O402_9 - Blocked Stock
InventoryQM BatchBatch that is retained for quality inspectionQM batch from SAPU99_O402_103 - QM Batch
InventoryRestricted StockStock other than Unrestricted stock (Quality, Blocked, etc)Restricted stock from SAPU99_O402_104 - Restricted Stock
InventoryWorking StockFor Silica: In the past: addition of EoM Unrestricted inventory + EoM vendor inventory + EoM QM batch // In the current month + future = available inventory calculated by the tool
U99_O402_110 - Working Stock
InventoryWorking Stock as ValidatedFor Silica: Working stock validated during the last validation
U99_O402_111 - Working Stock as Validated
InventoryBudget Working StockFor Silica: Working stock validated during the last Budget exercice
U99_O402_99 - Budget Working Stock
InventoryN/ANot used
U99_O402_29 - Safety Stock in D.O.S
InventoryN/ANot used
U99_O402_20 - Planned Inventory coverage
SalesFinal forecast from DP (ETD)Final forecast defined in ETD in DPForecast from DP (ETD)

(actuals for the past)
U99_O402_12 - Final Forecast ETD (from DP)
SalesFinal forecast from DP (ETA)Final forecast defined in ETA in DPUnconstraint demand from DPU99_O402_66 - Final Forecast ETA (from DP)
SalesActual shipped and Final Demand  (ETD)Customer Demand taken by the DRP to calculate the requirements (after netting process)

Actual Shipped ETD in the past / Shipping requirement (Independent requirement)

This include INTERNAL and EXTERNAL flows


U99_O402_53 - Actual shipped and final demand (ETD)
SalesBackorders in ETD

Orders in a past period in SAP with the dimension site 

only sourced for dip3 now 


BackOrders 

U99_O402_52 - BackOrders in ETD
Sales

Actual Shipments (to customers)


(Used to calculate orderbook ETD)

Actuals shipped in ETD (Goods Issue date) filtered only to ShipTo destinationActual Shipped ETD (SKU plant)U99_O402_4 - Actual Sales
Sales

Firm Shipments ETD


(Used to calculate orderbook ETD)

Current orders in ETD (customer orders, inter site orders)Firm shipment in shipping SAPU99_O402_16 - Firm Shipments (ETD)
SalesOrderbook ETDOrderbook = Firm shipments ETD + Actual Shipped ETD
Calculated in BW
SalesShipping requirements as validated (ETD)Requirements to ship to ShipTo (outcome from the DRP calculation), validated during the S&OP processS&OP Validated - Actual Shipped // Independent requierementU99_0402_47 - Shipping requirements as validated (ETD)
SalesGross requirements
Gross requirementsU99_0402_48 - Gross Requirements
SalesShipping Plan as validated (ETD)Plan to ship to Customers (outcome from the DRP or DEPLOYMENT calculation), validated during the S&OP processS&OP Validated - Actual Shipped // Independent requierementU99_0402_24 - Shipping plan as validated (ETD)
Sales
Plan to ship to customers (outcome from the DRP or DEPLOYMENT calculation), validated during the BUDGET processBudget  Final Demand  sourced (SKU transpo)U99_O402_36 - Budget (Sales)
Sales
Plan to ship to customers (outcome from the DRP or DEPLOYMENT calculation), validated during the BFR processN/AU99_O402_38 - BFR (Sales)
Sales

[Orderbook / Budget Sales] * 100


Calculated in Qlikview
Sales

[Orderbook / BFR Sales] * 100


Calculated in Qlikview
Sales

[Shipping Requirement as validated (to Customers) / Actual Shipments (to Customers)] * 100


Calculated in Qlikview
Sales

[Shipping Plan as validated (to Customers) / Actual Shipments (to Customers)] * 100


Calculated in Qlikview
Sales

[Shipping Requirement as validated - Shipping Plan as validated (to Customers)]


Calculated in Qlikview
SalesShortage (ETA)Created when the demand is superior of the actual stock and production capacity => Final stock expected <0
U99_O402_97 - Shortage (ETA)
SalesDemand Review (ETA)For Silica: Budget Review validated in DP
U99_O402_107 - Demand Review (ETA)
SalesFinal Demand as validated 
S&OP Validated -Final Demand ETD sourcedU99_O402_112- Final Demand as validated ETD
SalesBFR Forecast from DP (ETD)BFR Forecast validated in DP for end of current year / the BFR forecast is a revision of the Budget done at the middle of the year until the end of the current year
U99_O402_115 - BFR Forecast from DP (ETD)
SalesBFR Forecast from DP (ETA)BFR Forecast validated in DP for end of current year / the BFR forecast is a revision of the Budget done at the middle of the year until the end of the current year
U99_O402_102 - BFR Forecast from DP (ETA)
Sales

Orderbook

Firm Shipment (open orders) + actuals  


U99_O402_93 - Order Book requested ETD

SalesBudget Final DemandFinal demand after netting calculated by the tool with the Budget Forecast from DP
U99_O402_98 - Budget Final Demand ETD
ShipmentsActuals shipments ETD (not available for the moment)Actuals shipped in ETD (Goods Issue date) to All destinationsActual shipped ETD (SKU plant)U99_O402_5 - Actual Shipments (ETD)
ShipmentsShipping requirements ETDRequirements to ship to all destination (outcome from the DRP calculation)Detailed shipping requierementU99_O402_77 - Shipping requirements ETD
ShipmentsShipping requirements as validatedRequirements to ship to all destination (outcome from the DRP calculation), validated during the S&OP processS&OP Validated - Actual Shipped // Independent requierementU99_O402_47 - Shipping requirement as validated
ShipmentsFirm shipping requirements (ETD)
Firm shipping requirementU99_O402_87 - Firm shipping requirements (ETD)
ShipmentsShipping Plan as validatedPlan to ship to all destination (outcome from the DRP or DEPLOYMENT calculation), validated during the S&OP processS&OP Validated - Shipping plan (from May validation - past not archived)U99_O402_24 - Shipping plan as validated
ShipmentsInternal flows ETDPlan to ship to other Intra GBU site (Inter Site), in shipping periodActual Shipped // Independent  requierementU99_O402_73 - Internal flows ETD
ShipmentsExternal flows detailed ETDPlan to ship to customers, in shipping period, with the detailed by destinationActual Shipped // Independent  requierementU99_O402_79 - External flows detailed ETD
ShipmentsExternal flows ETDPlan to ship to customers, in shipping period, WITHOUT the detailed by destinationActual Shipped // Independent  requierementU99_O402_74- External flows ETD
ShipmentsFirm Receipt ETACurrent orders in SAP (customers, Inter Sites), in delivery dateFirm receipt (ETA) U99_O402_72 - Firm Receipt ETA
ShipmentsReceipt Plant ETAReceipt Plan by All destination, in the receipt month Inbound TransfersU99_O402_78 - Receipt plan ETA
ShipmentsConstraint demand (ETA)Receipt Plan by customers, in the receipt month S&OP validated - Actual receipt // Proposed receipt planU99_O402_11 - Constraint Demand (ETA)
ShipmentsBudget Shipping requirement

Shipping requirement calculated by the tool with the Budget Forecast from DP

Budget - Independent requirementU99_O402_96 - Budget Shipping requirement ETD
ShipmentsBudget Shipping PlanShipping plan calculated by the tool with the Budget Forecast from DPBudget - Independent requirementU99_O402_55 - Budget Shipping Plan ETD
Shipments
Actual Shipments / Total Planned Shipments *100
Calculated in Qlikview
Shipments
Not used
N/A
Shipments
Not used
N/A
Shipments
Not used
N/A
Shipments
Not used
N/A
ProductionActual ProductionActual production with no consideration of the resourceActuals ProductionU99_O402_2 - Actual production
Production
Actual production with the consideration of the resource, filtered on specific product to follow, or Resource ("consolidated", "Reactor",... depending on GBU rule)Actuals / Plan by resource U99_O402_46 - Actual Production by resource (detail)
ProductionActual production by resourceActual production with the consideration of the resource, for all productActuals / Plan by resource U99_O402_46 - Actual Production by resource (detail)
Production

 Planned ProductionU99_O402_22 - Planned Production
ProductionProduction Plan by resource as validatedProduction Plan validated during the S&OP process (with the consideration of the resource)plan by resourceU99_O402_45 - Production Plan by ressource 
ProductionProduction Plan as validatedProduction Plan validated during the S&OP process (no consideration of the resource)

plan by resource

U99_O402_50 - Planned production by resource as validated
Production Plan by resourceProduction Plan validated during the S&OP process (with the consideration of the resource AND specifically on "consolidated" Materials to be followed)

 plan by resource

U99_O402_45 - Planned Production by resource (detail)
ProductionProduction capacityMaximum capacity by product / Resource in quantityAvailable capacity in QTYU99_O402_27 - Production capacity
ProductionProduction capacity (H)

U99_O402_114 - Production Capacity (H)
ProductionAvailable capacityCapacity by resource per period (opening days x hours per day)Available capacity // HRU99_O402_08 - Available capacity
ProductionProduction requirements

Need to produce, considering the production constraints like batch size, minimum, ... 

Could be considered as the Unconstraint Production plan

Production requierements // QTYU99_O402_65 - Production requirements
ProductionInternal consumptionDependent requirements for a component consumed in a Parent productS&OP Validated - Actual Consumption // Dependent requirementU99_O402_41 - Internal Consumption
ProductionLoad %Production Requirements / Available capacity x100Load%U99_O402_67 - Unconstrained Load %
ProductionScheduled %Production Plan / Available capacity x100Scheduled %U99_O402_10 - Scheduled load %
ProductionBalanceDifference between demand (or unconstraint production) and Production planBalanceU99_O402_68 - Balance
ProductionCumulative BalanceBalance cumulated over the entire horizonCumulative balanceU99_O402_69 - Cumulative Balance
ProductionBudget Production PlanProduction plan validated during the BUDGET processBudget - productionU99_O402_35 - Budget production Plan
Production
Production plan validated during the BFR processN/AU99_0402_37 - BFR (Production)
Production
Actuals / Production plan validated during the last S&OP process
Calculated in Qlikview
Production
Number of Closed days  by periodClosed days totalU99_O402_32 - Shutdown in nbr of days
ProductionPlanned ShutdownThe number of planned shutdown days / Resource
U99_O402_105 - Planned Shutdown
ProductionOverall Equipement Effectiveness (OEE)Identifies the percentage of manufacturing time that is truly productive.
U99_O402_108 -Overall Equipement Effectiveness (OEE)
Production Maximum Daily Capacity (MDC)Maximum Daily Capacity
U99_O402_109 -Maximum Daily Capacity (MDC)
Production Production Planned (H)

U99_O402_113 - Production Planned (H)
Production

Not applicableU99_O402_39 - Cheap Production
Production

Not applicableU99_O402_40 - Expensive Production
Production

Not applicable?
Production

Not applicableU99_O402_18 - Planned conbsumption - Brine negative qty
Production
Planned production / available capacity
Calculated in Qlikview
Costs
Shipment cost + Warehouse cost
Calculated in Qlikview
Costs
Shipments x Planned logistic costs/U99_O402_49 - Planned shipment costs (€)
Costs
Distribution cost (transportation)/U99_O402_21 - Planned logistic costs (€)
Costs
Warehouse costing /U99_O402_34 - Warehouse costs
Costs
Production cost (CCR) x production plan/U99_O402_28 - Production Costs (€)
Costs
Not used
N/A
Costs
Not used
U99_O402_86 - Actual shipments costs (€)
P&ICycle StockCycle stock calculated for P&I exerciseCycle stockU99_O402_57 - Cycle Stock
P&ISHS RltSHS-Replenishment Lead time is calculated from a number of different lead times coming from SAP.
This SHS RLT is multilevel & multi-site
SHS RLTU99_O402_59 - SHS RLT
P&IPast  and future demand
Actual total demand & Future demandU99_O402_63 - Past and Futur demand
Other KPIsPurchase plan (ETA)Receipt plan for products coming from external source (external supplier)resupply from supplier (U01 Z115)U99_O402_23 - Purchased plan (ETA)
Other KPIs
Actuals received from external supplierExternal purchase from SAPU99_O402_3 - Actual purchased material
Other KPIs
Swap balanceNot applicableU99_O402_25 - Planned SWAP U.S