You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 23 Next »

Purpose

The purpose of this document is to define the conversion approach to create Portfolio Bucket Hierarchy
in S/4 HANA.

Bucket: The overall structure of the Portfolio is reflected in a hierarchy of Buckets. Each Portfolio Item is assigned to a Bucket within the Portfolio.

Syensqo utilizes Portfolio Buckets to represent the GBUs and functions for budget management purposes.


Conversion Scope

The scope of this document covers the approach for uploading active Portfolio Bucket Hierarchy from Legacy Source Systems into S/4HANA following the Portfolio Bucket Hierarchy Master Data Design Standard.

This is a completely new object for Syensqo with the data being sourced using DCT (Data Collection Template).

Syensqo utilizes Portfolio Buckets to represent the budget management structure as GBUs and functions.


The above is an illustration only.

  • Level 1 Bucket represents Syensqo group,
  • Level 2 Represents GBU and
  • Level 3 represents Functions within the GBUs.


This is a completely new object for Syensqo with the data being sourced using DCT (Data Collection Template).


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

DCT

All Records

50

S/4HANA

50

Migration load to be done to ROW instance with replication to other S/4 Hana instances done by batch job as per business process.  To be included in cut-over strategy document.

Additional Information

Multi-language Requirement

PPM Portfolio will be maintained in English only.

Document Management

Not Applicable

Legal Requirement

Not Applicable

Special Requirements

Not Applicable




Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement

/RPM/BUCKET_D

EXTERNAL_ID

/RPM/TV_EXTID

Id

CHAR

24

Mandatory

CGPL_TEXT

NAME

CGPL_TEXT1

Bucket Name

CHAR

40

Mandatory

/RPM/BUCKET_D

RELEASE_STATUS

/RPM/TV_RELEASE_STATUS

Status

CHAR

5

Mandatory

/RPM/BUCKET_D

PORTFOLIO_ID

/RPM/TV_EXTID

Portfolio Id

CHAR

24

Mandatory

/RPM/BUCKET_D

PARENT_ID

/RPM/TV_EXTID

Parent Bucked Id

CHAR

24

Mandatory

/RPM/BUCKET_D

CURRENCY

/RPM/TV_CURRENCY

Currency

CUKY

5

Mandatory

/RPM/BUCKET_D

PERIOD_TYPE

/RPM/TV_PERIOD_TYPE

Fin Period Breakdown

NUMC

2

Mandatory

/RPM/BUCKET_D

UNIT

/RPM/TV_UNIT

Capacity Unit

UNIT

3

Mandatory

/RPM/BUCKET_D

CAP_PERIOD_TYPE

/RPM/TV_CAP_PERIOD_TYPE

Cap Period Breakdown

NUMC

2

Mandatory

/RPM/BUCKET_D

BEGDA_FIN

/RPM/TV_FINPLAN_BEGDA

Financial Planning Start

DATS

8

Mandatory

/RPM/BUCKET_D

ENDDA_FIN

/RPM/TV_FINPLAN_ENDDA

Financial Planning Finish

DATS

8

Mandatory

/RPM/BUCKET_D

BEGDA_DEM

/RPM/TV_DEMAND_BEGDA

Capacity Planning Start

DATS

8

Mandatory

/RPM/BUCKET_D

ENDDA_DEM

/RPM/TV_DEMAND_ENDDA

Capacity Planning Finish

DATS

8

Mandatory

/RPM/BUCKET_D

BEGDA_CO

/RPM/TV_COPLAN_BEGDA

Current Transfer Start

DATS

8

Mandatory

/RPM/BUCKET_D

ENDDA_CO

/RPM/TV_COPLAN_ENDDA

Current Transfer Finish

DATS

8

Mandatory

/RPM/BUCKET_D

ZAPPR

HROBJID

Prioritization Approver

NUMC

8

Mandatory

/RPM/BUCKET_D

ZAPPRNAME

STEXT

Prioritization Approver Name


CHAR

40

Mandatory

/RPM/BUCKET_D

 ZPROFITCENTRE

PRCTR

Profit centre

CHAR

10

Mandatory

/RPM/BUCKET_D

 ZFUNCTION

Technical detail for the data element is currently outstanding

Function

NUMC

2

Conditional


Data Cleansing

Not applicable, as data object Project Bucket Hierarchy does not exist in legacy system and will be collected specifically for data migration.


IDCriticalityError Message/Report DescriptionRuleOutputSource System



Conversion Process

The high-level process is represented by the diagram below:


Data Privacy and Sensitivity

Not Applicable.


Extraction

Extract data from a source into Syniti Migrate.


  1. The data does not exist (or cannot be converted from its current state).  The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1Ensure DCT is collected for BucketsData Team
2Perform preliminary completeness checkData Team
3

Raise issues as defects if Req # 1 to 2 are not met

Data Team
4

Repeat Req # 1 to 3 if required

Data Team


Selection Screen

Not Applicable
Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set

None



Data Collection Template (DCT)

Target Ready Data Collection Template will be created for Portfolio Bucket Hierarchy data with exception of some fields which require transformation as mentioned in the transformation rule.

In conjunction with DCT business user will be provided with New Profit center and Position mapping for reference.

Bucket Hierarchy DCT Rules


Field NameField DescriptionRule

PORTFOLIO_ID

Portfolio ID

Unique  Identifier for the Portfolio, Defaulted to "Syensqo"

EXTERNAL_ID

Bucket Id

Manually assigned starts with letter B and follows 5 digit running number - example B-00001, B-00002....
It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template

NAME

Name of Bucket

Buckets in the standard Portfolio are to be aligned with the areas of Budget Accountability and are to be named accordingly. A prefix of  Parent 'GBU' is required at L3 to avoid any confusion with other hierarchies.

It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template

PARENT_ID

Parent ID

It is mandatory to nominate a Parent Bucket on creation of each Bucket, except for the L1 Bucket which is assigned to the Portfolio directly. This hierarchical assignment of Buckets defines the Portfolio structure.

It is a Conditional field: Preload Check to be done to confirm that this is field in the Data Collection Template for the Condition Described

ZAPPR

Prioritization Approver

Position ID of GBU President or delegate to approve the Prioritization for each Function

It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template

ZPROFITCENTRE

Profit centre

Generic Profit centre of GBU which defines that the bucket represents or belongs to the particular GBU.

The General Profit center options uses 9000 range 

It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template

ZFUNCTION

Function

Function at L3 Bucket used to group buckets of same function across all GBUs. Required at L3 Bucket, Blank at L1 and L2 buckets

Dropdown values from table /SYQ/T_FUNCTION

It is a Conditional field: Preload Check to be done to confirm that this is field in the Data Collection Template for the Condition Described below

Level

Level

The level is used to indicate the level of the Bucket and is used in the preload checks

This is a required field

Extraction Dependencies

No Dependencies for Extract

Item #Step DescriptionTeam Responsible

None


Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in Syniti Migrate
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

1

Obtain DCT Sign-off from Business

Data Team

2

Execute and Load and perform Transformation 

Data Team

3

Monitor the transformation progress and ensure performance and completion is within allowed timeframe

Data team

4

Review and Validate Error and Preload Reports

Data Team

5

Generate data load count.

Data team

6

Generate Load Files

Data Team

7

Log errors as defects, if any and address resolutions. Close defects.Data team
8Re-transform and re-validate the Pre-load reports if necessary.Data team
9Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off.Business
10Analyse and resolve any pre-load defects logged by business.Data team
11Repeat steps 7 to 10 if necessaryData team
12Proceed to pre-load validationsData team


Transformation Rules

Not all fields from DCT to be mapped to target fields.

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic

 1

DCT


EXTERNAL_IDBucked IdS/4 Hana/RPM/BUCKET_DEXTERNAL_IDIdCopy from source to target system

 2

DCT


NAMEName of BucketS/4 Hana/RPM/BUCKET_DNAMEBucket NameCopy from source to target system
3DCT
RELEASE_STATUSStatusS/4 Hana/RPM/BUCKET_DRELEASE_STATUSStatusDefault to "0002"(Active)
4DCT
PORTFOLIO_IDPortfolio IdS/4 Hana/RPM/BUCKET_DPORTFOLIO_IDPortfolio IdCopy from source to target system
5DCT
Parent_IDParent Bucked IdS/4 Hana/RPM/BUCKET_DParent_IDParent Bucked IdCopy from source to target system
6



S/4 Hana/RPM/BUCKET_DCURRENCYCurrencyDefault to (EUR)
7



S/4 Hana/RPM/BUCKET_DPERIOD_TYPEFin Period BreakdownDefault to "12"(Annually) From /RPM/PERIOD_TYPE
8



S/4 Hana/RPM/BUCKET_DUNITCapacity UnitDefault to (Day) From T006
9



S/4 Hana/RPM/BUCKET_DCAP_PERIOD_TYPECap Period BreakdownDefault to "12"(Annually) From /RPM/PERIOD_TYPE
10



S/4 Hana/RPM/BUCKET_DBEGDA_FINFinancial Planning StartDefault to "20251001"  (YYYYMMDD)
11



S/4 Hana/RPM/BUCKET_DENDDA_FINFinancial Planning FinishDefault to "20390930"  (YYYYMMDD)
12



S/4 Hana/RPM/BUCKET_DBEGDA_DEMCapacity Planning StartDefault to "20251001"  (YYYYMMDD)
13



S/4 Hana/RPM/BUCKET_DENDDA_DEMCapacity Planning FinishDefault to "20390930"  (YYYYMMDD)
14



S/4 Hana/RPM/BUCKET_DBEGDA_COCurrent Transfer StartDefault to "20191001"  (YYYYMMDD)
15



S/4 Hana/RPM/BUCKET_DENDDA_COCurrent Transfer FinishDefault to "20390930"  (YYYYMMDD)
18DCT
ZAPPRPrioritization ApproverS/4 Hana/RPM/BUCKET_DZAPPRPrioritization ApproverCopy from source to target system
19



S/4 Hana/RPM/BUCKET_DZAPPRNAMEPrioritization Approver Name

Transformation Mapping Position Description

Select HRP1000-STEXT where HRP1000-OBJID=ZAPPR

20DCT
ZPROFITCENTREProfit centreS/4 Hana/RPM/BUCKET_D ZPROFITCENTREProfit centreCopy from source to target system
21DCT
ZFUNCTIONFunctionS/4 Hana/RPM/BUCKET_D ZFUNCTIONFunctionCopy from source to target system

List of Custom Target Reports for this object is maintained here: Conversion Specification - Custom Reports Register.


The Standard template for the upload of Bucket Hierarchy to be used for the upload of Hierarchy into S/4 Hana: Bucket Hierarchy Upload Template

Transformation Mapping

Mapping Table NameMapping Table Description
HRP1000 Position DescriptionTransformation Mapping Position Description

Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible

1

Profit centers has been created (CEPC)


2

Position table HRP1000 has been maintained (HRP1000)

 

3

Ensure all the fields that require value mapping, as stipulated. Mapping tables, have the correct values mapped and imported into tool.

Data Team 


Pre-Load Validation

Project Team

Completeness

TaskAction

Verify Record Count

SyWay I2M Data Team to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets.


Accuracy

TaskAction

Conversion Accuracy

SyWay I2M Data Team to verify that all fields below meet pass the checks:

  1. Mandatory Fields
  2. Field and Value Mapping Correctness
  3. Null Checks
  4. Text Length Checks

Review Error Reports

Review and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source (DCT) data.


Business

Completeness

TaskAction

Verify Record Count

Business Data Owner/s to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets.


Accuracy

TaskAction

Conversion Accuracy

Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data).


Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
  3. Migration load to be done to ROW instance with replication to other S/4 Hana instances done by batch job as per business process.  To be included in cut-over strategy document.

Load Run Sheet

Item #Step DescriptionTeam Responsible

1

Load using transaction RPM_DX_BUCKET 

SyWay I2M Data Team

2

Load 3 records for < > to validate if data is loaded successfully without errors

SyWay I2M Data Team

3

Load 3 records for < > to validate if data is loaded successfully without errors

SyWay I2M Data Team

4

Proceed with full load if steps 2 and 3 are validated

SyWay I2M Data Team

5

Validate few records loaded by accessing Portfolio Bucket Structure App

SyWay I2M Data Team

6

Generate post load report if step 5 is validated

SyWay I2M Data Team


Load Phase and Dependencies

Configuration


Item #Configuration Item
1Override Default Global Settings  (Master Switches  0002   Switched off - Portfolio & Bucket will have manual ID)
2Define Currency Units
3Define Period Types
4Define Capacity Units
5Configure Fields for Mass Import

Conversion Objects

Object #Preceding Object Conversion Approach
1021Portfolio
1073Profit Centre

Error Handling

Error TypeError DescriptionAction Taken
Invalid DataInvalid PortfolioValidate DCT default content
Invalid DataInvalid Bucket ID (Parent ID does not exist)Correct upload data
Invalid DataBucket ID already exists (Bucket appears in list 2)Correct upload data


Post-Load Validation

Project Team

Completeness

TaskAction

Verify Count

SyWay I2M Data Team to verify the record count created in target S/4 HANA by accessing post load reports or standard reports from S/4 HANA.

Verify Logs

Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.).


Accuracy

TaskAction

Conversion Accuracy

Verify that the Bucket Hierarchy in target S/4 HANA were loaded correctly via Standard Portfolio Bucket display and table /RPM/V_BUCKET_DB


Business

Completeness

TaskAction
Verify CountExtract structure from Bucket dashboard in S/4 Hana

Accuracy

TaskAction
Verify Bucket StructureExtract structure from Bucket dashboard in S/4 Hana


Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • The Portfolio Bucket Hierarchy is in scope based on data design and any exception requested by business.

Authorization approach for the Portfolio Bucket Hierarchy is be updated once finalized. 

PDM-631 - Getting issue details... STATUS


See also

Change log

Version Published Changed By Comment
CURRENT (v. 23) Jan 21, 2026 09:01 KOHN-ext, Jacob
v. 29 Jan 20, 2026 16:16 KOHN-ext, Jacob
v. 28 Jan 20, 2026 16:07 KOHN-ext, Jacob
v. 27 Nov 27, 2025 14:20 KOHN-ext, Jacob
v. 26 Nov 20, 2025 10:20 KOHN-ext, Jacob
v. 25 Nov 14, 2025 13:25 KOHN-ext, Jacob
v. 24 Nov 14, 2025 13:10 KOHN-ext, Jacob
v. 23 Nov 14, 2025 09:26 KOHN-ext, Jacob
v. 22 Nov 13, 2025 12:17 KOHN-ext, Jacob
v. 21 Oct 09, 2025 08:02 KOHN-ext, Jacob

Go to Page History

  • No labels