You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 12 Current »

Status

  Approved

Owner
Stakeholders

Purpose

The purpose of this document is to define the conversion approach for migrating Material Master WM Packaging fields (MARA-HUTYP and MARA-HUTYP_DFLT) from legacy SAP systems into S/4HANA.

These fields are critical for handling unit management and packaging processes in Warehouse Management (WM) and Extended Warehouse Management (EWM). Accurate migration ensures that products are assigned the correct Handling Unit Type and Default HU Type, which directly impacts packing, storage, and goods movement processes.



Conversion Scope

The scope of this document covers the approach for converting active WM Execution View from Legacy Source Systems into S/4HANA following the DD-FUN-050 Master Data Standard - WM Execution Master Data Design Standard.

Included:

  • Active materials (>3 years) with packaging relevance

  • Materials used in HU-managed storage types or EWM processes

  • HU Type (MARA-HUTYP) and Default HU Type (MARA-HUTYP_DFLT)

Excluded:

  • Materials flagged for deletion

  • Obsolete, inactive, or blocked materials

  • Non-HU relevant materials

Source Systems and Record Volumes


Source SystemApprox. Records ExtractedTarget SystemApprox. Records After Cleansing
Legacy SAP (PF2)TBDS/4HANATBD
Legacy SAP (WP2)TBDS/4HANATBD



Additional Information

Multi-language Requirement

Document Management

Legal Requirement

Special Requirements




Target Design

TableFieldData ElementField DescriptionData TypeLengthRequirement
MARAHUTYPHUTYPHandling Unit TypeCHAR4Mandatory for HU-managed materials
MARAHUTYP_DFLTHUTYP_DFLTDefault Handling Unit TypeCHAR4Mandatory if default HU is required

Design Notes:

  • HU Types must be configured in target system (T331).

  • Fields are client-level (not plant-dependent).

  • If legacy data is missing HUTYP_DFLT, business defaults will be applied.


Data Cleansing

N/A


Conversion Process

The high-level process is represented by the diagram below:


The high-level process is the same as defined for other material master objects:

  1. Transformation (via Syniti)

    • Apply mapping rules (Legacy HU Type → Target HU Type).

    • Default missing values where necessary.

    • Validate against S/4 HU customizing.

  2. Load (via SAP Migration Cockpit, Staging Tables)

    • Populate Material migration object in Migration Cockpit with HU fields.

    • Sequence: load HU customizing first, then material master with HU fields.

  3. Validation

    • Pre-load: confirm HU mapping completeness.

    • Post-load: sample verification in S/4 (MM03/Display Material).


Extraction

N/A



Data Collection Template (DCT)

A Target Ready Data Collection Template will be created for WM Packaging fields to handle missing or exception values.

DCT Rules

Field NameField DescriptionRule
Material NumberUnique material identifierMust follow material mapping agreed for S/4HANA
Handling Unit Type (HUTYP)Packaging handling unit typeCopy
Default HU Type (HUTYP_DFLT)Default packaging HU typeCopy


Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation


Transformation Rules


Rule #Source SystemSource TableSource FieldTarget SystemTarget TableTarget FieldTransformation Logic
1PF2/WP2MARAHUTYPS/4HANAMARAHUTYPCopy
2PF2/WP2MARAHUTYP_DFLTS/4HANAMARAHUTYP_DFLTCopy


Transformation Mapping

The transformation step ensures that all Handling Unit fields (MARA-HUTYP, MARA-HUTYP_DFLT) from the legacy system are properly mapped and validated against the target design in S/4HANA.

Key Considerations

  1. Data Integrity Checks

    • Ensure that no material is left without a valid HU Type.

    • Validate that all new material numbers used as target keys exist in the master material mapping table before load.


Transformation Dependencies

List the steps that need to occur before transformation can commence

  • HU Types must exist in S/4 (T331) before load.

  • Materials must be created first (basic data) before updating HU fields.

  • Conversion sequencing aligned with overall Material Master load (Basic Data → Packaging → Plant/WM data).


Pre-Load Validation


Project Team Responsibilities

  • Completeness: Ensure all materials have populated HU fields before load.

  • Accuracy: Cross-check HU Types against target customizing.

Business Responsibilities

  • Completeness: Confirm that all business-relevant materials are included.

  • Accuracy: Validate that assigned HU Types are correct and align with packaging standard


Load


Load Run Sheet

Item #Step DescriptionTeam Responsible
1Execute automated data load via Migration Cockpit staging tablesData Team
2Extract post-load data from S/4HANA for verificationProject Team


Load Phase and Dependencies

Configuration Prerequisites:

  • HU Types configured in T331.

Conversion Object Dependencies:

  • Predecessor: Material Master – Basic Data.

  • Successor: Plant/WM views (if applicable).

Error Handling


Error TypeDescriptionAction
Mapping ErrorHU Type not found in target customizingUpdate mapping table or request config update
Data ErrorMissing or invalid HU valuesDefault or cleanse via Syniti
Load ErrorMARA lock due to prior loadSchedule delta load


Post-Load Validation

Project Team:

  • Completeness: Compare load counts (source vs target).

  • Accuracy: Run spot-checks in S/4 (MM03, Packaging tab).

Business Team:

  • Completeness: Confirm all expected materials have HU data.

  • Accuracy: Validate default HU Types function correctly during inbound/outbound processes.


Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • is in scope based on data design and any exception requested by business.
  • HU Types are fully configured in target S/4 system before migration.

  • Only active, HU-relevant materials are in scope.

  • Syniti mappings are signed off by business before load.

  • Migration Cockpit is the standard tool for loading data into S/4.

  • Cutover strategy may require delta load for newly created/updated materials.


See also


Change log

Version Published Changed By Comment
CURRENT (v. 12) Dec 02, 2025 04:29 HASSAN-ext, Shamir
v. 12 Nov 18, 2025 17:18 HASSAN-ext, Shamir
v. 11 Nov 17, 2025 21:48 HASSAN-ext, Shamir
v. 10 Nov 05, 2025 07:58 HASSAN-ext, Shamir
v. 9 Oct 28, 2025 12:58 HASSAN-ext, Shamir
v. 8 Oct 27, 2025 07:56 HASSAN-ext, Shamir
v. 7 Oct 03, 2025 13:14 RAYUDU-ext, Narasimha Kumar
v. 6 Oct 03, 2025 13:13 RAYUDU-ext, Narasimha Kumar
v. 5 Sept 08, 2025 23:02 HASSAN-ext, Shamir
v. 4 Sept 08, 2025 22:56 HASSAN-ext, Shamir

Go to Page History

Workflow history

Title Last Updated By Updated Status  
There are no pages at the moment.

  • No labels