title

Prerequisite

  WP1 Worldwide

IAC controls

     
Product Costing

RoleSupervise the product costing

previous Operation(s): (warning)

 Training:


RCOM reviews through a checklist costing models prepared by each FRA in his region.

RCOM checks the existence of validation from GCCO and plant manager.

Guideline








Reference

 

Next Operation: OP13, OP28