Prerequisite

  WP1 Worldwide

IAC controls

      
Product Costing

RCOM reviews through a checklist costing models prepared by each FRA in his region.

RCOM checks the existence of validation from GCCO and plant manager.

Guideline

 
 
 
 I am informed once the standard rates are calculated in the system
 
 I inform the requester that the standard rates are in the system
 

Reference

 

Next Operation: OP13OP28