IAC controls
Product Costing
Area: Supervise the product costing
previous Operation(s): OP104
RCOM reviews through a checklist costing models prepared by each FRA in his region.
RCOM checks the existence of validation from GCCO and plant manager.
Next Operation: OP13, OP28