Indicates whether, for a specific plant, the material may be used 

In WP1, there are 3 main status that can be used:

  • 01 Blocked for procment/whse => Mainly used in Brazil. Once accounting & costing views are created, before GBUs validation and the cost estimate is released.
  • Z0 Blocked for all => Used when the material code is not used anymore (it is obsolete)
  • Z1 Material creation in prog => Used when the creation is in progress (until the cost estimate is released)

The field remains empty once the cost estimate is released. The material code can be used.

The field must always be filled until the cost estimate is released (except in trading plants) :

  • With the status Z1
  • or with the status 01 (used in Brazil)