Tasks to be completed when documenting an operation (from creation to publication)1. Enter the Title of the operation / page2. Add the following Labels :
3. Fill in all fields as described above4. Once the description of the operation is completed, ensure it is approved and published by launching the SBS-Finance approval workflow |
| Domain: Country Accounting |
Responsibility area: N/A |
This document aims to give instructions on how to prepare the Analysis File from the Future Standard Cost Estimate to be sent to the Controllers and Local Accounting team.
Controllers analyze the costs previously in SAP to correct any errors before closing if needed, validate the material prices and validate the significant variances of Antecip. Reval and %Var. costing/MM.
Costing run calculates the standard cost estimate for the next period based on end-month figures of the closing period. After calculation, SBS Finance Operations team sends detailed reports to the controllers and Local Accounting team to support their analysis so they can identify the major changes, anticipate possible issues to correct before closing and justify high variances when needed. The reports are sent in different moments of the month for each purpose – as further explained in this document. Target is having the minimum level of errors as possible.
First the material's price is analyzed and the first errors identified. Then, when it’s near to closure, the variances are daily reported and treated while the errors corrections are still monitored. On D-1 after all remaining variances are properly justified and the errors are all corrected, the prices are marked and set up for every material movement of the next period.
This procedure applies to company 7424 - Solvay USA Inc. - All Plants.
The reports must be sent on following days:
See Finance Glossary:
Reports Preparation: SBS Finance Operations
Analysis, Variances Justification and Corrections: Plant Controllers/FRAs
Support: Service Unit Management Accounting (SUMAC)
This report needs to be sent on D+10, D+11 and from D-5 to D-1.
1) Download the macro 7424 - SCE Insert the date on cell B2 - Always use the first day of the next month of the current month;
![]()
2) Save the file in your Desktop with the name SCE;
3) Click on "Run" button to run the macro (do it with WP1 system opened).

4) The macro will open 2 new excel files:
3) In the excel file Book, insert a new column in A and name it as "GBU";
Take one report from previous month in .... and copy the tab "PC materials" to Book excel file. This file contains the information of profit center and GBU per material and plant;
In Book excel file, make a vlookup to get the "COMBO MATPLANT" column in tab "PC Materials" and bring the information in column "FC Enterprise description"
4) Make a filter in column N "Anticip. reval." per red color. Verify if all information in column J "%Var. costing/MM" is red as well. If not, paint it with red.
5) Make a filter in column J "%Var. costing/MM" per red color and verify if there is any "N/A" in column GBU.
If yes, you need to include the information of material, plant, COMBO MATPLANT and the "FC Enterprise description" in tab "PC materials".
To get the "FC Enterprise description", use the transaction ZWFAI052 and insert the information below:
Controlling Area: Z028
Current Date: today date
material and plant and execute

You need to copy the profit center and paste on column C in tab "PC materials"
![]()
And copy the market and paste in column I in tab "PC materials":
![]()
With this, the column A in tab "Report" needs to be without "N/A".
6) Save it with name "7424 - SCE (D-Number of the day or D+Number of the day) Costing Run Results - MMMM/YY"
This report is only from D-5 to D-1.
The folder below is used to save the G Drive file that highlight the amounts greater than 10% or below -10% for "%Var. costing/MM", and greater than 50K or below -50K for "Anticip. Reval.". It will be automatically highlighted in red, column I and M.
Folder File: 7424 - Costing Run Issues Control
Template File: 7424 - Costing Run Variances - Template
Tab Summary Anticip. Reval: Lists materials with high anticipate reval and plant;
Tabs by day: Used by controllers to justify the variances on price change over 10%
The comments will be automatically transferred from one day to another, which means that if there is a comment in a price variance in D-4, it will be automatically copied to D-3 until D-1. → Just double check if all rows are with formulas.
1) On D-5, take the file 7424 - Costing Run Variances - Template (template) or make a copy from last month from folder 7424 - Costing Run Issues Control and name it as "7424 - Costing Run Variances – Month";
2) In the excel file created in step 3.2.1, filter the column N "Anticip. reval." by red color and copy the material, plant and COMBO MATPLANT and paste in G Drive file tab "Summary Anticip. Reval";
3) Copy the information in excel file tab "Report" from A to V without filter and paste in the G Drive tab D-5 or the day corresponded that you are preparing the report;
4) In the G Drive file, select the columns from G to V and format > number automatic:

5) Select again the columns from G to V and press "Ctrl+H" to find the "." and replace per nothing;
6) Select the columns from G to V and press "Ctrl+H" to find "," and replace per ".";
7) Select columns from J to P and go to format > number > number again;

8) Select columns from S to V and go to format > number > number again;
9) With this, the tab "Summary Anticip. Reval" will be populated automatically on D-5, D-4 and etc:
10) After that, check the column comments in all tabs to see if the formula is in all lines that have information.
Corrections Guide:
7424 - Costing Run list of Errors & Warnings
The report can be prepared using the macro attached 7424 - Cost Run Error or manually as shown below.
1) Go to transaction CK40N and extract all the error messages clicking on the log of the three steps below of costing run:
Selection
Struct. Explosion
Costing
Exclude all message type “I” – Information
2) Classify the errors as following:
Message type E
“No Price…”
“Blocked…”
“Production Version…”
Cost estimate for material XXXXXX contains errors -> Planned Price
Material XXXX in plant XXXX has material status Z0 : Blocked for all
Material XXXX in plant XXXX w/o cost comp split: price acc to val strategy
THIS IS ONLY FOR D-5
You can use the macro attached 7424 - Commercial Price or follow the instructions below manually:
1) Go to transaction SQ00
Click on
then select “COSTING”

Select the query: Z_ARTICLE

And run with variant: 7424_COMM HA and Execute.
![]()
2) Once the reporting is generated, select the plant column and sort in ascending order:

Extract the report by clicking on
List → export → Spreadsheet

3) Save as “7424 – Commercial Price – Month”.
Create a ticket via Freshdesk tool and insert the link for G Drive file, the excel file, the costing run errors and the commercial price report D-5 (this last one only in D-5).
D+10 and D+11: excel file, the costing run errors;
From D-5 to D-1: G Drive file, the excel file, the costing run errors
Only on D-5: commercial price report
The list of errors is sent to the plants separately between “Errors to be fixed”, “Errors to be ignored” and “Errors to be deleted”.
When all the reports are done, send them to: