Prerequisite

WP1 Worldwide

The analysis must be performed by the FRA every month between D-5 and D-2 12pm


Product Costing

Area: Monitor the consistency of the monthly cost calculation

previous Operation: OP.022

Rules & Glossary: Costing - Rules Costing - Glossary Costing - SAP Operations


 



Guideline

 
 
 

Reference

 

Next Operation: OP.025