Process: Product Costing

The analysis must be performed by the FRA every month between D-5 and D-2 12pm

Scope

Frequency

 
References

Attachments

N/A

OP.023  <<

 

 

  Guideline  

Prerequisite

WP1 Worldwide

The costing should be marked and the release scheduled after validation of the FRA on D-2 - 12pm


Product costing


 


Guideline

The FRA must send by D-2 - 12pm its validation by email

Reference

 

Next Operation(s): (warning)