Tasks to be completed when documenting an operation (from creation to publication)1. Enter the Title of the operation / page2. Add the following Labels :
3. Fill in all fields as described above4. Once the description of the operation is completed, ensure it is approved and published by launching the SBS-Finance approval workflow |
| Domain: Country Accounting |
Responsibility area: N/A |
This document aims to give instructions on how to prepare the Analysis File from the Future Standard Cost Estimate to be sent to the Controllers and Front Office (change Front Office).
Controllers analyze the costs previously in SAP to correct any errors before closing if needed, validate the material prices and validate the significant variances of Antecip. Reval and %Var. costing/MM.
Costing run calculates the standard cost estimate for the next period based on end-month figures of the closing period. After calculation, SBS Service Center NAM team sends detailed reports to the controllers and front office team to support their analysis so they can identify the major changes, anticipate possible issues to correct before closing and justify high variances when needed. The reports are sent in different moments of the month for each purpose – as further explained in this document. Target is having the minimum level of errors as possible.
First the material's price is analyzed and the first errors identified. Then, when it’s near to closure, the variances are daily reported and treated while the errors corrections are still monitored. On D-1 after all remaining variances are properly justified and the errors are all corrected, the prices are marked and set up for every material movement of the next period.
This procedure applies to company 7424 - Solvay USA Inc. - All Plants.
See Finance Glossary:
Reports Preparation: SBS Service Center NAM Team
Analysis, Variances Justification and Corrections: Plant Controllers/FRAs
Validation: NAM SBS RtR (change RtR) RCOM
1) Go to CK40N, use costing run code 7424SCE and fill the date - the first day of the next month
2) Click on “Costing Results”, and then on “Analysis”
3) Click on and select layout /FILIPESCE
4) Click on then "spreadsheet" and "table" to extract to Excel file
5) Open the file “SCE” attached on this documentation and use the tab “Report” to paste the information extracted from SAP
6) Create a new "C" column, name it as “MATPLANT” and concatenate results from columns A (Material) and B (Plant)
The template below is used to highlight the amounts greater than 10% or below -10% for "%Var. costing/MM", and greater than 50K or below -50K for "Anticip. Reval.". It will be automatically highlighted in red, column I and M.
Template File: 7424 - Costing Run Variances - Template (update)
Tab Summary Anticip. Reval: Lists materials with high anticipate reval and plant;
Tabs by day: Used by controllers to justify the variances on price change over 10%
The comments will be automatically transferred from one day to another, which means that if there is a comment in a price variance in D-4, it will be automatically copied to D-3 until D-1. → Just double check if all rows are with formulas.
1) In D-5 copy this file in the folder "7424 - Costing Run - Variances", name it as "7424 - Costing Run Variances – Month"
2) Use a filter by color on column I, copy and paste the highlighted amounts into this new report in G. Drive, in the columns corresponding to the day reported. Copy from column A to U.
3) Use a filter by color on column L, check if there is some line that doesn’t have the column “I” highlighted (values more or less than 10%). Copy and paste this line into the G. Drive as well.
4) Copy the data from columns Material, Plant, and MATPLANT for all these lines, and paste in tab "Summary Anticip. Reval".
5) Update the data in column A1. After pasting data, hide column "C"
Tab Summary Anticip. Reval
6) The amounts for Anticip.Reval greater than 50K or below -50K will be highlighted, just make sure that all is correct.
7) After closing, upload the final file on AODocs by D5 using path below.
My Libraries > NAM Internal Controls > Cost Accounting > WP1 Costing Run - Variances Explanation
(please link to the path)
Corrections Guide:
7424 - Costing Run list of Errors & Warnings
The report can be prepared using the macro attached or manually as showed below.
1) Go to transaction CK40N and extract all the error messages clicking on the log of the three steps below of costing run:
Selection
Struct. Explosion
Costing
Exclude all message type “I” – Information |
2) Classify the errors as following:
Message type E
“No Price…”
“Blocked…”
“Production Version…”
Cost estimate for material XXXXXX contains errors -> Planned Price
Material XXXX in plant XXXX has material status Z0 : Blocked for all
Material XXXX in plant XXXX w/o cost comp split: price acc to val strategy
3) Upload the D11 errors report on Google Drive link below by plant and notify the corresponding plant controllers and RCOM.
https://drive.google.com/drive/folders/0BzJjTiQz5SQEY0N5Xzh2R2NRUGs (name the file and link it)
When all the reports are done, send them to:
To see the updated contact list please use GDrive link: NAM Contacts.
End of document.