Responsibility area: SBS-P-DRTR-02-004 Internal Control  

Risk

All materials aren't counted   

Objective

FRA ensures that plant physical inventory procedure is updated every year, that physical count coverage comply with group rules and that auditors can supervise physical inventory organized during Q4


Process description

Physical inventory objective is to check the existence and ownership of inventories.

Control description

FRA

  1. updates plant inventory procedure and control compliance with group rules
  2. coordinates with Physical Inventory Manager (PIM) execution to reach defined targets at end of September and of December.
  3. publishes last quarter physical inventory planning and require GCCO validation for exceptions to the rules defining the physical coverage rate for year end.

  • Set up the revised calendar on September
  • In september : BW report posted to attest that 90% of the physiscal inventory has been done
  • In november : BW report posted to attest that 100% of the physical inventory has been done

 

 

Former Controls

IAC 04.13.00.01 / IAC 04.13.00.03 / IAC 04.13.00.04

Scope

Frequency

Last working day of September and of December

Control owner

Finance Responsible Assigned (FRA)

References

 

Control evidences

 

 

  Guideline  

Download the file : IAC 02.03 Physical count.xls

There are 4 sheets in the file

2 sheets must be filled:

  1. "Inventory Check-List/FRA" in English or in French




  2. Report

 

Start to fill :

  1. the site
  2. the controller's name
  3. the date
  4. the period

Then answer "Yes" "No" or "N/A" to confirm that each control is performed .

 

If the answer is "No" or "N/A", it is compulsory to add a comment in column H


It is possible to add a control evidence (attachment or a link)

1. Attach your validated procedure describing how items excluded from slow turn reserve are identified


  1. Choose "insert"
  2. Click on the "Object" button
  3. This window will open
  4. Select "Create from File"
  5. Add you file by clicking in "Browse"
  6. Select "Display as icon"
  7. Select OK

2. Enter the sales force ticket that was used to submit the calculation to the service center.

 

Approval emails sent by GCCOs must be saved in pdf.