Table of contents

Scope


ERP


 

References


Attachments


5. Add the link to attachments (to be stored in AODocs or GDrive) or external links

1. INTRODUCTION

1.1. Objectives and scope of this procedure

This SOP explains how to create a material contract.

Who uses this document?

What is the nature of the need

User / PREQ creator

Approver

PSR

PS

Goods

Services

   

X

X

X

1.2. Material groups in scope

  • The material groups in scope are all started with ZM or ZP.

1.3. Process step described in this procedure and expected end product

End Product 

1.4. Abbreviations

Abbr.

Description

Abbr.

Description

OP

Operating procedure

  

2. STANDARD OPERATING PROCEDURE DESCRIPTION

2.1. Creation of agreement with reference to a pre-existing one

#

Main activities

Tips / Best practices

Key points

1

Enter transaction M31K

  

#

Main activities

Tips / Best practices

Key points

2

On the Menu bar, go to "Outline Agreement" and then select "Copy".

The next screen can also be reach by using keys Ctrl+F2.

 

#

Main activities

Tips / Best practices

Key points

3

Enter the agreement number that will be basis of this new one.

  

4

Enter which items must be copied.

If all the lines must be copied select "From 10 to XX (XX=last item number of the existing agreement).
If only the header and the first line must be copied, select "From 10 to 10". This will create the header and 1 item. The remaining items can be later created.

If the agreement being created is a local agreement based on a corporate one, all lines must be copied.

5

Click .

  

#

Main activities

Tips / Best practices

Key points

6

The document will jump into the header creation screen.
Here all the data can be confirmed if correct.

  

7

Click .

  

#

Main activities

Tips / Best practices

Key points

8

The details on each line (or only 1 line depending on previous selections) can be edited.

  

9

Click to save the agreement.

  

2.1.1. Note for local agreement copied from corporate agreements

In case of a corporate agreement with more local ones, it is advised to add in the Header note the link between the agreements.

#

Main activities

Tips / Best practices

Key points

10

Enter transaction ME32K

  

#

Main activities

Tips / Best practices

Key points

11

Enter the agreement number.

  

12

Click on .

  

#

Main activities

Tips / Best practices

Key points

13

Go to .

  

#

Main activities

Tips / Best practices

Key points

14

Double click on the .

  

#

Main activities

Tips / Best practices

Key points

15

Insert the local or corporate agreement number to which the current one refers to.

In the above screen we are seeing in the corporate agreement the numbers of the local agreements to which it is linked: 410020042 is the corporate and with reference to it 4610020046 was created for France, 4610020242 for Germany ….

 

3. REFERENCES

This procedure refers to the documents listed in the table below:

File name

Document type

Document title

List of SOPS related to PRO 20.1

PRO

xxxx