Table of Contents

Scope


   

ERP


  

References


Attachments


5. Add the link to attachments (to be stored in AODocs or GDrive) or external links

1. INTRODUCTION


1.1. Objectives and scope of this procedure

This OP explains how to create, modify and suppress a raw material and respective PRODCOM on WP2 system.

Who uses this document?

What is the nature of the need

What provisioning channel does this document concern?

User / PREQ creator

Approver

LPR/buyer

PS

Goods

Services

e-catalogue

Goods managed in stock

Goods and services – spot buys

Goods on contract

Services on contract with SES

Emergency cases

Urgent needs




X

X



X


X





1.2. Material types in scope

− All materials define at Rhodia Legacy on Industry Sector – Chemical Industry with Material Type:

Material Type

Purchasing Organization

Description

Division

Material Group

ZPRC


PRODCOM


0451

ZMAT

3006

Raw Material

KV

0451

1.3. Abbreviations


Abbr.

Description

Abbr.

Description

RCS

Rhodia Core System



DGI

Dangerous goods indicator profile



2. STANDARD OPERATING PROCEDURE DESCRIPTION


2.1. Principles

Creation and management of raw materials and respective PRODCOM, will abide by a restricted set of rules. Further details will be described in the specific operational description.
Requests for creation of raw material and respective PRODCOM must have mandatory information submitted, in order to proceed with the creation, modification or suppression of the code(s). The list below will contemplate both types of codes.

  • Name of the requester and respective GBU
  • Supplier's Code
  • Material Segment Code
  • DGI Indicator Profile
  • Industry Sector
  • Material Type
  • Proposed Description
  • Base Unit of Measure
  • Material Group
  • Division
  • Relevant Descriptions in other language(s), based upon the proposed description.

 

Template Raw Material - Packaging.xlsx


Without the mandatory DATA, don't proceed with the creation process. Verify missing data with the requester
A request for a new raw material code creation always have implicit the creation, if necessary, of respective PRODCOM. Same goes for the modification of the raw material, having to adjust the linked PRODCOM to the modifications applied in the respective raw material description.

2.2 Principles for a proper description creation

2.2.1 Raw Materials

The core rules to build a proper description are as follow for Raw Materials:

  • Preferably the chemic designation (and not a formula/Brand name) followed by the weight and the type of packaging associated with the material.

CARBON DIOXID 99% 25KG CYL (chemical description+ concentration + weight + packaging type)

  • Also accepted brand or commercial names, when no chemical designation is known.
  • Restricted to 40 characters
  • In some cases additional information is required, such as the concentration (%) of the product, in order to distinguish very similar codes
  • Two or more codes can share the same chemical designation and have different kinds of packaging. So, will not be handled as code duplication.
  • Descriptions are always created in uppercase
  • 11 languages, being FR and EN mandatory and must describe the exact same material.


2.2.2 Prodcom


Data Stewards has to contact the HAZCOM Team to verify whether a new prodcom is required or not for the requested material. It is necessary to provide the SDS also to get this information from HAZCOM team. You can refer to the process here.

A few exceptions to this rule:

  • when a raw material already exists in bulk, but the new request is to create the same raw material in drums or bags or IBCs. In this case, the same prodcom used in bulk can be used. Likewise, if a raw material already exists in drum or bags but the new request is to change weight or volume then the same prodcom in the existing raw material can be used.
  • when a prodcom creation request comes directly from HAZCOM team member.

If a new Prodcom is required, follow the process below:

The core rules to build a proper description are as follow for Prodcom:

  • Same chemical designation given to the linked raw material, not including the packaging type information and instead replacing it with the "/ GENERIC"

CARBON DIOXID 99% / GENERIC

  • Restricted to 40 characters
  • Include all the additional information that was supplied with the raw material request.
  • Two or more raw material codes can SHARE the same Prodcom, exactly because Prodcom does not have the packaging type information and will be handled as a generic.
  • Descriptions are always created in uppercase
  • 11 languages, being FR and EN mandatory and must describe the exact same material.


2.3 Principle rules for description modification


Modifying descriptions are even more restricted than in the remaining material groups. Existing as an ID tag for a product with sometimes huge quantities/currency involved in orders, makes it important not to modify it at will.
Core rules for description modification are as follow:

TYPE OF MODIFICATION

RULE

Translation of the short description in a dedicated language or change of the description but no difference for the product

Yes, if only set for one plant. If set for more you need the approval for all the plants.

Modification of the supplier's ref. for the good – If the chemical composition or the quality doesn't change

Yes, if only set for one plant. If set for more you need the approval for all the plants.

Modification of the supplier's ref for the good –– If the chemical composition or the quality is different

No, a new code must be created.

Change of packaging type or packaging quantity

No, a new code must be created. But if only set for one plant, it's at requester risk to ask for the modification.

Cases when the material is set with a Brand or Commercial name , and request to name and supplier change

No, a new code must be created.

Cases when the material is set with a Brand or Commercial name, and request to name but same supplier concluding it's still the same product.

Yes, if only set for one plant. If set for more you need the approval for all the other plants.

Change of the purity rate or any chemical change

No, a new code must be created.

Change of a 0450 ( older raw material codes) description

No, Redirect to Data Administrators.

2.4. Creating codes for Special Projects

Special project requests rarely occur. They are identified by the requester, and usually attached with a long list of material codes in the mass upload template creation. The requester will ask for the descriptions to be validated. It's a step by step process with clarifications in order to the list be as accurate as possible in terms of product description.
The process of creation is done via mass upload by IS Team and submitted by the requester after all the material code descriptions are validated. The information D&A is done in the Mass upload creation template.

3. STEPS OF THE PROCESS


After the material description proposed by the requester is checked and validated, then the process of creation begins.

3.1. Verify possible duplication of material code in RCS

Perform the search twice, for raw material codes (ZMAT) and prodcom codes (ZPRC)



#

Main activities

Tips / Best practices

Key points

1

Enter transaction MM03




Click the Search option in dialog box

By "Material Type"

#

Main activities

Tips / Best practices

Key points

2

Insert the string description with wildcards, given in the request.

Wildcard the chemical designation only
CARBON DIOXID

Double search for ZMAT and ZPRC. It's not unusual to find a very similar prodcom codes. It's not unusual to find the same chemical designation in ZMAT code with another packaging type. Don't consider those cases duplications.

3

Hit Enter






#

Main activities

Tips / Best practices

Key points

4

Verify entries found



A

Note that in the example we do have the same chemical description but several different packaging types, as well as a bulk version.

Check Rule #A

If result points to or Rule #A applies. Ok to create.



#A

Rule: ZMAT Codes with the same chemical description but with different packaging types/bulk are not considered duplications. In those cases a new code needs to be created.
ZPRC Codes with the exact same chemical description but without a "/generic" mention at the end are not considered duplications. ZPRC codes created for older 0450. A new prodcom code needs to be created with "/ generic" mentioned.


3.2. Creation of a material code

After performing all duplication checks and if a new Raw material needs to be created, it's necessary to check the GBU mentioned in request and request the approval to GBU Data Administrator. Please see GDOC with Data Administrators list and the GBU's where this step is needed.
Send an email with all details for Data Administrator and wait for their approval before proceeding with the process. After the approval go to step 3.2.1.

3.2.1. Creation of a Prodcom code


There is always a link between a given raw material code and a prodcom code. So, if a prodcom does not exist or the search for a prodcom does not meet the req. to find a compatible one, a new code must be created to be linked.



#

Main activities

Tips / Best practices

Key points

5

Enter transaction MM01





#

Main activities

Tips / Best practices

Key points

6

Enter Industry Sector


Always choose "Chemical Industry"

7

Enter Material Type


ZPRC Commercial Product

8

Option for a model


This allows one faster creation and avoids errors.

Model number : 90065204

9

Hit Enter



10

Select the views for creation

Highlighted views

Basic Data 1
Basic Data 2
Classification

11

Hit Enter


Or click



#

Main activities

Tips / Best practices

Key points

12

Enter Material Description

Construct it and the correspondent ZMAT description before you start the process of creation; Short Description always in Capitals

Follow the rules described in 2.2.1 for Prodcom

13

Enter Base Unit of Measure


Always "KG"

14

Enter Material Group


Always "0451"

15

Enter GenItemCatGroup

Already filled

Always "NORM"

16

Hit "Additional Data" button




#

Main activities

Tips / Best practices

Key points

17

Go to Tab "Descriptions"


Follow the rules described in 2.2.1 for prodcom

18

Add the 12 languages for the material description in each of the lines.

12 mandatory languages are: EN - English, FR - French, PT - Portuguese, NL – Dutch; ES - Spanish, IT - Italian, DE - German, PL - Polish, JA - Japanese, KO – Korean and ZH – Chinese and Z9 –Copy of Portuguese

Don't forget Chemical name + "/" + "GENERIC" all in uppercase

19

Hit "Main Data" button and pass through Basic data 2

Continue to Classification

No Action in Basic Data 2



#

Main activities

Tips / Best practices

Key points

20

Create Class Type 001


If model given for prodcom is used for creation , the material class is already defined

21

Enter Class "String"

Always the same Class code "LIP0020148"

If the model given for prodcom is used for creation , the 001 material class is already defined.

22

Click Next, and Save

The code will be used in the respective Raw Material link, so be sure to create a note with the number

Your Prodcom is now created


3.2.2. Creation of a Raw material code

Reminder - There is always a link between a given raw material code and a prodcom code. So, if a prodcom does not exist or the search for a prodcom does not meet the req. to find a compatible one, a new code must be created to be linked.



#

Main activities

Tips / Best practices

Key points

23

Enter transaction MM01






#

Main activities

Tips / Best practices

Key points

24

Enter Industry Sector


Always choose "Chemical Industry"

25

Enter Material Type


ZMAT Finished Product

26

Option for a model

Allows faster creation and avoids errors

Model use if the new code data is defined as:

Bulk : 127217 141379 (if a code is in BULK, always use this designated model , no matter of the DGI profile defined)

Z00: 127218 (defined DGI indicator for the future code)

GPP or ZIP : 129898 168524 (defined DGI indicator for the future code)

27

Hit Enter



28

Select the views for creation

Highlighted views

Basic Data 1
Basic Data 2
Classification
Sales Org Data 1
Sales General Data
Purchasing

29

Hit Enter


Or click

30

Hit Enter

Will not be defined at this step

Bypass Org Levels








#

Main activities

Tips / Best practices

Key points

31

Enter Material Description

Take into consideration the respective prodcom description that was created/linked

Follow the rules described in 2.2.1 for Raw Materials

32

Enter Base Unit of Measure

Nearly always "KG", exception made when it's defined "L"

Given by the requester

33

Enter Material Group


Always "0451"

34

Enter Division


Always "KV"

35

Gross Weight

Always check the request for given values

1,1 if packaged in DRUMS,
1,0 for the rest of the packaging and Bulk
XX if requester fills in the real value

36

Net Weight


1,0 for all the packaging/ bulk

37

Weight Unit

Even if Base Unit of Measure is defined in "L"

Always in "KG"

38

Enter Matl Grp Pack.Matls


0001 if Bulk
0005 if Packed

39

Hit "Additional Data" button




#

Main activities

Tips / Best practices

Key points

40

Go to Tab "Descriptions"


Follow the rules described in 2.2.1 for prodcom

41

Add the 12 languages for the material description in each of the lines.

12 mandatory languages are: EN - English, FR - French, PT - Portuguese, ES - Spanish, NL – Dutch; IT - Italian, DE - German, PL - Polish, JA - Japanese, KO – Korean and ZH – Chinese and Z9 - Brasilian

Don't forget Chemical name + "/" + "generic" all in uppercase , 40 chars max.

42

Hit "Main Data" button





#

Main activities

Tips / Best practices

Key points

43

Select "Basic Data 2" tab



44

Insert the corresponding prodcom code

Prodcom code that was created or checked before the process of raw material creation started


45

Insert the DGI indicator profile

Given by the requester

Z00: Non dangerous
GPP: Dangerous
ZIP : To be classified

46

Click "Classification" Tab




#

Main activities

Tips / Best practices

Key points

47

Create Class Type

Always "001"

If model is used for creation, it will be already created

48

Create Class

Always "MATERIAL_SEGMENTS"

If model is used for creation, it will be already created

49

Insert the correspondent Material Segment

Mandatory information always given by the requester.

Given by the requester

50

Double hit "Enter"

To assume the Material Segment description


51

Click "Next"

Proceed to the Sales Org. 1 TAB






47

Create Class Type

Always "023"

If model is used for creation, it will be already created

48

Create Class

As provided by the requestor. If not provided, populate class as 001.


49

Click "Next"

Proceed to the Sales Org. 1 TAB



#

Main activities

Tips / Best practices

Key points

50

Insert "X-distr.chain status"

Always "63"

If model is used for creation, it will be already filled in

51

Insert the Validity

Always the date of creation

DD.MM.YYYY

52

Proceed to Sales:general/plant Tab




#

Main activities

Tips / Best practices

Key points

53

tick "Batch Management"

Mandatory for all the raw materials

If model is used for creation, it will be already filled in

54

Insert the Trans. Grp.

Always "0001" even if it's BULK. Exceptions made when the requester specifically asks you to fill in another transport group.


55

Select Purchasing Tab





#

Main activities

Tips / Best practices

Key points

56

Enter the "Purchasing key value"

Always "0001"

If model is used for creation, it will be already filled in

57

Go back to "Basic data 2"







RULE: If the DG Indicator Profile is set to ZIP/GPP, then two additional steps are needed in order to complete the raw material creation. (???)

#

Main activities

Tips / Best practices

Key points

58

Click Additional Data Tab




#

Main activities

Tips / Best practices

Key points

59

Enter "Units of Measure"



60

Insert a new conversion

Conversion between the the packaging unit and the base unit of measure defined

In this case " 6 Cylinders correspond to 205Kg"

61

Click "Main Data" Tab





#

Main activities

Tips / Best practices

Key points

62

Select "Label Data"


Click the side button indicator

63

Insert the "Primary Pack.Unit

If already set in configuration, you don't need to add it again
For BULK material codes use the KG


64

Select the proper tab, the unit you have inserted in the primary packing unit.


Tab DRUM

65

Insert the proper values in the selected fields

  • Label category = Z_RAW
  • Gen. Var. = GLM_RAW_01
  • Copies =1


66

Select the line and click in validity areas



67

Add the two values

GENERIC
G_RECEIPT

(Note: please also check section 3.2.3 REACH regulation)






3.2.3. REACH Regulation – WP2 Raw Materials (addon)



All chemical products must be registered in the European Chemicals Agency (ECHA) data base.
At material level all parameterizations are done in WP2 for the following material group:

  • 0451 – CHEMICAL PRODUCTS FOR RAW MATERIALS


Currently we are not managing this view. But, in the process of creation we should open QM view with MM01



And tick QM Proc active,



Steps for REACH regulation at Material Master Data level:

#

Main activities

Key points

1

Enter MM01 « Create material » - Insert material code in both fields as screen above and Press Enter twice.


Complementary information:

  • Material Type: ZMAT – Raw materials
  • Material Group: 0451

2

Select only View Quality Management


3

QM Procurement Active – Always s flagged



 

Rule : As the process of creation is completed, gather both the procom code #number , description as well as the newly created raw material code #number, description. 

Join also the supplier code #number information.
 

Always mandatory do send an email with the gathered information to hazcom.rawmat@solvay.com (HSE, if ECO) and hazcom.rawmat-sco@syensqo.com (if SCO). You can check this information based on the GBU of the requestor.



3.3. Raw materials modification


Check "Principle rules of description modification" in chapter 2.3.
Rule: If a raw material is changed according to the "Principle rules of description modification" the respective prodcom description must be updated accordingly.
When update is done on both codes, notify HSE – hazcom.rawmat@solvay.com(if ECO) and hazcom.rawmat-sco@syensqo.com (if SCO).



#

Main activities

Tips / Best practices

Key points

67

Enter MM02 for Article modification



68

Enter the material number
Hit Enter.


Provided by requester

69

Select the PURCHASING view
Hit Enter.





#

Main activities

Tips / Best practices

Key points

70

Hit the box on Plant field



71

See all the Plants created for that material


Referred by requester


If more than one Plant associated with the material, contact and inform the requester that we need other Plants approval to modify the material (the responsibility of request the approval to other plants is from requester).

  1. If the answer is positive, change the material as shown from step 72 to 77.
  2. If the answer is negative, create a new Raw material and verify if it's needed a new prodcom code.

3.3.2. Modification



#

Main activities

Tips / Best practices

Key points

72

Enter MM02 for



73

Enter the material number and hit Enter


Indicated by requester

74

Select the Basic Data 1 view



75

Click .





#

Main activities

Tips / Best practices

Key points

76

Make the changes necessary.

You can navigate through the different tabs by clicking


77

Save the modification by clicking




3.4. Raw Material and Prodcom display



#

Main activities

Tips / Best practices

Key points

78

Enter MM03 for material display



79

Enter the material number and hit Enter



80

Select the views that you need to see.



81

Click .




3.5. Raw material and Prodcom suppression



#

Main activities

Tips / Best practices

Key points

82

Enter transaction MM06.



83

Enter the material number and hit Enter



84

Verify how many plants are associated with the article

To see the list, click on the box on "Plant" field.

a) To delete the material for only 1 plant, select the plant.
If the material needs to be deleted for all plants, leave the field blank.




#

Main activities

Tips / Best practices

Key points

85

Tick the Material checkbox if the material must be suppressed for all plants.



86

Tick the Plant checkbox if the article must be suppressed only for the designated plant.



87

Click changes button to confirm prior modifications made in the specific article



88

Update the reference SHORT NAME with *OBS* in the beginning of the text


Follow the Raw material and Prodcom modification chapter


4. CONTACTS


A new Raw material code can be requested by all users but if any problem is detected we can always ask for Data Administrators assistance. Check GDOC excel file with the contacts list.

5. SBS PERIMETER



Raw material and PRODCOM Codes

PIR/Contracts for Raw materials


Creation

Modification

Suppression

Creation

Modification

Suppression

SBS PERIMETER

Yes

Yes

Yes

Yes

Yes

Yes

SCOPE

WW

WW

WW

EU

EU

EU


6. REFERENCES


This procedure refers to the documents listed in below link:

7. ATTACHMENTS


Template that should be sent by requester with all mandatory info:


Template used to request Mass Creation of materials in WP2 to IS Team: