Tasks to be completed when documenting an operation (from creation to publication)1. Enter the Title of the operation / page2. Add the following Labels :
3. Fill in all fields as described above4. Name the title of each section using OPD methodology naming convention - Infinitive verb without the “to”, mainly action verb...something) - " I do something..."5. Once the description of the operation is completed, ensure it is approved and published by launching the SBS-Finance approval workflow |
| Domain: Country Accounting |
Responsibility area: N/A |
With the systems updated and products changes some materials code are not used in the operation anymore. Those materials code must be identified as obsolete and blocked to not be used accidentally in any process. This procedure has the objective to demonstrate how must it be done in the system SAP by the Finance team.
This procedure is applied to all companies from Brazil in WP2 system.
See Finance Glossary:
It's possible to check when need if there are materials that were turned obsoletes. These kind of control will help to avoid mistakes in the process.
How to do it:
Enter in SQ00 in WP2 system.
Go to Environment menu and select "Query areas":
![]()
Select "Costing":

Click twice in Z_ARTICLE and run![]()

In this section you will need to fill in the information you want to check:
![]()
![]()
Run ![]()
Check if 'Plant-Specific Material Status' is added in the layout.
As example it will be used plant 7524 from company code 7523.
You must look for material that starts with *OBS*, see below:
![]()
- Those materials are being reported as obsolete but its status still released for anyone to use.

They must be blocked until second order.
After identify what are the materials that need to be blocked, you have to effectively block it. To do so enter in transaction MM02 for each material selected, add Z0 at material status and flag 'Do not cost', save it
.
This way the material couldn't be used as system will show material blocked.
If you have many materials to change you can use a file created for massive changes.
To do a mass change in materials through the macro, you can following the steps below: