Change History
Instructions for creation of this document
Instructions for changing / updating of this document
Purpose
Process Flow
Process description
Process description - for DMO
1. New Material Code (no code presently in SAP)
1.1. Preliminary checks and request validation
1.2. Check for potential duplicates
1.3. Create material - MM01
2. Mass update MM17
3. Deactivate/activate MM06
4. List multiple Storage locations MMSC
5. Creating Plant views MM01 / Extending to another plant
5.1. Sales View
5.2. Purchasing View
5.3. Purchase Order Text view
5.4. MRP views
5.5. Work Scheduling view (not visible for ZROH)
5.6. Plant Data View
5.7. Warehouse mgmt. views
5.8. Quality management view
5.9. Accounting views
5.10. Costing Views
6. Creating material with reference
7. Validate/report/search
7.1. MM03 – view material master
7.2. MM04 – material based changes
7.3. ZCYMAT_QUERIES – view based report
7.4. MM60 – field report
7.5. ZCYMAT_CD – display changes
Appendixes
Appendix 1 – List of Plant Data Stewards for both Structural and Process Materials
Appendix 2 – Material Request form
Appendix 3 – Material Types
Appendix 4 – Material number ranges
Appendix 5 – Material type definition
Appendix 6 – Required Documentation for Material Maintenance Requests Based on the Type of Change



Purpose
This work instruction describes the process for maintaining (creation, changes) in SAP for the following material types including samples:
- Produced Materials;
- Procured Materials;
- Capitalized Spares for Projects;
- Spares (Repairs and Consumables, MRO);
- Service Items, Manufacturer Part Numbers;
- Non Stock Material;
- Returnable Packaging items;
- Non valuated


Process Flow
Finished Goods/Intermediates creation (Material Type: ZPRO)
Finished Goods/Intermediates change (Material type: ZPRO)

Factory Goods creation (Procured Materials) (Material type: ZROH, ZHBE, ZUNW, ZLAG, ZHRS)
Factory Goods change (Procured Materials) (Material type: ZROH, ZHBE, ZUNW, ZLAG, ZHRS)



Process description
Requestor (can be from various functions, for example R&D, planning, etc.) initiates business request and submits it to the Plant Data Steward depending on:
- Area of responsibility (to be determined by the type of material to be set up)
- Plant
Process step by step:
- Plant Data Steward and/or product steward submits a request to PSRA for MSDS (if required), HTS and ECCN codes.
- Plant Data Steward submits a request to Data Management (providing a filled out Request Form) to set up a global view (at this time the material is also temporarily blocked until all local views have been created). We make sure that there are no duplicates already existing in the system, and if all required data has been provided, set up the Global view as requested. Then the DM ticket is closed and the Plant Data Steward receives a notification that the Global view is completed.
- Plant Data Steward gathers all information required for the local views (using the Collection form).
- Plant Data Steward populates all the collected data for the local views.
- Plant Data Steward advises Manufacturing, QM, Procurement and Logistics that a new item has been created so they can set up additional data (BOMs, routings, inspection plans, QIR's, Source List, etc.)
- Once all additional data is created, the Plant Data Steward advises Finance that a new item was created.
- Finance runs Costing.
- Plant Data Steward then releases the block.
Data Governance is responsible for material maintenance process and its changes.


Process description - for DMO


New Material Code (no code presently in SAP)


Preliminary checks and request validation
- All requests to maintain (create, change) any material codes should come from and be approved by the appropriate Plant Data Stewards. Please check appendix 1 to validate requestor.
- Request form should be provided or approved by the plant data steward and attached to the request in Freshdesk ticketing s
ystem. Verify if all mandatory fields in the request form are filled out. In case if request form is missing mandatory data, put ticket on "waiting" status, return to the requestor and ask to take appropriate action.


Check for potential duplicates
Please refer to chapter 7.1
Validate/report/search

Create material - MM01

- Request for new material should mainly be received from Plant Data Stewards, in case if it comes from another person, an approval should be granted prior processing the request( please refer to the Plant Data Steward reference table in Appendix 1 – List of Plant Data Stewards for both Structural and Process Materials)
- Select transaction MM01
- Choose Industry Sector - Z CYTEC Industries
- Choose the appropriate material type (Cytec material types start with Z...)
- Select the appropriate views and press "Continue"
PLEASE NOTE! DM should only populate GLOBAL views – BASIC DATA 1, 2 and Classification
In case there is a need to populate PLANT views, please refer to the PLANT view instruction below.

- If GLOBAL views are selected, the System does not give a pop up window for indicating organization levels (PLANT/SALES ORG/WAREHOUSE etc.)
- If PLANT views are selected, the System will require to indicate organization levels (see below)
Basic Data View:

- Internal description – used for Cytec, maximum amount of symbols - 40 (has to be maintained for different languages, see below), must be populated for all materials entered in the system.
- Base UoM - Unit of measure in which stocks of the material are kept and managed. SAP converts all quantities in other (alternative) UoM to the base unit of measure. Cytec uses 5 BUoM - EA, KG, L, M, M2. Mandatory for all materials.
- Division – used to group materials and products. System uses divisions to determine the sales and the business areas. Cytec will have 4 divisions:- Aerospace, Industrial, In Process Separation (IPS), Additive Technologies (AT). Currently not used.
- X-plant matl status - restricts the usability of a material for all plants. Ensure that for new materials status is always BLOCKED (status 20 or 30, as requested).
- Material group - used to group materials with similar attributes.
- Prod. Hierarchy - string used for grouping together materials by combining different characteristics.
- Authorization group - this field dictates rules for handling of material and information in downstream development and operations.
- Gross weight - only for exporting purposes that include transportation costs, Purchasing and Sales views. Mandatory for all items. Not mandatory for Service (ZDEN), Non Stock Material (ZLAG) or Manufacturer Part Numbers Material (ZHRS).
- Net weight - weight of one unit of measure and is used for legal purposes in European countries as it shows up on the INTRASTAT. Mandatory for all items. Not mandatory for Service (ZDEN), Non Stock Material (ZLAG) or Manufacturer Part Numbers Material (ZHRS).
- Weight unit - always KG.
- External Description (Basic Data Text)
- For MATERIAL TYPE = PRODUCED finished good items, enter External Description
- For MATERIAL TYPE = PROCURED items with Trade Names other than the CEM internal description, enter Trade Name as External Description
- For other material types, enter N/A
- Mandatory field, up to 60 uppercase characters
- The field is populated in English for all materials across all Cytec locations
Basic Data text view is located in Additional Data:

- It is enough to add English description only, the rest languages will be added automatically when the material is Saved
- After the description is entered press „Main Data" to return to the Basic Data 1 view
- Additional Data - this view is where language specific descriptions can be added in Descriptions tab

- Material Description field serves as the "internal Cytec" description and must be populated for all materials entered into the system for languages – EN, DE, FR, IT, PT, ES

- Additional Units of Measure - this tab is where Conversion factors for Alternate UoM are maintained:
Please Note!
For all sold materials AUoM PER is mandatory
1 PER = 1 BUoM
If the Sales Indicator in Classification view is marked as SOLD, please enter AUoM – PER
To Exit 'Units Of Measure tab' press „Main Data"
- Classification is a cross application component in SAP that allows addition of attributes to master data objects and to hold that information to be used for reporting, searching, applying prices, print this information, etc.

- Choose „Material Class" or „Batch", press „Enter"

- It is possible to change Class Types by selecting the „Other Class Types" button
- It is possible to add Classes by pressing the „Multiple choice button"

- As soon as the multiple Choice button is selected , the System takes user to the selection screen, in order to view all Classes, press „Start Search":

- Select the necessary Class by double clicking on the Class name or selecting the Class name and pressing „Copy"

- Press „Enter" when necessary Class has been selected:

- Now it is possible to add Characteristics under any given Class
- The user can view all the available Characteristics under the „Multiple Choice" button
- Save the material by pressing „Save" button
Batch class is mandatory for ZROH materials (except packaging) and ZPRO materials (including packaging).
1 millimeter = 1000 micrometers

Mass update MM17
- Mass Maintenance of Material Master is performed when a common change needs to be made across a large number of materials
- Go to MM17
- Select „Fields" tab
- Search for the relevant Screen field name for the necessary field

- Select the relevant Description ( Screen field), press Execute

- Enter the material number(s), press Execute

- Enter the new value
- Press „Carry out mass change" button, press „Save"

- If changes have been carried out successfully, green Icon appears on the next Screen
- In case of any errors, the Icon will appear red and the user can validate the reason for the error by pressing „Details":


Deactivate/activate MM06
- Plant data Steward submits request to GBS if deactivation/reactivation is GLOBAL by coordinating with Local data stewards from MFG, Logistics, QM and FI
- If deactivation/reactivation is LOCAL, it is done by the plant data steward (by coordinating with Local data stewards from MFG, Logistics, QM and FI)
For global deactivation change the following values of the Material:
- X-plant Matl Status = 10 (field found on Basic Data 1 view)
- Plant Sp Matl Status = 10 (field found on MRP 1 view and on Purchasing view)
- MRP Type = ND (field found on MRP 1 view)
- Flag for deletion in MM06 for all plants
For local deactivation change the following values of the Material:
- Plant Sp Matl Status = 10 (field found on MRP 1 view and on Purchasing view)
- MRP Type = ND for the requested plant(s) (field found on MRP 1 view)
- Flag for deletion in MM06 only for requested plant(s)
Deactivation in MM06:
- Go to MM06
- Enter the material number ( additionally specific plant/ Stor.location/ Sales org./ Distr. Channel/ Warehouse Nr can be selected), press „Enter"

- Select the material to be set for deletion flag
- In case of removing deletion flag, the user should uncheck the box next to the Material number, press „Save"
P.S. It is possible to deactivate/activate materials for specific Plant/ Stor.location/ Sales org./ Distr. Channel/ Warehouse Nr, that is usually performed by the Plant Data Steward

List multiple Storage locations MMSC


- In order to list multiple Storage locations to specific material/plant combination, indicate the material number, plant and select: „list extendable storage locations only", press – „Enter"

- The System gives already listed Storage Locations and user can add additional ones that are assigned to the plant, press „Save"
Creating Plant views MM01 / Extending to another plant
The process of creating plant views and extending to another plant are very similar – both are performed using MM01 and the user has to select the Plant Views + Organizational levels!
- In MM01 enter the existing material number, Industry sector, Material type, press „Enter"
- Select Plant Views, press „Continue":


- Indicate the relevant Plant/Stor.Location/Sales org./Distr. Channel/Warehouse No.
- In case the material has to be extended to another plant – user should indicate the new plant number
- Press Execute
Following chapters will cover each plant view separately and provide defaulted values as a reference.

Sales View


- Availability Check
- The Default value for this field for types ZPRO, ZLEH and ZROH is - Z2
- Else = KP
- Batch Management
- See template
- This field is repeating also in Purchasing, Plant Data and Warehouse Mgmt 1 views
- Transportation Group
- Choose from the list (see template)
- Loading Group
- The Default value for this field is – Z001
- Profit Center


Purchase Order Text view
- Purchase Order Text – enrich if available for Capitalized Spares (ZUNW), Spares (ZHBE) or Returnable Packaging (ZLEH) Material

MRP views



MRP Group- If Procurement Type = 'E' then Z040
- If Procurement Type = 'F' then ZDRT (for ZROH materials)

ABC indicator – default to C or enter as indicated in the template- MRP Type
- For ZROH, ZPRO – the Default value is PD
- For ZUNW, ZHBE, ZLEH – the Default value is ND

Reorder Point – insert from template- MRP Controller

– choose from the list (see template) 

Lot Size – the Default value is EX
Minimum Lot Size – please leave this field BLANK
Maximum Lot Size – please leave this field BLANK- Fixed Lot Size – please leave this field BLANK

Maximum Stock Level – please leave this field BLANK
Assembly Scrap % – please leave this field BLANK

- Procurement Type
- If produced in this plant, default to 'E'
- If procured (see scenarios below), default to 'F'
- If both produced and procured, DO YOU PRODUCE PRODUCT more often In-House?
- If Yes, default to 'E'
- If No, default to 'F' (for ZROH materials)
- For ZUNW, ZHBE or ZLEH – the Default value is F with the exception of R&D Samples where it is E
- Special Procurement Type
- If Procurement Type = 'E' and
- Phantom – the Default value is 50
- Else Default is BLANK
- If Procurement Type ='F' and product is procured from
- External vendor – Default to BLANK
- Vendor consigned – the Default value is 10
- Sub-contractor – the Default value is 30
- From any physical locations under Heanor 1, Heanor 4, Manchester or Tulsa – select from list of SAP plants separated by '/' if multiples
- Cytec plant not on SAP – default to BLANK
- Backflush
- If material is Batch managed – leave Backflush BLANK
- If material is NOT Batch managed – value may be necessary
- Batch Entry – please leave this field BLANK
- Production Storage Location – please leave this field BLANK. If available by MFG or LOGISTICS, provide location.
- Storage Location for EP
- For all ZPRO Materials this value should be set to 0002
- For all ZROH, ZHBE Materials this value should be set to 0001
- For all ZUNW or ZLEH Materials the Default value is 0
- For 2065 (Broken Arrow only) – please select 0001
- For 2070 (United Frozen Storage) – please select 0002
- In House Production – the Default value is 0
- GR Processing Time in Days (duplicate from Purchasing view) – the Default value is 1
- Sched. Margin Key – the Default value is 000
- Planned Delivery Time – number of calendar days needed to obtain the material if it is procured externally
- If Procurement Type = 'F' (Procured) at this plant, enter a value in calendar days. Value must be greater than 0.
- If Procurement Type = 'E' (Produced) and sub contracted at this plant (special procurement type = SUBC/30), enter a value in calendar days. Value must be greater than 0.
- If information is unavailable, the Default value is 1.
- Safety Stock – if available, use the value; otherwise leave blank
- Minimum Safety Stock – if available, use the value; otherwise leave blank
- Safety Time indicator – defines whether the safety time is only to apply to independent requirements or to all requirements. Enter as requested.
- Safety time/act.cov. - enter number of workdays by which the requirements are to be brought forward (if requested).

- Period Indicator – the Default value is M
- Strategy Group – the Default value is 40
- Consumption Mode – please leave this field BLANK
- Fwd Consumption Per – please leave this field BLANK
- Bwd Consumption Per – please leave this field BLANK
- Total Replenishment Lead Time – BLANK except for ZPRO with Procurement type = E and Special procurement key = BLANK – value exists.

- Method for Selecting Alternative Bills of Materials
- For ZPRO with Procurement Type = 'E' and Special procurement key = BLANK, default this value to 3, else BLANK.
- If Material is a Phantom Material (Procurement Type = E, Special procurement key = 50), then this should be kept BLANK

Work Scheduling view (not visible for ZROH)

- Unit of Issue
- If Base Unit of Measure = M2, then the Default value is M
- If the Unit of Issue is different than the Base Unit of Measure then populate accordingly
- Under Delivery Tolerance – the Default value is 10
- Over Delivery Tolerance – leave this field Blank
- In House Production Time – leave this field Blank
- Production Unit – if Base Unit of Measure = M2, then the Default value is M
- Production Supervisor – if Procurement Type = F, then Default = 999. If Procurement Type = E choose from table below
- Production Scheduling Profile – if Procurement Type = F, then Default = 999. If Procurement Type = E or Procurement Type = X choose from table below
- OB Management – value "1" only for ZPRO and ZROH whenever Batch Management is active

Production Supervisor – choose from table ONLY if the Procurement Type = E:
Plant | Prod Superv. | Prod Scheduler | | Plant | Prod Superv. | Prod Scheduler |
|---|
2010 | 103 | MTS- TC1 | | 2040 | 104 | MTS- TC2 |
2010 | 104 | MTS- TC2 | | 2040 | YB2 | MTS PI valuated |
2010 | YB2 | MTS PI valuated | | 2045 | 104 | MTS- TC2 |
2015 | 101 | MTS-ITAR | | 2045 | YB2 | MTS PI valuated |
2015 | 103 | MTS- TC1 | | 2050 | 104 | MTS- TC2 |
2015 | 104 | MTS- TC2 | | 2050 | YB2 | MTS PI valuated |
2015 | 106 | MTO-ITAR | | 2055 | YB2 | MTS PI valuated |
2015 | 108 | MTO-TC1 | | 2065 | YB2 | MTS PI valuated |
2015 | 109 | MTO-TC2 | | 2070 | YB2 | MTS PI valuated |
2015 | YB2 | MTS PI valuated | | 2075 | YB2 | MTS PI valuated |
2020 | 102 | MTS-EUML | | 2085 | YB2 | MTS PI valuated |
2020 | 103 | MTS- TC1 | | 2090 | YB2 | MTS PI valuated |
2020 | 104 | MTS- TC2 | | 2095 | 102 | MTS-EUML |
2020 | YB2 | MTS PI valuated | | 2095 | 103 | MTS- TC1 |
2025 | 104 | MTS- TC2 | | 2095 | 104 | MTS- TC2 |
2025 | YB2 | MTS PI valuated | | 2095 | 105 | MTS-TAA |
2030 | YB2 | MTS PI valuated | | 2095 | YB2 | MTS PI valuated |
2035 | 104 | MTS- TC2 | | 2100 | 104 | MTS- TC2 |
2035 | 109 | MTO-TC2 | | 2100 | YB2 | MTS PI valuated |
2035 | YB2 | MTS PI valuated | | | | |


Production Scheduling Profile – choose from table below, ONLY if the Procurement Type = E or Procurement Type = X:
Plant | Prod Profile | Description | | Plant | Prod Profile | Description |
|---|
2010 | YB0002 | MTS Process Manufacturing | | 2045 | YB0002 | MTS Process Manufacturing |
2010 | ZSTC1 | MTS- TC1 | | 2045 | ZSTC2 | MTS- TC2 |
2010 | ZSTC2 | MTS- TC2 | | 2050 | YB0002 | MTS Process Manufacturing |
2015 | YB0002 | MTS Process Manufacturing | | 2050 | ZSTC2 | MTS- TC2 |
2015 | ZOITAR | MTO-ITAR | | 2055 | YB0002 | MTS Process Manufacturing |
2015 | ZOTC1 | MTO-TC1 | | 2065 | YB0002 | MTS Process Manufacturing |
2015 | ZOTC2 | MTO-TC2 | | 2070 | YB0002 | MTS Process Manufacturing |
2015 | ZSITAR | MTS-ITAR | | 2075 | YB0002 | MTS Process Manufacturing |
2015 | ZSTC1 | MTS- TC1 | | 2085 | YB0002 | MTS Process Manufacturing |
2015 | ZSTC2 | MTS- TC2 | | 2090 | YB0002 | MTS Process Manufacturing |
2020 | YB0002 | MTS Process Manufacturing | | 2095 | YB0002 | MTS Process Manufacturing |
2020 | ZSEUML | MTS-EUML | | 2095 | ZSEUML | MTS-EUML |
2020 | ZSTC1 | MTS- TC1 | | 2095 | ZSTAA | MTS-TAA |
2020 | ZSTC2 | MTS- TC2 | | 2095 | ZSTC1 | MTS- TC1 |
2025 | YB0002 | MTS Process Manufacturing | | 2095 | ZSTC2 | MTS- TC2 |
2025 | ZSTC2 | MTS- TC2 | | 2100 | YB0002 | MTS Process Manufacturing |
2030 | YB0002 | MTS Process Manufacturing | | 2100 | ZSTC2 | MTS- TC2 |
2035 | YB0002 | MTS Process Manufacturing | | 4055 | YB0002 | MTS Process Manufacturing |
2035 | ZOTC2 | MTO-TC2 | | 2035 | ZOTC2 | MTO-TC2 |
2035 | ZSTC2 | MTS- TC2 | | 2035 | ZSTC2 | MTS- TC2 |
2040 | YB0002 | MTS Process Manufacturing | | 2100 | ZSTC2 | MTS- TC2 |
2040 | ZSTC2 | MTS- TC2 | | 2045 | ZSTC2 | MTS- TC2 |

Plant Data View


- Storage Bin (Issue Pending) – please leave this field BLANK. If Material Type = MRO, input the Storage Bin Number associated with the item.
- Container Storage (Container reqmts) – please leave this field BLANK
- Physical Inventory Indicator for Cycle Counting – for all IM Materials default ='B' or as indicated on template
- CC Fixed – please leave this field BLANK
- Label Type – if GLOBAL field "Sub Batch Config" is set, then default to 'M7', otherwise default to 'M6'
- Label Form – the Default value E1
- OB Management
- The Default value is 1
- Please leave this field BLANK for materials that are not Batch Managed (see template)
- For ZUNW/ZHBE/ZLEH – please leave this field BLANK
- Batch Management – see template
- Storage Conditions
- For ZPRO the Default value is 20
- For ZROH the Default value is 10
- For ZUNW/ZHBE/ZLEH the Default value is 0
- Haz Material Number – please leave this field BLANK
- Min. Rem. Shelf Life – if Total Shelf Life is greater than 0, the Default value is 1
- Total Shelf Life
- Select Month to Days conversion from list
- If "infinite days", default to '7300'
- Period Indicator for SLED – default to Days
Warehouse mgmt. views

- Unit of Issue – if Base Unit of Measure = M2, then default to M
- Picking Storage Type – please leave this field BLANK
- Hazardous Material Number – please leave this field BLANK
- Storage Type Ind. for Stock Removal – if B Management is BLANK, then default to '001', otherwise, default to '002'
- Storage Type Ind. for Stock Placement – OB Management is BLANK, then default to '001', otherwise default to '002'
- Bulk Storage Indicator – please leave this field BLANK
- Special Movement Indicator for Warehouse Management – please leave this field BLANK
Please note Storage Strategies section is visible only if Warehouse Number is filled in selection screen of Organizational Levels.

Quality management view

- QM material auth. Group – should be the SAME as in Basic Data
- Documentation Required – if QM necessary, the Default value is √
- Inspection Interval – see template
- QM in Procurement is Active – if product is externally procured by plant or Procure Type is 'F', default to √. Otherwise BLANK.
- Control key for Quality Management in Procurement:
- If "QM in Procurement is Active" field = √ and you don't want to implement procurement controls in the current plant, select '0000'
- Select Z930 to enable Quality Cert requirement, Invoice blocking (until it moves out of QI stock), No Document Control
- Certificate Type
- Select E21 (COC) if the document in which the manufacturer declares that the products supplied are in compliance with the requirements of the order, without inclusion of test results.
- Select E31 (COA) if the document issued by the manufacturer in which he declares that the products supplied are in compliance with the requirements of the order and in which he supplies test results.

- Please mark the Types as ACTIVE
- Enter Average inspection duration
Inspection Type | Description | Criteria for Selection |
01 | If the Material will have a Goods Receipt | If the ZPRO Material can be sub-contracted |
03 | If the Material just got Manufactured and needs to be inspected | If ZPRO Material |
04 | If the Materials is currently getting Manufactured and needs to be inspected | IF ZPRO Material |
09 | If it will be in stock over a period of time and may need re-inspection | If ZPRO Material |
For Inspection types 01, 04 & 09 average inspection duration needs to be entered by the user. The other settings are Default and will be populated automatically.
Maintain 01 and 09 for Raw materials.
Inspection Type | Description | Criteria for Selection |
01 | If the Material will have a Goods Receipt | For all ZROH Materials |
09 | If it will be in stock over a period of time and may need re-inspection | If ZROH Material |
For Inspection types 01 & 09 average inspection duration needs to be entered by the user. The other settings are Default and will be populated automatically.
ZHBE/ZLEH – for Structural Materials Quality Management Data view should not be created

Accounting views

- Valuation Class
- P001 – If ZROH item is a raw material
- P003 – If ZROH item is a packaging and empty
- P004 – If ZROH item is a trading good
- P002 – If ZHBE item is a Spare part/MRO
- S001 – If ZDEN item is a service item
- M001 – If ZPRO item is a semi-finished product
- M002 - If ZPRO item is a finished product
- Material Price Determination
- For ZPRO and re-sale ZROH* the Default value is 3
- For ZHBE and ZROH the Default value is 2
- For ZDEN the Default value is BLANK
PLEASE NOTE FOR ZROH: Please change Price Determination to 2 for all materials except Re-sale Items. If saved by mistake, please notify the FI team to change via CKMM. Once entered, this will be un-editable via material master.
- Standard Price – fill from template
- Price Unit – defaulted to 1
- Price Control Indicator
- For ZPRO, ZDEN and re-sale items the Default value is S – Standard price
- For ZROH, ZHBE the default value is V – Moving average price
PLEASE NOTE FOR ZROH: Please change Price Control Indicator to V for all materials except Re-sale Items. If saved by mistake, please notify the FI team to change via CKMM. Once entered, this will be un-editable via material master.
- Future Price – fill from template
- Previous Price –leave this field BLANK
*re-sale ZROH – value RESALE MATERIAL - Purchased Finished Good in Material Planning Subtype field in Classification
Costing Views


With Quantity Structure – the Default value is √- Material Origin – the Default value is √
- Costing Lot Size – represents a typical run size for a manufactured product:
- If ZROH, the Default value is 1
- If ZPRO and Procurement Type 'F', the Default value is 1
- If ZPRO with Procurement Type 'E' and everything else – lot size is required
Materials can be created using reference material (already existing one). The system will copy all the information from the old to the new one except:
- Quality management 'Inspection Setup' checkmark
- Buyer group

- Go to MM01
- Indicate "Industry Sector" and "Material Type" and "Copy from.."
- Select material views
- Select organizational levels to be copied


Validate/report/search


MM03 – view material master
- By pressing multiple choice button, user receives pop-up window with search options for material master


- Insert the search value in * * to get the exact value or wording in any description or numbering in the System, whether that is a part of a larger description or wording or the exact same

- Select the necessary value and press "Copy"

In order to Search material by any value in the Classification view, please use "Materials for Class" search option.
First of all the user has to know which Classification class contains the necessary value, e.g., "Old Material number" is in Engineering Class – ZCYMC_ENGR_MAT - Select "Materials for Class" search option
- Select the relevant Classification Class and Class type 001

- Insert the look-up value in * * and select "Find in initial class". The system will give out search results in the box below


MM04 – material based changes
- Enter material number (additional Plant/sales org etc. Specifications can be indicated)
- View all changes performed in the mateiral
- Double click on an entry to view values/text changed


ZCYMAT_QUERIES – view based report


- By changing the 'Extended program name' (see list of program names below) you can get a report on different views of the material
- Enter the material number(s) and press "Execute"
List of program names:

ZDM_MAT_QUER10Texts
Exporting the report
- Export in word document, please use "Create document" option* Export in .txt, .html etc. formats* Export in Excel, please do not use second option

MM60 – field report

- MM60 - Materials List - used to display a list of materials based on the values entered.
- For Riga and Plant Enablers(limited number of fields)
- Materials can be searched as based on material number, plant number, type, group, created by
- By setting the 'Valuated materials only' checkmark, only materials with Accounting and Costing will be displayed
!worddavdf2027bc7f8c4c6ecc059cebbc158305.png|height=191,width=180!Export to excel

ZCYMAT_CD – display changes

- Used to look at changes in materials in bulk as based on a specific date
- Also can be used to view a change report for a specific material by indicating the Object ID or by entering the material number with a «*» in front of it


Appendixes


Appendix 1 – List of Plant Data Stewards for both Structural and Process Materials
IM
| Co.Cd. / Sales Org. | | ZPRO; ZDEN | ZROH; ZUNW; ZHBE; ZLAG |
Structural Materials | 1237 | Tulsa | Shannon ParkersonPatrick Lightsey Vanessa Gonzalez | Laura Testa Chazz Pelfrey Clint Baker (backup) |
| | | | |
| | | | |
| 7218 | Heanor | Alexandra WheatleyJames Taylor Graham Hill Lauren Kavanagh | James Taylor Graham HillAmanda Brown Lauren Kavanagh (requests can be accepted from Alexandra Wheatley) |
| | | | |
| | | | |
| 7223 | Manchester | | |
| | | | |
| | | | |
Process Materials | 1246 | Santa Fe Springs | Jennifer DominguezTracy Ng Gilbert Alvarado Mehrdad Nikamalfard Demitri Wimalaratne Caleb Lin | Jennifer DominguezTracy Ng Gilbert Alvarado Mehrdad Nikamalfard Demitri Wimalaratne Caleb Lin |
| | | | |
| | | | |
| 7250 | Keighley | Alan Fothergill Marie Woodhouse | Alan FothergillMarie WoodhouseMelanie Greenfield |
| | | | |
| | | | |
| 7252 | Toulouse | Guillaume Garnier | Guillaume Garnier |
| | | | |
| | | | |
| 7257 | Mondovi | Andrea PeanoCristian Vallazza Gianni Ronco | Andrea PeanoElena Vinai |
| | | | |
| | | | |

Appendix 2 – Material Request form


Appendix 3 – Material Types
Material Types | | | | | | | | Available Views |
Produce Material (ZPRO) | Procured Material (ZROH) | Capitalized Spares For Projects (ZUNW) | Spares (Repairs and Consumables, MRO) (ZHBE) | Service Items (ZDEN) | Manufacturing Part Number (ZHRS) | Non Stock Material (ZLAG) | Returnable Packaging (ZLEH) | |
| | | | | | | | Sales |
| | | | | | | | Purchasing |
| | | | | | | | MRP |
| | | | | | | | Forecasting |
| | | | | | | | Work Scheduling |
| | | | | | | | Accounting |
| | | | | | | | Costing |
| | | | | | | | QM |
| | | | | | | | Plant / St. Loc. |
| | | | | | | | Import |
| | | | | | | | Export |
| | | | | | | | WM |
| | | | | | | | EHS (N/A) |
| | | | | | | | Label (N/A) |
| | | | | | | | Quantity Update |
| | | | | | | | Value Update |

Appendix 4 – Material number ranges

Appendix 5 – Material type definition
Description | Material Type Definition | |
| | |
Produced Materials (ZPRO) | Finished Goods and Intermediate items Valuated = Yes Tracked in Inventory = Yes | |
Procured Materials (ZROH) | Raw Materials, Re-sale Items, Packaging (included in Production BOM) Valuated = Yes Tracked in Inventory = Yes | |
Non-Valuated Materials (ZUNW) | Non-Valuated Materials, such as Capitalized Spares for Projects, with inventory tracking. Valuated = No Tracked in Inventory = Yes | |
Spares (Consumable Supplies, MRO) (ZHBE) | MRO (Maintenance/Repair/Operating) materials, Consumable Supplies, Engineering Spares, etc. Valuated = Yes Tracked in Inventory = Yes | |
Service Items (ZDEN) | Services provided to customers, such as Annual Fee in MSA contracts, Miscellaneous Charges, Testing Fee, etc. Valuated = Yes Tracked in Inventory = No | |
Manufacturer Part Numbers (ZHRS) | Used by Procurement & Quality; Manufacturer Part Number materials are set up as children assigned to Parent Raw Materials; created to manage manufacturer contracts Valuated = No Tracked in Inventory = No | |
Non-Stock Material (Consumable Supplies, MRO) (ZLAG) | MRO (Maintenance/Repair/Operating) materials, Indirect (non-production/non-BOM) procured materials, such as Office Supplies and other Consumable Supplies Valuated = No Tracked in Inventory = No | |
Returnable Packaging (ZLEH) | Returnable Cylinders Valuated = No Tracked in Inventory = Yes | |
Appendix 6 – Required Documentation for Material Maintenance Requests Based on the Type of Change
Type of set up/change | Plant data steward approval required? | Required documentation/information | Responsible party |
Finished Good / Intermediate creation (Global Views) | YES | Request form | DMO |
Factory Good (Raw Material) creation (Global Views) | YES (except for Heanor and Manchester) | Request form | DMO |
Material extension to plants | YES | Collection form | Plant Stewards |
Material Global view specific field changes (Material Group; Resin Type; Resin Name; Reinforcement Type; Fiber Twist; Fiber Tow Size; Fiber Sizing; Recommended Storage Statement; Resin Lot Definition; Fiber/Fabric definition; Material Planning Subtype) | YES | Request form | DMO |
Material Global view specific field changes (any other fields not mentioned in the p. above) | YES | Request form | DMO |
Alternative Units of Measure (conversion change) | YES | Conversion expressed in format of Base UoM vs Alternative UoM | DMO Procurement and Pricing to be informed |
Alternative Units of Measure (adding an additional/missing UoM) | YES | Conversion expressed in format of Base UoM vs Alternative UoM | DMO |
Material extension (to storage locations) | YES | Plant and location numbers | Plant Stewards / DMO |
Manual / Automatic Mass Changes | YES | Mass Change Request form | DMO |
Any Local view field changes that involve default values per Job Aid (if the field is currently blank). | NO (but they need to be informed) | No documentation required | DMO |
Description change | YES | Request form | DMO |