1. INTRODUCTION

1.1 Objective of this IOP


This procedure has the purpose to help Data Control in the process to check if all updated performed directly, in Master Data, Customers and Vendors are justified by external users, respecting Data & Analysis procedures.


1.2 Scope

This OP applies to manual activities to non authorized users in master data.

2. MAIN PARTS

Responsibilities and description of the steps to follow.

2.1 Responsibility (who does what)

Data Controllers - check if all updated performed directly, in Master Data

2.2 Procedure

 

Trigger

Verification through the transaction ZZR_CUS_VEND_LOG_CH2 of what were the actions performed in the previous working day beyond the data controllers (belonging to D&A teams in all SC sites). This control is to be made for the key fields:

  • Bank data;
  • Activation of customers or vendors;
  • Transfer links;



 

Checks

This OP explains how to extract information and how to check and confirm that the updates were properly executed. And if needed, to revert the actions performed together with the warning to the users not performing valid updates. 





 

Checks

Use Transaction ZZR_CUST_VEND_LOG_CH2
 
  
 
Select icon 

Select the first variant for the control of PRS data - PF1_050

Select the second variant for the control of PF1_020 and PI1_020 

Select the third variant for the control of WP1_400 




 

The procedure is the same for Vendors and Customers 





  • Choose the Variant
  • Only need to choose between Vendors or Customers (all the other options should remain as in the variant)
  • Press 

                  





List retrieved by system





Select  Print Preview

List is screen





Select Spreadsheet

Save





Excel file retrieved





Save file as type Microsoft Office Excel Workbook with name:

  • PRS Output DDMMYYYY.xls (for PRS vendors and customers*);
  • Pf1_020 Output DDMMYYYY.xls (for PF1_020, PI1_020 and WP1_400 vendors and customers*)






perform the same extraction twice – 1 for vendors and 1 for customers and gather both outcomes in these single files for PRS and for PF1_020 (+ PI1,+ WP1).


 

Corrective Actions:

  • In case of non SBS authorized user send an email [containing attached report extracted] to the user requesting documentation or justification of the action(s), using the following template:

  • Revert the update performed (in case it is PRS)
    In case of update in one of the target systems (PF1_020, PI1_020 or WP1_400) run the IDOC transport transaction Z2RA (vendors) or Z2R8 (customers) to transfer the master data from PRS to the target systems, thus overwriting any local update by the data from PRS (thus following the Solvay Group rules).

Reports Storage

Such reports are to be stored in an accessible storage location to be retrievable in case of need. They are kept in GDrive shared folder: PRS External Users