Below are the definitions for the P2P (Purchase to pay) Key Performance Indicators from the BW "RCS P2P KPI" workbook.

% PR items created via MRP

Indicator% PR items created via MRP
StreamP2P
Process / Sub-process Procurement
Target 100 % 
Expected Evolution ↑

Definition


 An NB type requisition should not be created from scratch.
If it is created through MRP, item creation ind should be :
= B (created straight from MRP run)
or
= U (converted from planned order to requisition, by MRP planner)

Good practice

This is available for Requisitions for stock, not created by APO or OTC or PP or PM
This naturally exclude requisitions frim BIP (PR type for those is EC, not NB)

Calculation

Calculate % of requisition, on the total, that have creation indicator = B or U

Analysis Axis

% of PO item created in auto

Indicator% of PO item created in auto
StreamP2P
Process / Sub-process Procurement
Target 100 % 
Expected Evolution ↑

Definition

After a Purchase Requisition for material has been assigned to a source of supply,
if vendor master data authorize in purchasing view (which is usualy the case), and if material master data authorize in purchasing view, the procurer can run a transaction (or let a job do so) to create automaticaly the PO.

Good practice

Generalize auto PO creation

Calculation

Target

100 % for Standard Purchase Order (NB) and Stock Transport Order (UB) type with item category Standard (0) or Consignment (2) or Suncontracting (3) or Stock Transfer (7)

Analysis Axis

% of PO with source of supply

 

Indicator% of PO with source of suplly
StreamP2P
Process / Sub-process Procurement
Target 100 % 
Expected Evolution ↑

Definition

A price should not be entered manualy in a PO.
It should come from a source of supply (previously assign to the requisition)
The source of supply of a PO item is the Inforecord Or the contract (or both) that we can see in the item synthesis tab

Good practice

A Purchase Requisition is created (with or without material code)
  then assigned to a source of supply
  then treated into PO (possibly automatically : see other indicator)
==> as a result, we must find an info record or contract or both in PO item.

Calculation

Analysis Axis

Nb of 309 mvt type

IndicatorNumber of 309 mouvement types
StreamP2P
Process / Sub-processLogistic
Target0
Expected Evolution ↓

Definition

movement type 309 allow you to transfer stock from a material A to a material B.
this is not a best practice to do so.
Still, in some cases, we cannot do another way.
Still, stock value differences must not be important

Good practice

as few 309 movement as possible
as few values invloved in these movements.

Calculation

Analysis Axis