Tasks to be completed when creating an operating procedure (from creation to publication)
Domain & Process using the List of labels to be used in the PtP space
By default the table of contents displays Heading 1 & Heading 2 (other levels can be added)
1. Remove the icon(s) when not applicable
2. Add countries when the procedure is for a specific country (optional)
3. Remove the icon(s) when not applicable
4. Add the link to SAP procedures (when it exists)
5. Add the link to attachments (to be stored in AODocs or GDrive) or external links
This OP explains the steps necessary to update the confirmation control - ARIBA NETWORK
Maintained in WP1_400 and PF1_020