This document describes the full procedure related to contract and PIR maintenance in SAP WP1 system. It’s a revised version from previous working instructions (Work Instruction - PUR - SAP - 02 & PIR Maintenance).
For Technology Solutions, requests can be performed by buyers and planners from each plant and for Composite Materials PIRs, Source Lists and Contracts can be modified and created by site Buyers (Strategic RM buyers. Planners can not (and should not) make changes themselves, but turn to buyers or us for that.
All requests are sent to Data Operations team via FreshDesk
Under Riga SBS Data Operations scope is the management of Contracts, PIRs and Source Lists for all Technology Solutions and Composite plants.
Abbr. | Description |
SBS | Solvay Business Services |
HSE | Health, Safety and Environment |
DG | Dangerous goods |
MRP | Material Resource Planning |
UoM | Units of Measure |
PIR | Purchasing Info Record |
STO | Stock Transfer Order |
| SL | Source lists |
Prior to submitting a new Contract/PIR/SL request, it is the requester’s responsibility to ensure the contract/PIR/SL does not exist in SAP already, so no duplicates are created in the system. If the contract/PIR/SL was not found, a request should be submitted to Data Operations for its set up in SAP. A second search in the system is performed by the Data Operations team to ensure no duplicates are created.
Purchase Info Record (PIR) is a method of managing the purchase price. An alternate management method is a contract. When a contract exists, then the PIR should not be used for the same material. A new PIR is created when a purchase from a new material/supplier combination is needed. Within the PIR there is another unique combination named Purchasing Org. Data, formed by the combination of the Purchasing Org., Info Category and Plant Code. If one of those elements is changed, this results in a new record within the PIR. In the PIR’s General View the global fields are available. These fields determine the information common to all plants using the material/supplier combination. The PIR’s maintenance is the responsibility of the Buyer. Any information missing in the ZERS form (approved by the Buyer) and necessary in the PIR should be completed by them.
PIRs are created when we have STO, consignment PO or a subcontracting contract.
We have 4 types of PIR:
Standard - Specifies that the info record is used only in connection with standard purchase orders. This is the most ordinary PIR type and is the one used for STO.
Subcontracting - Specifies that the info record is used only in connection with subcontract orders.
Pipeline - Specifies that the info record is used specifically for pipeline withdrawals.
Consignment - Specifies that the info record is only used in the case of consignment withdrawals.
In order to create new PIR we will need the following information:
Vendor
Plant
Price
Main activities | Tips / Best practices | Key points |
Enter transaction ME11 | T-code can be entered directly in Command field. T-code can be saved in Favorites. | |
Vendor | Information provided in the request | |
Material | As informed | |
Purchasing Organization | Information may change depending on the plant region/type of order | If not informed, you can find on Appendix 4 |
Plant | Information provided in the request | |
PIR category | If not informed choose Standard | |
Press enter |
Main activities | Tips / Best practices | Key points |
Enter Vendor Material Number | Optional info | |
Enter Salesperson | Optional info | |
Enter Telephone | Optional info | |
Enter Order Unit | Change if requested | |
Go to Purchasing Organization Data 1 view | Pressing Enter will move you to Purch. Org. Data 1 |
|

Main activities | Tips / Best practices | Key points | ||||||||||||||||||||||||||||||
Enter Planned Delivery Time | If pre-populated with a value lower than 5 days, update to 5 days | |||||||||||||||||||||||||||||||
| Enter Purchasing group | For PIR/SL/Contract creations we have to look for RM Buyers | Composite Materials: Should be the buyer’s group, can be checked in the file For US based STOs (where receiving plant is US based such as Rock Hill or Piedmont) - FJ0 Note! For packaging materials the purchasing group is defined based on the material group. In order to determine the correct code, refer to tabs: EU (Europe) Packaging or NA (North America Packaging, based on the plant location for which PIR is created. | ||||||||||||||||||||||||||||||
Enter Standard Quantity |
| Always 1 if no special requests | ||||||||||||||||||||||||||||||
Enter Tax Code | Check location of plant and Vendor | Other countries
Europe
| ||||||||||||||||||||||||||||||
| Import procedure | Applicable for European plants only (Please refer to table above) | If the plant that you are creating the PIR is in the same country of the supplier, no import procedure is required. If the plant that you are creating the PIR is in different country of the supplier then import procedure is required based on vendor's location | ||||||||||||||||||||||||||||||
Enter Net Price | As requested | |||||||||||||||||||||||||||||||
Incoterms 1 and 2 | Technology Solutions: Add if requested, otherwise keep it blank Composite Materials: Mandatory, if not provided go back to the requester. | |||||||||||||||||||||||||||||||
Confirmation Control Key (CCK) | Check Incoterms
| Technology Solutions: If Incoterms are COL - always Z003, (exception if going from Kemira to Kemira’s plant 8543 then blank). Composite Materials: If it is an import (Tax code AS) then Z004 , if domestic (Tax code LN) and Incoterms are COL then Z003 | ||||||||||||||||||||||||||||||
| GR-Bsd IV | Always checked | |||||||||||||||||||||||||||||||
| Ackn. rqd | Always checked | |||||||||||||||||||||||||||||||
Go to Conditions view |
|
|

# | Main activities | Tips / Best practices | Key points |
20 | Update the validity period |
| Technology Solutions: The validity period to be used is 31.12.2025 |
21 | Click on (save)
|
|
|
When in conditions we are able to add Scales related to the price of the material.
Some items we can have discounts when we buy in a higher quantity.
Main activities | Tips / Best practices | Key points |
Select the price line |
| |
Click on Scale |
|
|
Main activities | Tips / Best practices | Key points |
Add the scale quantity |
| |
Add price for new quantity |
|
|
Save it |
For Stock Transfer Orders we have 2 types:
When creating a STO (Stock Transfer) PIR, we need to delete the condition in order to the correct price reflect for the item.
NOTE: ALL STO PIRs ARE CREATED FOR PURCHASING ORGANIZATION 3200, NO NEED TO UPDATE THE “VALID TO” IN THIS CASE.
After saving the new PIR, go back to the conditions and follow the procedure below:
Main activities | Tips / Best practices | Key points |
Select Price line | ||
Delete | Confirm deletion | |
Save it | As informed |

Main activities | Tips / Best practices | Key points |
Condition type | FRB1 | |
Price | As informed | |
Currency | As informed |
Main activities | Tips / Best practices | Key points |
Enter transaction ME1M | T-code can be entered directly in Command field. T-code can be saved in Favorites. | |
Vendor | If informed, otherwise keep it blank | |
Material | As informed | |
Purchasing Organization | If informed, otherwise keep it blank | |
Plant | If informed, otherwise keep it blank | |
Click on
|
Main activities | Tips / Best practices | Key points |
Select PIR |
|
|
Press Change Info Record |
|
|
Main activities | Tips / Best practices | Key points |
Go to Conditions |
Main activities | Tips / Best practices | Key points |
Single click on the valid period | ||
New with reference |
Main activities | Tips / Best practices | Key points |
Validity From | As informed, other wise current date | |
Valid to | if not informed, end of current year | |
Amount | As informed | |
Per | As informed | |
Price Unit of measure | As informed | |
Save it |
Main activities | Tips / Best practices | Key points |
Enter transaction ME12 or ME1M as on Change section | T-code can be entered directly in Command field. T-code can be saved in Favorites. | |
Vendor | Information provided in the request | |
Material | As informed | |
Purchasing Organization | As informed | |
Plant | As informed | |
PIR category | If not informed choose Standard | |
Press enter |
Main activities | Tips / Best practices | Key points |
Purchasing Group | E00 | |
Extras > Deletion Flags | Shift + F12 |
Main activities | Tips / Best practices | Key points |
Complete info record | Flag if Full PIR should be deleted | |
Purch. Org. Data | Flag if only plant/p. Org data should be deleted. | |
Go to Conditions |
Main activities | Tips / Best practices | Key points |
Double click on the valid period |
Main activities | Tips / Best practices | Key points |
Validity To | Date in the past | |
Save it |
A source list is needed every time a new contract is created, a new line is added in an existing contract or when a PIR is created.
Main activities | Tips / Best practices | Key points |
Enter transaction ME01 | T-code can be entered directly in Command field. T-code can be saved in Favorites. | |
Material | As informed | |
Plant | As informed | |
Press enter |
Main activities | Tips / Best practices | Key points |
Click on generate records |
Main activities | Tips / Best practices | Key points |
Press enter or click on confirm |
Main activities | Tips / Best practices | Key points |
Select “Not changed” | ||
Press enter or click on confirm |
Main activities | Tips / Best practices | Key points |
Save it |
A contract is created in WP1 when some special negotiation was made with the vendor, for example, some specific material is paid with better terms than it is already set up on Vendor Master Data.
NOTE: THIS IS NOT A STANDARD PROCESS AND SHOULD BE PERFORMED ONLY WHEN NO OTHER OPTION IS AVAILABLE.
Main activities | Tips / Best practices | Key points |
Enter transaction ME33K | T-code can be entered directly in Command field. T-code can be saved in Favorites. | |
Press multiple choice button to receive pop-up window with search options for material master | you can also press F4 |
Main activities | Tips / Best practices | Key points |
Select Purchasing Documents per vendor | T-code can be entered directly in Command field. T-code can be saved in Favorites. | |
Add vendor | Information provided in the request | |
Purchasing Document Category | Always K | |
Press enter | If no values return, you can proceed with the creation |
Main activities | Tips / Best practices | Key points |
Enter on contracts that shows up | We have one contract by plant. In case it’s not the plant requested, proceed with contract creation, otherwise add item to the existing contract. |
Main activities | Tips / Best practices | Key points |
Enter transaction ME31K | T-code can be entered directly in Command field. T-code can be saved in Favorites. | |
Vendor | Information provided in the request | |
Agreement type | MK - Quantity contract WK - Value Contract | |
Purchasing Organization | Always CP01 | |
Purchasing Group | Plant buyer code | |
Plant | Information provided in the request | |
Press enter |
Main activities | Tips / Best practices | Key points |
Validity end | As requested | |
Target Value | Optional info | |
NOTE: In the header you can also set up some different information other than the one in vendor master data, such as different payment term, incoterms, etc. (this information will be the one selected when PO is created) | ||
Press Item Overview |
Main activities | Tips / Best practices | Key points |
Material | As informed | |
Target Quantity | Mandatory for MK contracts | |
Order Unit | If not populated, it will get from Material Master | |
Net Price | NOTE: Price can only be added with 2 decimal characters, in case price informed is as example $1.012 USD/EA > net price would be $10.12 and per will be 10 | As informed |
Per | As informed | |
Order Unit Price | As informed | |
Save it | After the contract is created, source list should be created |
Main activities | Tips / Best practices | Key points |
Go to transaction ME32K | T-code can be entered directly in Command field. T-code can be saved in Favorites. | |
Add contract number |
Main activities | Tips / Best practices | Key points |
Material number | Find the first blank line | Add information as requested |
Save it |
Main activities | Tips / Best practices | Key points |
Go to transaction ME32K | T-code can be entered directly in Command field. T-code can be saved in Favorites. | |
Add contract number | ||
Press enter |
Main activities | Tips / Best practices | Key points |
Select line that needs to be changed | T-code can be entered directly in Command field. T-code can be saved in Favorites. | |
Click on conditions |
Main activities | Tips / Best practices | Key points |
Single click on the valid period | ||
New with reference |
Main activities | Tips / Best practices | Key points |
Amount | Information provided | |
Save it | Note: Additional information can be changed also (texts) |
Main activities | Tips / Best practices | Key points |
Go to transaction ME32K | T-code can be entered directly in Command field. T-code can be saved in Favorites. | |
Add contract number | ||
Select Header Details |
Main activities | Tips / Best practices | Key points |
Change to Target value to the information provided | ||
Save it |
Main activities | Tips / Best practices | Key points |
Go to transaction ME32K | T-code can be entered directly in Command field. T-code can be saved in Favorites. | |
Add contract number | ||
Press enter |
Main activities | Tips / Best practices | Key points |
Select Line(s) you want to delete | ||
click on “Delete” | ||
Save it |
Main activities | Tips / Best practices | Key points |
After deleting all lines go to header | ||
Change Validity end to the past | ||
Save it |
Approvers and requesters are Buyers and Planners.
The full list can be found here.
NOTE: Requests from Finance team related to Kemira Water Solutions vendor, can be accepted without further approval. The supplier sends to Finance the summary billing invoice which is reviewed and Finance decides which prices to use as planned for the next period. The Buyers are not involved, since the type of operation with Kemira is tolling and not purchases.
Strategic buyers (Raw Material Buyer) and Site buyers are trained to create PIR's, Contracts and Source List as Riga Data Operations team, they are the owners of this data/process. Planners can also request PIR creation, since they can either turn to the Strategic buyers (Raw Material Buyer) and Site buyers or to Data Operations team. For Source List creation no approval is required.
The full list can be found here (Note: this is only a guidance file)
Roll Out 1 for composite material direct procurement data part involves plants:
8367 - 7180 Rock Hill
8785 - 7180 Piedmont
8350 - 7771 Wrexham
8802 - 7771 K&N Non-Bonded Reading
8796 - 7771 K&N Bonded Reading
8822 - 7771 Palmetto Greenville, SC
Roll Out 2
8361 - 7180 Orange
8364 - 7180 Anaheim
8365 - 7180 Greenville, TX
8795 - 7180 ET Horn La Mirada (Wh)
CONSIGNMENT
A form of business in which a vendor (external supplier) maintains a stock of materials at a customer (purchaser) site. The vendor retains ownership of the materials until they are withdrawn from the consignment stores. Payment for consignment stock is required only when the material is withdrawn for use. For this reason, the vendor is informed of withdrawals of consignment stock on a regular basis.
SUBCONTRACTING
An instruction to a supplier (subcontractor) to manufacture an ordered part, material or assembly using specified "materials to be provided" (free-issue materials). A subcontract order contains a maximum of one order item for the ordered material, service, or work, and one or more "material to be provided" items for materials that the ordered makes available to the subcontractor, without charge, for processing.
In this link we have a Q&A where we can find the most common questions and answers regarding this activity.
Domain | Europe | North America | Latin America | APAC |
1 - General Expenses | 3001 | 3009 | 3017 | 3025 |
2 - Packaging | 3002 | 3010 | 3018 | 3026 |
3 - Energy | 3003 | 3011 | 3019 | 3027 |
4 - Industrial Supplies | 3004 | 3012 | 3020 | 3028 |
5 - IT & Telecom | 3001 | 3009 | 3017 | 3025 |
6 - Raw Materials | 3006 | 3014 | 3022 | 3030 |
7 - Industrial Services | 3007 | 3015 | 3023 | 3031 |
8 - Transport/Logistics | 3008 | 3016 | 3024 | 3032 |
9 - Inter-Company | 3200 | |||
10 - Third Party | 3100 | 3101 | 3102 | 3103 |