Tasks to be completed when documenting an operation (from creation to publication)1. Enter the Title of the operation / page2. Add the following Labels :
3. Fill in all fields as described above4. Name the title of each section using OPD methodology naming convention - Infinitive verb without the “to”, mainly action verb...something) - " I do something..."5. Once the description of the operation is completed, ensure it is approved and published by launching the SBS-Finance approval workflow |
| Domain: Investments & Divestments |
Responsibility area: Control SBS IS Projects |
Once the SBS IS Projects are approved by all concerned parts, it is needed to create the project structure.
The scope of the WBS Elements creation for SBS IS Projects is to all legal entities in Solvay Group WW.
Definitions should be added in the Finance Glossary - Add definition and link it to respective Letter in Finance Glossary
See Finance Glossary:
All SBS IS Projects need to be approved by all the concerned parts (Responsible Financial Controller and Responsible SBS Manager).
The PPMO committee:
- Defines the Business Case (Project Approval Form) with the project presentation (scope, zone, …)
- Estimates the budget needed for the projects
- Makes a global evaluation of the projects and vote
- Suggests the projects to be developed to get the CIO’s approval
Project Approval Form are approved in AODOCs in Document PPMO.
There are two possibilities when assigning the costs of WBS Element
1. Capex (Investment) - are all expenses related to a project and that the company can amortize in several fiscal years.
Tangible: A Tangible asset is something that you can touch such as equipment or hardware.
Intangible: An Intangible asset is a something that you cannot touch such as software of services
2. OTC (One time cost/Overhead/Opex) - An OTC linked to a project, is an expense which is not expected to reoccur.
3.1. I receive new WBS Element Requests from the IS Controllers
After the approval of the project, the IS Controllers insert a new WBS Element Request in WBS Element Request file with the following information:

Everyday the MAC Analyst goes to the WBS Element Request file to verify if there is any new request from the IS Controllers.
When there is a new request, it is needed to parameterize the Project name in the tab Project List:


![]()



![]()
Note! Where do I get the customer 1 and customer 2? I need follow the procedure in 3.2 point:
Important!
It is very important to understand and verify the fields of the request before trigger the creation.

For SAP WP1 System:
All the requests, OTC and Capex are created by local team. I need to click on the link in column AY "Open ticket?", and an automatic e-mail will be filled with the requesting fields to be sent to freshdesk.
Example:
YY - Year. If 2020 - should be 20; if 2021 - should be 21... and so on.
XXX - Sequential number
Level 1 NHA-IYYNNN
Level 2 NHA-IYYNNN.01
Level 3 NHA-IYYNNN.01.7
Level 4- NHA-IYYNNN.01.7.LL.WWW.Z
LL corresponds to the material code:
70 for tangible assets
79 for intangible assets
WWW identifies the Stream:
Z is to define if Capex Intangible or Tangible
KKK – Sequential number
WBS example: NHA.PXKKK.WWWO
Execute the transaction "CJ02” to proceed to the creation of the WBS element
Enter the Project Definition: for example NHA/I20025

Press on Enter
Go to the tab «Basic Data»
Double click on the first line where is the first level on the WBS element (in this example: on NHA-I20025)
Enter the responsible Person code and the cost center:
Press Enter
Click on tab «Control»
Check in the investment profile is correct: (The 2 letters after the Z are the coutry code)
ZKR000 = Investment Korea Profile Tangible
ZKR001 = Investment Korea Profile Intangible
ZBE000 = Investment Belgique Profile Tangible
ZBE001 = Investment Belgique Profile Intangible
(…)
Press to validate on
Create a wbs element of level 2: (on a second row)
In the WBS element: Enter the code of the WBS element of level 1 followed by .01 (for example: NHA-I20025.01)
In the Description: Enter the cost center responsible
Click Enter
In Short ID: will appear automatically
Tick in the box for PE
Double click on the WBS element of level 2 (on NHA-I20025.01)
Enter the responsible code and the cost center:
Press on Enter
Click on tab «Control» and check in the investment profile is correct: (The 2 letters after the Z are the coutry code)
ZKR000 = Investment Korea Profile Tangible
ZKR001 = Investment Korea Profile Intangible
ZBE000 = Investment Belgique Profile Tangible
ZBE001 = Investment Belgique Profile Intangible
(…)
Press to validate on
Create a WBS element of level 3: NHA-I20025.01.7
The number 7 means MANAGEMENT INFORMATION SYSTEMS
In the WBS: enter the WBS element code of level 1, followed of .01.7 (for example: NHA-I20025.01.7)
In Description: put the name of the material code: put 🡪 MANAGEMENT INFORMATION SYSTEMS
In Short ID: is autommatic
Tick in the box for PE
Double click on the WBS element of level 3
Do the same check of the previous steps
Check if the investment profile is correct
Investment reason = always H0 pour for SBS projects
Enter the responsible code and the cost center.
Press Enter
Click on tab «Control»
Check if the investment profile and the investment reason are correct .
Click on
Create a WBS element of level 4 (= WBS element attributable): NHA-I20025.01.7.79.ISAL
The 2 last numbered positions are the material code linked to nature of the WBS element:
70 = MANAGEMENT INFORMATION SYSTEMS HARDWARE
72 = Equipments Telecom
74 = Local Networks (LAN)
79 = Software
The last letters:
Three of them identify the Stream:
ISA for Application
ISI for Infrastructure
IST for IST
SBS for SBS E&E
Final one is to define if Capex Intangible or Tangible
M for Tangible Capex
L for Intangible Capex
In the Description put the name of the project + “TAN” (forTangible) or “INT” (for Intangible)
In Short ID: is autommatic
Tick in the box: PE and Acct (Acct is Mandatory because the WBS is attributable)
Double click on the WBS of level 4(for example on NHA-C17883.01.7.79.ISAL)
Check of the investment profile and the investment reason are right.
Enter the responsible code and the cost center.
Check if the box Acct asst elem. is well ticked.
Press Enter
Check of the investment profile and the investment reason are right.
Validate clicking on
Once the WBS Element is created, I fill the in WBS Element Request file the WBS code and networks created.
If the controller has indicated in the comments that it is needed to send the codes to specific contacts, I send an e-mail to the indicated contacts.
For example: