This document presents the general process for managing air transport rates and routes in WP1 system.
This process applies to all tariffs and deliveries to be processed in the EMEA zone (except Gorzow in Poland), and exclusively with regard to sales transport.
SD : Shipment Document. This file is a summary of all the elements necessary for carrying out a transport: route, carrier used, point of departure, point of arrival, mode of transport used ...
SCD : Shipment Cost Document. It is generated during the implementation (= ex works) of the transport mentioned in the SD where the accrual of the transport cost is created.
SHIPPING POINT : This is a code assigned to each site according to the nature of the product transported and the type of transport used (Ex: Collonges = 0151).
TARIFF ZONE : Division of a country to avoid having to enter the same tariff as many times as there are departments in the same geographical area (Ex: ZT Rhône-Alpes can include 01, 38, 69, 42)
EMEA : Europe, Middle East and Africa
TRANSPORT PLANNING POINT (TPO) : This is a code assigned to each administrative entity. It defines which site is responsible for organizing and paying for each transport.
RDT*TDA - versão francesa e bastante utilizada :* Route Determination Table. This table allows that a route populate automatically in an order.
GOOGLE FORM : It is a way that allows sites to make emergency route requests.
DG and NDG : If we are dealing with a Dangerous Goods or Non Dangerous Goods flows
|
|
|
| ||
|
|
|
Tariffs are created on Primary and Back-up flows.
Before creating a price, check that it does not exist in SAP (via TK13)
Our rate base can be found in the following path:
My Disk > 01. SBS OtC Logistics Data EMEA > TENDER > Rates Global data warehouse > FINAL Qlikview Files *Do not delete*
The Air price scheme corresponds to a lump sum from the shipping point to the destination airport, price/kg (gross weight), including a minimum (without weight range).

You may find your data by using the matchcode available for each field: 
xx = country xxx = airport code
There are no prices for hazardous materials in consolidated service


*Sent by email in the beginning of the Tender
If needed we can use some existent price condition depending on the surcharge to be created.
As an example, how to create a fuel surcharge (Fuel per Weight) and managed in a separate price condition.
The fuel costs are variable quarterly, on information from Purchases.
Enter the price under condition TK11: Create condition records 
|
|
|
| ||
|
Route requests
Route Creation |
|
Routes are created only on Primary flows.
The request can reach us either by google form (for spot requests from sites) or via an update of the AIR tender by Logistics Purchasing.
Procedure:
Go to the "change user group" icon
, and "Enter"
Select ZW_RCS_OC 
![]()
Leave nothing, click directly on ![]()
Make a layout with the elements listed below:
Enter
If necessary, export to Excel and save
Carrier 1
Shipping PointDestination Airport
The elements required to create this type of route are:
"The AIR tariff construction is based on the following schema: minimum rate and rate per Kg from shipping site to destination airport.
It is therefore necessary to create a route by shipping point and by destination according to each needs."
This information is very detailed because it allows not only to create the route but also to check / request the price for the given flow.
It should be noted that for air shipments departing from France, the border point corresponding to the place where the goods leave European territory must be indicated (the border connection point: 7 FR xxx).
In the Route tab, click on the "Position" icon. We assign the route number ourselves.
Check the last number on the list by entering "5" (air routes start with 4), assign our route number.
Indicate the route number by the chosen route number.
Enter the new data: Service agent code / Mode of transport = 4 (Air) / Type of shipment = 11 (Air cargo).Enter the new transit time / Lead time / Factory calendar key = 10 (All days are work days).
Enter the new designation and copy this designation to the "Route ID" line.Check "Rel.transport". This will automatically generate a DFT when using this route.

Enter the departure connection point (starting with 1 FR => Site / Shipping Point) and arrival one (starting with 5 => Airport).
Enter the new data: Service agent code / Leg indicator = 2 (Main leg) / Shipping type = 11 (Air cargo) / Stage category = 1 (Transportation)*Click on "ShpmntCostsRel{*}". This will automatically generate a SCD when using this route.

The wording of the routes must follow 3 essential rules: