The workbook is used to validate the quality of the data reported in imep for the sites in PF1.



Access the workbook

The workbook to be used is BW_WBK_CO_0024 - BW - IMEP - PF1 Check of data consistency (Core Workbook) 

=> Go to Analysis for Office in excel 

=> Click "Open Data Source"




Go to the tab "Role" and open the folder IMEP - Integrated Manufacturing & Energy Performance => Manufacturing 

Double-click on the workbook BW_WBK_CO_0024 - BW - IMEP - PF1 Check of data consistency (Core Workbook) to open it



Open the workbook

It is mandatory to enter the period (2) : MMM.YYYY

It is also recommended to enter at least a company code (6) or a plant code (11)

It is also possible to enter:

  • a target currency (3) however it is recommended to perform the test with the local currency
  • a Unit of Measure for the quantity conversion (ex: TO for Tons) (4)
  • a GBU (5)
  • a Cost object (8)
  • an Index 1 (9) 
  • a material code (10)

Click "OK" 



The workbook in detail

There are 7 sheets in the workbook: 



1. DS_6

The aim of the report iMEP is to provide a detail of actual production costs by material/plant. In PF1, the actual production costs by material is calculated with Material Ledger and the total by material/plant can be displayed with the transaction CKM3 - Material Price Analysis.

The purpose of the control (DS_6) is to compare the calculation done by Material Ledger (2) and the one done in iMEP (3) material code by material code (1)

Ex: The actual production costs calculated with Material Ledger (2) gives the same result as iMEP (3). It confirms that the report iMEP is accurate.

(2) = (3)

=> In case of discrepancies, a ticket should be created to get the support of the IS team



2. DS_2

Produced quantity (2) should be equal to Actual quantity (3) 

(1) = (2) - (3)

=> In case of discrepancies, a ticket should be created to get the support of the IS team



3. DS_1

The aim of this control is to ensure that the total productions costs (2) calculated by iMEP is equal to variable costs (3) + fixed costs (4) + depreciation (5).

(1) = (2) - ((3) + (4) + (5))

=> In case of discrepancies, a ticket should be created to get the support of the IS team



4. DS_3

The aim of this control is to ensure that the total productions costs (Index 1 = 1 & 2) (2)(3) calculated by iMEP is equal to the sum of Raw materials (Index 1 = 3) (4) and activities (Index 1 = 5 & 7) (5)(6) costs.

(1) = (2) - ((3) + (4) + (5) + (6))

=> In case of discrepancies, a ticket should be created to get the support of the IS team



5. DS_4

The aim of this control is to ensure that the total activities costs (Index 1 = 5 & 7) (1)(2) calculated by iMEP is equal to the production costs recorded in a cost center  (Index 1 = 9) (4) 

(3) = ((1) + (2)) - (4) 

=> The control is only true when a production cost center is dedicated to the production of a single material.
In the case of multi-materials cost centers, it is not possible to report the index 1 = 9 per material and therefore the control does not work.



6. DS_5



7. Data loading

In this sheet you can find some information regarding the loading of data in iMEP