Dynasys KPIExplanations
Current SHSStock Holding Strategy from SAP
Proposed SHSStock Holding Strategy proposed by Dynasys based on the decision tree
ReasonReason of the proposed SHS
Future Demand

Future demand on the next 12 months =

Future demand = Gross requirement = Independent (External + Internal) + Dependent requirements 

For Novecare, it's the validated requirement during the last S&OP Validation.

For TS & Special Chem, we take the Gross requirements as is in DiP, from the last data update into P&I.


The dependent requirement is based on the BOM in DIP-PP (from SAP for Novecare / Manual update for TS for the moment).

Batch Size P&I

Batch size final.

The batch size from SAP can be override on the tab "Batch Size", if it the case it will be the one take into account:

Past Demand Average

Past demand Average based on Independent demand (Internal + External) + Actual consumption

On the last 12 months.

Batch size / AWD= Batch Size P&I / Past Demand Average
Safety stock proposed

Safety Stock calculated based on the SHS proposed

Cycle Stock proposed

Cycle Stock calculated based on the SHS proposed

image2023-2-10_10-39-4.png

Target stock proposed

Target Stock calculated based on the SHS proposed


Target Stock = Safety Stock + Contractual Safety Stock (manual input) + Cycle Stock + In Transit Inventory DIP

Corridor Max StockMax Stock = Safety Stock + Contractual Safety Stock + 2 * Cycle Stock (based on the current SHS) + In Transit Inventory DIP
Intransit ETA from SAPIntransit on the future from SAP
Baseline

Actual Planning Inventory for a given month (the user can choose by using the shortcut the baseline month) =

End of Month quality inventory

+ End of Month unrestricted customer inventory

+ End of Month unrestricted inventory

+ End of Month unrestricted vendor inventory

Baseline valueBaseline converted to value (€) at Standard Cost
Last 3 months average stock

Average of the last 3 months inventories:

End of Month quality inventory

+ End of Month unrestricted customer inventory

+ End of Month unrestricted inventory

+ End of Month unrestricted vendor inventory

Last 3 months average stock valueAverage Inventories last 3 months converted to value (€) at Standard Cost
WC impact value

WC impact value (€) at Standard Cost =

Average next 3 months value (€) - Baseline value (€)

SHS RLT

Replenishment Lead Time calculated by Dynasys according to the BOMs.

Link to SHS RLT details

Mono Level RLT 
  • If the SKU is purchased, Mono Level RLT =

Procurement processing LT from SAP (but can be override)

+ Procurement LT from SAP (but can be override)

+ Quality LT from SAP (but can be override)


  • If the SKU is produced, Mono Level RLT = 

Production LT from SAP (but can be override)

+ Quality LT from SAP (but can be override)

Status

User input, you can choose on the list according to your review:

  • Batch Size review (MOQ)
  • Batch Size review (Plant)
  • Challenge Target Stock
  • Complete
  • Lead time review
  • Not yet reviewed
SHS validationThe user can validate the SHS of his choice through this field.
SHS validation comment

Commentary field to explain the SHS' choice.

SHS validated

The validated SHS is equal to the Current SHS from SAP unless the user validates another strategy by selecting another SHS through the SHS validation field.

Safety Stock validated Safety Stock based on the validated SHS
Cycle Stock validatedCycle Stock based on the validated SHS
Target Stock validatedTarget Stock based on the validated SHS
DIOH Calculation Target validated

DIOH calculated based on the target validated


*When aggregated in the view, this DIOH displays the average on the next 12 months.

DIOH Min Target validated 

DIOH Min based on the safety stock validated


*When aggregated in the view, this DIOH displays the average on the next 12 months.

DIOH calculation baseline

DIOH Calculation based on the baseline =

(Baseline Inventory volume) * 365 / (Total Future Demand Volume of Next 3 months end*4)

*When aggregated in the view, this DIOH displays the average on the next 12 months.

DIOH calculation inventory M-1

DIOH Calculation based on the inventory of M-1 =

(M-1 Inventory volume) * 365 / (Total Future Demand Volume of Next 3 months end*4)

*When aggregated in the view, this DIOH displays the average on the next 12 months.

SMOG M-1

Slow Moving Obsolete Goods

Data retrieved from a BW Query.