Tasks to be completed when documenting an operation (from creation to publication)1. Enter the Title of the operation / page2. Add the following Labels :
3. Fill in all fields as described above4. Name the title of each section using OPD methodology naming convention - Infinitive verb without the “to”, mainly action verb...something) - " I do something..."5. Once the description of the operation is completed, ensure it is approved and published by launching the SBS-Finance approval workflow |
| Domain: 1. Enter the Domain identified in OPD matrix (for Country specific operations, Domain = Country Accounting) |
Responsibility area: 2. Enter the responsibility area described in OPD matrix ("N/A" for Country Accounting Operations) |
The main purpose of this procedure is to check the netback Join Ventures sales.
D1
4290 and 4291
Definitions should be added in the Finance Glossary - Add definition and link it to respective Letter in Finance Glossary
See Finance Glossary:
WHAT and HOW - Main content of the operation
The content should be mainly organized in 2 levels of Headings to ensure a proper link with the Table of Contents.
Select the level of heading in the "Paragraph" option.
Receiving an e-mail from supply chain department with following information with it we can starting completing the template attached.

In this report you will updated all the cells in blue, starting on the date in the line 2, the price per STN (netback sales) line A10 is adjusted after each quarterly (controller will provide this information), with the e-mail information you can complete the line D32 (PO number) and D35 ( delivery number).

The section 1 and 2 you need to open the purchase order on ME23N.

Transaction ME23N - Good receipt posted in 4290

Transaction ME23N - Good issue posted in 4291

The section 3 and 4 display the invoice on VF03.

The last section is to save the documents number as a support, on the vendor account FBL1N according to instruction in blue in the file.

After complete the figures instructed above revise the netback is correct in column M line 48 the result of formula needs to be the same netback on the column A10 and in the column M69 if shows a higher difference the controller needs to be informed it means that the billing to Asahi is not 20% of the total.
...
3.2. I do something...
...