- P&I
0. Introduction / Objectives / Architecture - Data
- Data from SAP
- Stock Holding Strategy (SHS)
- Lead times coming from SAP
- Catalog LT
- Production LT
- Procured LT
- Annex: Customer Lead Time (not P&I scope, part of CEM project)
- Data calculated in Dynasys
- Scheduling LT (maintained in Dyn)
- Monolevel LT & SHS RLT
- DIOH
- Safety stock
- Cycle stock
- Target Stock
- P&I in DynaSys
0. General Process & Set-up- SAP Import Data Quality Control
- Data quality Dashboard
- Control Production / Procured LT (SAP)
- Control ATP Code, MTO-FB lot size
- Control SHS, Catalog LT, SHS RLT
- Control SHS RLT, SS
- Control of SAP LT overriden inside DiP
- Report summary SAP information
- DynaSys Data review
0. Shortcuts
- Proposed Valuation Class for P&I
- Administrative Scheduling LT
- Procurement LT for P&I
- Monolevel LT & SHS RLT
- Catalog Lead Time
- Frequency of inbound
- Batch size for P&I
- Safety Stock
- Cycle Stock
- Inventories
- DIOH
- Decision Tree
- Decision tree Raw Materials & Intermediates
- Review Inputs
- Review Outputs (RM - Intermediates Output)
- SHS Validation
- Decision tree Finish Goods
- Review Inputs
- Review Outputs (FG Output)
- SHS Validation
- P&I Validated changes report
- Validated SHS, Validated SHS RLT, Agreed Catalog LT
- Macro report of Before / After P&I changes (SHS, Safety, Cycle, Target)
- Reports
- BW Inventory Report
- QV
- Glossary
- Tips & tricks
- Export/Import Microsoft Excel