P&I Lead Times | Level Required | Proposed SAP Field | Purpose in SAP | SAP Level | Comment |
Production LT | Material / Plant | Work scheduling view : Processing time (MARC-BEARZ) + Base quantity (MARC-BASMG)
or if not filled-inMRP view or Work scheduling view : Inhouse production time (MARC-DZEIT) | The "Processing time" from Work scheduling view is used by the MRP -> Scheduling activitiesThe "Inhouse production time" from MRP2 view is not used by the MRP. | Material / PlantWorkdays | |
GR Processing LT | Material / Plant | GR processing time (MARC-WEBAZ)
| Number of workdays required after receiving the material for inspection and placement into storage. | Material / PlantWorkdays |