<style> .toc-macro ul {display: block; counter-reset: item} .toc-macro li {list-style-type:none} .toc-macro li:before {content: counters (item, ".")". "; counter-increment: item} </style> |
This document's objective is to provide a guide to ZPRC, ZMAT (raw and manufactured), ZVER, ZERS, ZBOM, ZUNB and PIR Material master data management for GBU Composite Materials (Legacy Cytec organization).
Material Master Data management process includes creation and modification of the material as well as its inactivation and flagging for deletion, and reactivation if needed.
Creation of Basic Data, Classification, Sales, Foreign Trade, Purchasing, General
Plant Storage, Warehouse Management and Label Data Views will be presented in this procedure. Management of MRP, Work Scheduling, Quality Management, Accounting and Costing Views is being performed by Process Teams. Accounting and Costing views are created by Riga Data Operations when extending materials to Trading Plants. For Sample codes Riga Data Operations is creating all necessary views.
Requests of Composite Materials Material Master creation or maintenance should be submitted via Sharepoint platform which will send out an automatic FreshDesk ticket to Data Team within which the material maintenance should be done.
The referral lists mentioned in this procedure, such as Material Groups, Purchasing Groups and Profit Center List are embedded in Sharepoint platform already.
Under Riga Data Operations scope is the management of ZPRC, ZMAT (raw and manufactured), ZVER, ZERS, ZBOM, ZUNB and PIR Material master data management for GBU Composite Materials (Legacy Cytec organization). Riga Data Operations can create and extend ZDIE materials if requested so by Finance.
Material Type | Description | Division |
|---|---|---|
ZPRC | Commercial Products | N/A |
ZMAT | Finished Goods | Multiple |
ZVER | Packaging | WD |
ZUNB | Stocked and non-valuated materials | WD (for packaging) |
ZDIE | Services | Multiple |
PIR | Purchase Info Record | |
| ZERS | Industrial supplies | |
| ZBOM | Phantom assemblies |
Abbr. | Description | Abbr. | Description |
|---|---|---|---|
RCS | Rhodia Core System | SBS | Solvay Business Services |
ZDIE | Service | UoM | Unit of Measure |
ZMAT | Finished product, semi-finished product, raw material | HSE | Health, Safety and Environment |
ZPRC | Commercial Product | MSDS | Material Safety Data Sheet |
ZUNB | Stocked and not valuated material | MRP | Material Resource Planning |
ZVER | Packaging | DG | Dangerous goods |
| DGL | Data Governance Lead |
ZMAT setup can be performed only once both ZPRC code and MSDS are available.
Prior to submitting a new ZMAT request, it is the requester´s responsibility to ensure the material does not exist in SAP already, so no duplicates are created in the system. If the material was not found, the TS SAP Material request form or Composite Materials Sharepoint must be filled and submitted to Data Operations for material master setup in SAP. A second search in the system is performed by the Data Management team to ensure no duplicates are created.
Manufactured ZMAT setup can be performed only once both ZPRC code and MSDS are available. Prior to material creation in the system search is performed by the Data Operations team to ensure no duplicates are created.

to open the menu

or if the Requester mentions a new article need to be created then proceed with the creation.
Use MM01 transaction to create material
| Main activities | Key points |
|---|---|
| Industry Sector | Always choose "Chemical Industry" |
| Material Type | Select the material type indicated in the request form |
| Copy from… Material | Option to copy data from an existing material can be useful in some cases. |
| Hit Enter |

Before creating the Manufactured Product for For Composite Materials (Aero) check if there is a ZUNB already created! |
| Use Default Setting button to save your selections for future creations |
Hit Enter


| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Use MM01 transaction to create material
| Main activities | Key points |
|---|---|
| Industry Sector | Always choose "Chemical Industry" |
| Material Type | Select ZMAT |
| Hit Enter |



If we receive a request to extend the raw material to distribution channel 0B, a workflow in Sharepoint needs to be created using the Change flow and the EHS approval (Paul Paetzke) needs to be attached to the flow. |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Use MM01 transaction to create material
Main activities | Key points |
|---|---|
| Industry Sector | Always choose "Chemical Industry" |
| Material Type | Select the material type indicated in the request form |
| Copy from… Material | Option to copy data from an existing material can be useful in some cases. |
| Hit Enter |



| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
For every packaging creation and extension, the PIR and Source List should be created within the same request using the information provided in the material form. If not provided, reject the request in Sharepoint.
Steps for finishing the request PIR and Source list part:
Requester should provide us with correct Description and Plant where material should be created.
2 types of ZBOM:
Create the material through MM01 transaction.
Enter Industry Sector and Material type:
| Main activities | Key points | |
|---|---|---|
Enter Industry Sector | Always choose “Chemical Industry” | |
| Enter Material Type | Always ZBOM for Phantom assemblies | |
| Copy from… Material |
|

Select views to be created:

Fill in Organizational Levels.
Sales Organization and Distribution Channel should not be filled |

|
Create the material by creation transaction:
| Main activities | Key points |
|---|---|
| Enter transaction MM01 | Full path: Logistics -> Materials Management -> Material Master -> Material -> Create |
| Enter Industry Sector | Always choose “Chemical Industry” |
| Enter Material Type | Always ZERS for Industrial Supplies |
| Copy from… Material | If applicable, make sure to edit the data that differentiates current material from the previous one |
| Press Enter |

Select Views to be created:
Select views to be created:

|
It is in Data Management scope to create ZPRC records for Raw Materials when requested comes from HazCom Team. When ZPRC record is completed in SAP WP1, systems are being synchronized overnight and PRCO code appears on HazCom side.
To complete this request material chemical name should be verified and provided by HazCom Team.
Use MM01 transaction and populate:
Main activities | Key points |
|---|---|
| Industry Sector | Always choose "Chemical Industry" |
| Material Type | ZPRC |
| Copy from… Material | Option to copy data from an existing material can be useful in some cases, e.g. if you need to create multiple similar materials |
| Hit Enter |

Select Views to be created:
|
Use MM01 transaction to create material
Main activities | Key points |
|---|---|
| Industry Sector | Always choose "Chemical Industry" |
| Material Type | Select the material type indicated in the request form |
| Copy from… Material | Option to copy data from an existing material can be useful in some cases. |
| Hit Enter |

Select Views to be created:

Extend to the following plants:
7264 ZZZZ ex 3969 / Négoce IT
7265 ZZZZ ex 3969 / Négoce DE
7266 ZZZZ ex 3969 / Négoce GB
7267 ZZZZ ex 3969 / Négoce FR
8269 ZZZZ ex ZUS4 / Trading USA
8577 ZZZZ ex 7776 / Trading CN

|
It is an additional extension with 0A (intercompany) distribution channel to Overflow warehouses for material storage purposes in case the original warehouse for the plant is full.
Applicable only to the following plants:
8350 - 7771 Wrexham
Reference document to check the fields to be changed based on the plant.
Extend the material by creation transaction:
| Main activities | Key points |
|---|---|
| Material | Material number to be extended for overflow warehouse |
| Industry Sector | Always choose "Chemical Industry" |
| Material Type | |
| Copy from… Material | Material number to be extended for overflow warehouse |

Select views to be created:

Fill in organizational levels:
| Main activities | Tips / Best practises | Key points |
|---|---|---|
Plant | As per plant | |
Storage location | As per plant | |
| Sales organization | As per plant | |
| Distribution channel | As per plant | |
| Warehouse no. | As per plant |
No changes on the views, just pass through and open the material for Sales: Sales org. 1, Sales: Sales org. 2, Sales: general/plant, Foreign trade export.
Press enter and Go to Purchasing view

|
For the second overflow plant we can copy from the just created extension.
There is no need for SalesOrg and Warehouse views.

This is what to select for copying:

Now go through all the views without making any changes,except for MRP2, where Storage loc. For EP should be changed to correspondent plant:

Once you are all through other views without changes, save the material.
Composite Materials Master Data Governance Who's Who - link where you can find the appropriate person for specific roles per site.
Plant | Data Governance Lead | DGL Backup |
Anaheim 8364 | Rehan Suhrwardy | Nic Donovan |
Orange 8361 | Corinne Nelson | |
D’Air 6363 | Bruce Gormley | |
Greenville 8365 | Austin Helton | Brianna Hammond |
Winona 6370 | Danielle Dietermann | Jenna Sand |
Kalamazoo 8456 | Carrie Replogle | |
Havre de Grace 8368 | John Cahoon | Kenya Eaton |
Piedmon 8367 / Rock Hill 8785 | Harrison Blackwelder | |
Wrexham 8350 | Stuart Tudor Jones | Peter Kaye |
Oestringen 8347 | Nina Kunze | Jose Marin |
Fengxian 8628 | Rick Marmol |
Link to Warehouse and Storage locations
Link to the presentation. Please check presentation for detailed information on the tool.
| ZERS and PIR creation/modification/deletion | PIR creation/modification/deletion | ||||
|---|---|---|---|---|---|
| Plant | Buyer | Storeroom Owner | LPR | ||
| 8367 | 7180 Piedmont | US | Kay Drake | David Williams | Procurement team |
8785 | 7180 Rock Hill | US | David Lynn | Procurement team | |
8350 | 7771 Wrexham | GB | Ken Sharp | Ben Pine | Procurement team |
Requests via Fresh Desk ticket from Quality Manager or Data Governance Lead, request
approval from Product Manager by material division:
I1 Composites Hot Melt → Greg Kelly
G2 Composite Other → Greg Kelly
I0 Composites Solution → Dan Eskelsen
G3 Adhesives → Shawn Grobe
G4 Fibers and Fabrics → Lisa Wohnlich
G6 Thermoplastics → Lisa Walton
Before inactivation material should be checked for open items under "Stock overview"

If there are no open activities, Stock will show only "0". If any other values displayed, appropriate Product Manager should be contacted for Stock removal.

| Level | Inactivation |
|---|---|
| Global | After Stock is cleared material can be inactivated.
|
| Local | Note! For local inactivation the plant might request the value to be populated in SAP, proceed with the inactivation with the values provided in the ticket If material has to be inactivated for specific sales areas
If material has to be inactivated for specific plants
|