Tasks to be completed when creating an operating procedure (from creation to publication)

  1. Enter the Title of the procedure.
  2. Add the following Labels Labels
  3. Fill all fields as described
  4. Once the procedure is completed, publish it using the PtP Procure to Pay approval workflow



Table of contents 

By default the table of contents displays Heading 1 & Heading 2 (other levels can be added)


Scope


1. Remove the icon(s) when not applicable

   

2. Add countries when the procedure is for a specific country (optional)

ERP


3. Remove the icon(s) when not applicable

  
  

References


4. Add the link to SAP procedures (when it exists)

Attachments


5. Add the link to attachments (to be stored in AODocs or GDrive) or external links  

1. Objective and Scope

This OP explains the steps necessary to update the confirmation control - ARIBA NETWORK

Maintained in WP1_400 and PF1_020.

ARIBA is an online platform that aims to facilitate Buyer-Supplier transactional activities.
Allows the supplier:
- to receive and process electronic purchase orders;
- submit electronic invoices;
- track status of their invoices

2. Manual Procedure

Activate

When requested to mark a vendor as ARIBA it is used the transaction ZMM_ARN_VND_ACT_DCT (PF1_020 or WP1_400).

It is added the vendors number and the type of account. The type is informed by the ARIBA team. 

Then by clicking in execute the system will automatically performed the update:

Then , it is needed to add the vendor to the Google File (in the correct tab) and in PF1_050 the Search Term of the vendor needs to be added the code "ARIBA".


NOTE 1: The platform does not allow to activate more than 20 vendors at the same time through the standard system. It needs to be used the VIRTUS. 

NOTE 2: Also, all the communication must be performed by email (to keep the history for people who don't have access to Freshdesk).

NOTE 3: When created an OA linked to an ARIBA vendor, the OA must be also activated as ARIBA.

Deactivate

To remove the vendor for the ARIBA enrolment the action is first done by the Purchasing team (group PTP Internal Controls), then Materials team and only later by the Vendors team.

It is used the transaction XK02 (PF1_020, WP1_400 or in both) and it is removed the Confirmation Control code:


Then, it is used the same transaction in the PF1_050 to remove the ARIBA mark in the field Search Term 2:


When marking for deletion an ARIBA vendor, it is not needed to inform ARIBA team, unless a new vendor has been created to replace the old one. There is no need to unmark the old vendor.

3. Automation for Vendor Enrollment 

3.1. ZMM_ARIBA_NEW_SUPP

Every day, a job will run transaction ZMM_ARIBA_NEW_SUPP in PF1_020 & WP1_400 selecting a variant created with the criteria provided by the ARIBA TEAM.

Variant ARIBA
Vendor

P000000000 - PZZZZZZZZZ 
Domain Code

8
3

Segment Code

P204
P005
P010
P045
P049
P052
P053
P054
P067
P073
P076
P077
P098
P099
P104
P252
P253
P254
P255
PLO1
P208
Class

A
B
C

Blank

Country

NL
GB
FI
US
ES
CA
FR
BE
DE
Account Group

KRED
PERS
Z012
Z013
ZZCP
ZZPE
ZXAG
ZZCD
Z3UA
Z7RA
Z9TA
ZAAD
ZCAD
ZDAD
ZEAD
ZFAD
ZIAD
ZNAD
ZPAD
ZQAD
ZUAD
ZA15
ZD15
Created on

current date - 1 day


The steeps done by this job are described here.


In the end, an email will be sent to ptp-data.analysis@support.solvay.com with the execution report in order to confirm if all steps have been made without any block.


Finally, the Google sheet created to monetized the ARIBA enrollment should be filled in - Tab Standard ACC .

The following columns must be filled in:

A

Country of the supplier
BName of the supplier
CPRS / PF1 vendor codeIf available in PF1 (if not mark with red)
DWP1 Vendor codeIf available in WP1
GDate of invitationGo life date
H

Go-Live Group

B0

I

IMPORTANT REMARK

Origin of the activation - ex. ZMM_ARIBA_NEW_SUPPLIERS

J

Go Live Date

Go life date: DD/MM/YYYY

NOT ACTIVE (if supplier has been deactivated)


K


PF1 current status

ACTIVE: DD/MM/YYYY

DEACTIVATION: DD/MM/YYYY

(must not be removed the information already available in the cell)

(if the supplier is being deactivated, the status show should the initial activation date, the deactivation date and the current status which is “NOT ACTIVE":


L


WP1 current status

ACTIVE: DD/MM/YYYY

DEACTIVATION: DD/MM/YYYY

(must not be removed the information already available in the cell)

(if the supplier is being deactivated, the status show should the initial activation date, the deactivation date and the current status which is “NOT ACTIVE" - see example in the line K)

MGo alive status

A vendor is activated = Live

A vendor is deactivated = Deactivated

NReplacing another vendorAdd the vendor number that is now obsolete
OStrategy typeSelf service
QCommentsTicket number


Note:

1. In case the vendor was not created in the last working day the vendors code must be searched in the Google file:

  • If founded it means that it was linked to a different system (see point 3).
  • If not founded it means that it was incorrectly marked as ARIBA. The unmark needs to be started.

2. In case it was created in the last working day the vendors code must be added to the Google file.

3. When linked to a different system the operator needs:

  • send a ticket to PtP Ariba support with the vendor code (it could be different for WP1 system). They will let us know if it should be activated as Standard or Enterprise account (depending on the type of profile the supplier set up in Ariba, they can upgrade themselves without our intervention):
    • If confirmed that it is a standard account, no action needs to be done, supplier is already enrolled as standard
    • If confirmed that it should be a enterprise account, we should run transaction ZMM_ARN_VND_ACT_DCT in the respective system as enterprise for that vendor. Data Ops Team proceeds with the activation and filling out the Go Live file  

3.2. ZMM_ARIBA_EXTND_PORG

Every day, a job will run transaction ZMM_ARIBA_EXTND_PORG in PF1_020 & WP1_400.

Variant ARIBA

Vendor


left blank

Created on

current date - 1 day

Confirmation Control     

Z017

The steeps done by this job are described here.

In the end, an email will be sent to ptp-data.analysis@support.solvay.com with the execution report in order to confirm if all steps have been made without any block.


NOTE: The operator must check if the vendor is being enrolled for a Purchasing Organization for the same system:

  • if yes the ticket can be closed (no action needed);
  • if not the vendor is being linked to a new system so the operator needs:
    • send a ticket to PtP Ariba support with the vendor code (it could be different for WP1 system). They will let us know if it should be activated as Standard or Enterprise account (depending on the type of profile the supplier set up in Ariba, they can upgrade themselves without our intervention):
      • If confirmed that it is a standard account, no action needs to be done, supplier is already enrolled as standard
      • If confirmed that it should be a enterprise account, we should run transaction ZMM_ARN_VND_ACT_DCT in the respective system as enterprise for that vendor. Data Ops Team proceeds with the activation and filling out the Go Live file .

On the column I please add the origin of the activation, in this case ZMM_ARIBA_EXTND_PORG.

4. Spot Requests

ARIBA Support Team (Ariba.Enrolment@solvay.com) will contact Data OPs. Vendors Team sending and email to the inbox (ptp-data.analysis@support.solvay.com) which will created a FreshDesk Ticket.

All interactions should be done replying to the email and not using the internal notes.

If any action needed from other team (Materials, Provisioning...), the ticket should be transferred to the respective FreshDesk Group.

4.1. OAs Analysis

ARIBA Support Team should send a suppliers' list to check if there are any OAs linked to the provided suppliers in both systems (PF1 & WP1)

The following queries should be executed in both systems:

SQ00

Go to Environment and than Query Areas:


Select:


Go to:


And double click on Group ZW_PU:


Then two queries should be executed   in both systems:

1st ZMM-036C Emails of OAs @ Vendor Master Data

2nd ZMM-036B Emails of OAs @ Purchasing Docs


PRSSE16N - Variant ARIBA OAs
  1. Go to SE16N, select Variant ARIBA OAs and 
  2. Copy the list provided and add it in field Vendor
  3. The extraction will have 3 columns:
    1. PRS vendor number
    2. Nodel 
    3. RCS vendor number
  4. Create a copy of file ARIBA - OAs Template and copy the list extracted to a new sheet in the file.
  1.                         
  2.  
PF1ZMM-036CZMM-036B
  1. Copy the list provided for PF1 to field Vendor & and select Partner function OA - Execute
  2. Copy the list provided to field Vendor's account number, Partner function OA will be already selected by default- Execute

1.

2.

  1. Choose layout /ARIBA

1.

  1. On the table, click on the mouse's right button and select spreadsheet
  2. Copy past all info from the file to the copy created of ARIBA - OAs Template

1.

  1. Copy past all info from the file to the copy created of ARIBA - OAs Template

WP1ZMM-036C ZMM-036B
  1. Copy the list provided for WP1 to field Vendor & and select Partner function OA - Execute
  2. Copy the list provided to field Vendor, Partner function OA will be already selected by default- Execute

1.

2.

  1. Choose layout /ARIBA 

1.

  1. On the table, click on the mouse's right button and select spreadsheet
  2. Copy past all info from the file to the copy created of ARIBA - OAs Template

1.

  1. Copy past all info from the file to the copy created of ARIBA - OAs Template
  2. Concatenate:
    1. columns I J K - if XXX the vendor is blocked.  Columns can be deletes after copy / past values on the concatenate column to clear the formulas.
    2. columns L M N - if XXX the vendor has Selfbilling. Columns can be deletes after copy / past values on the concatenate column to clear the formulas. 
    3. columns O P. Columns can be deletes after copy / past values on the concatenate column to clear the formulas. 

  • Delete Column OA Standard Email 
  • Check for duplicates in all file 
  • Cross check all the vendors with the list provided by ARIBA team, delete the ones not in the initial list.
  • Add the Nodel with Vlookup formula in the last column of the file, with the information retrived from PRS in the first step. (remember to change the format of the cells to number)
  • Mark the cells in column C with red if no x in Nodel and remove this column:


  • Add two new columns (PF1 & WP1) and check if the VN and the OA are the same. Example: (=IF (C3=F3);"delete";"Keep")
    • If delete,  the OA info can be removed (OA number and email).
    • If keep, no action

Send the file to ARIBA support Team and close the request.


5. ERS detected

Each time that is detected that a supplier with ERS is also enrolled on ARIBA (or the other way opposite), the ARIBA Support Team should be contacted also using the email address Ariba.Enrolment@solvay.com via Freshdesk.

After analysis, we Data Ops. Vendors Team will be informed about which are the next steps to be performed.

6. New VAT / Vendor

Whenever Data Ops. Team is aware that an ARIBA supplier have changed their VAT number, please follow the steps below:

  • Data OPs. Vendors Team sends an email to ariba.enrolment@solvay.com via Freshdesk, informing about the new vendor code (with new VAT code), that is replacing the original ARIBA supplier (with old VAT code)
  • Carmen Chapelier will add the new vendor code to the existing ANID on Ariba and will reply to the email informing Data OPs. Vendors Team if the supplier should be activate as Standard or Enterprise
  • Data OPs. Vendors Team performs the activation of the new vendor code and the deactivation of old vendor code
  • Data OPs. Vendors Team updates the GO Live file for the two vendor codes:
    • Old vendor code will be marked as deactivated
    • New vendor code will be added and in column "Replacing another vendor code?" an YES will be inserted and the column "If yes, which?" should be populated with the old vendor code.
  • Data OPs. Vendors Team confirms that the change has been done by replying to the original email
  • Daiana Boruzs will send an email to the supplier asking them to update their Ariba account with the new information.


7. Email update

Whenever Data Ops. receives a request to update the email address of an Ariba supplier, the following steps should be followed:

1. Data team adds a note in the ticket (if the request is done via VWF, a ticket should be created) with vendor code (VN or OA code) and notifies Daiana Boruzs to check if the supplier has the account set up

2. a) If the account is set up, Daiana passes the ticket to Ariba Support Group and asks them to inform the user/supplier that the modifications need to be made by the supplier in their Ariba account

b) If the account is not set up, Daiana informs Data team to update the email address of the supplier. The next PO will be sent via Ariba to the new email address and the supplier is responsible for setting up their account 

These steps can be found in our internal Ariba FAQs.



8. Useful information

  • Differences between the Account Types: